Road closed sign

Isle of Wight roadworks and road closures 7th November 2016

Isle of Wight roadworks or road closures starting today or tomorrow.

Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.

Streetworks / Licence, Streetworks
Drainage construction in carriageway
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Mill Road
Location: at B3395 Steyne Road, Bembridge, Isle of Wight (Mill Road)
07 November — 23 December
Diversion route
Name: Diversion 1
Location: at B3395 Steyne Road, Bembridge, Isle of Wight (Diversion 1)
07 November — 23 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Streetworks / Licence, Streetworks
To carry out sewer lining in the carriageway
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Osborne Road
Location: at C59 Swanmore Road, Ryde, Isle of Wight (Osborne Road)
07 November — 10 November
Diversion route
Name: Diversion
Location: at C59 Swanmore Road, Ryde, Isle of Wight (Diversion)
07 November — 10 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Safe Access to Underground BT footway and carriageway boxes for fibre cabling and jointing in existing boxes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Crocker Street
Location: at Crocker Street, Newport, Isle of Wight (Crocker Street)
07 November — 08 November
Suspension of one-way
Name: Crocker Street
Location: at Crocker Street, Newport, Isle of Wight (Crocker Street)
07 November — 08 November
Diversion route
Name: Diversion
Location: at Crocker Street, Newport, Isle of Wight (Diversion)
07 November — 08 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

A3055 Morton Common, Brading, Isle Of Wight
07 November — 10 November
Delays likely Traffic control (two-way signals)
Works location: Brading: Property Known As Windy Ridge Down To The Traffic Lights On The Junction Between Perowne Way And Morton Ro
Works description: Sub Con Groundsell Gc16 328 We Have Looked At Both Sides Of The Road And Provided Detail And Prices For Each To Enable You To Decide Which Side The Work Should Be Done. Trees Overhang On Both Sides With That From Brading To Sandown Being The Worst. We Have Priced To Cut Back Hard All Of The Hedges And Trees Giving Island Roads, Or The Property Owner To Be Recharged, The Longest And Most Cost Effective Term For The Works. Brading To Sandown (Starting From Windy Ridge) 1. Flail Cut
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Arthurs Hill, Shanklin, Isle Of Wight
08 November — 10 November
Delays likely Traffic control (multi-way signals)
Works location: Junc. Of Atherley Rd, Hope Rd, North Rd – On A3055 Arthurs Hill, Shanklin, Po37 6ea
Works description: No Excavation – Traffic Management Only – Works On Hope Road Only (Off Peak Working)
Responsibility for works: Southern Water
Current status: Advanced planning

Crocker Street, Newport, Isle Of Wight
07 November — 08 November
Delays likely Road closure
Works location: Crocker Street Opposite Junction With St Cross Lane To Junction Of Holyrood Street Newport Isle Of Wight Po30 5jy
Works description: Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling And Jointing In Existing Boxes. No Excavation. Required For New Customer Connection
Responsibility for works: BT
Current status: Advanced planning

Hillway Road, Bembridge, Isle Of Wight
07 November — 25 November
Delays likely Road closure
Works location: Bembridge: From Junction With Howgate Road To Roundabout, 347m, Ml 340165: Hillway Road-Bembridge
Works description: Carriageway Resufacing Scheme Inclusive Of Prpreparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

North Road, Shanklin, Isle Of Wight
08 November — 10 November
Delays likely Traffic control (multi-way signals)
Works location: Junc. Of Arthurs Hill, Hope Rd & Atherley Rd – On North Rd, Shanklin, Po37 6ea
Works description: No Excavation – Traffic Management Only – Works On Hope Road Only (Off Peak Working)
Responsibility for works: Southern Water
Current status: Advanced planning

Osborne Road, Ryde, Isle Of Wight
07 November — 10 November
Delays likely Road closure
Works location: Junction Of Swanmore Road – On Osborne Road, Ryde, Po33 2tq
Works description: No Excavation – Traffic Management Only
Responsibility for works: Southern Water
Current status: Advanced planning

Parkhurst Road, Newport, Isle Of Wight
08 November — 09 November
Delays likely Traffic control (multi-way signals)
Works location: Parkhurst Road From Near Junction Hewitt Cresent To Near Junction Lonsdale Avenue Po30 5rs
Works description: Access Bt Chambers To Install New Fibre Cable
Responsibility for works: BT
Current status: Advanced planning

Atherley Road, Shanklin, Isle Of Wight
08 November — 10 November
Delays possible Traffic control (multi-way signals)
Works location: Junc. Of Arthurs Hill, Hope Rd & North Rd – On Atherley Rd, Shanklin, Po37 6ea
Works description: No Excavation – Traffic Management Only – Works On Hope Road Only (Off Peak Working)
Responsibility for works: Southern Water
Current status: Advanced planning

Blackwater Hollow, Newport, Isle Of Wight
08 November — 09 November
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: From Highwood Lane To Blackwater Farm, Ml 410012 410013 410014: Blackwater Hollow-Newport
Works description: Quatering And Hedging,2.5m, As Required Prior To Resurfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Carpenters Road, Brading, Isle Of Wight
07 November — 09 November
Delays possible Traffic control (two-way signals)
Works location: Brading: Just Past Oasis On The St Helens Bound Side Of The C/Way: Carpenters Road-Brading – 6701
Works description: Idr – Gully Cover Loose And Breaking Out, Readjust If Possible If Not Replace With New. Tm – Ds Advices Possible Two Way Temp Lights (Gl: Ironwork Rocking/Corrosion) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Embankment Road, Bembridge, Isle Of Wight
07 November — 09 November
Delays possible Traffic control (two-way signals)
Works location: Bembridge: Embankment Road, F/W O/S The Yatch Haven Clubhouse Entrance: Embankment Road-Bembridge
Works description: Footway / Pedestrian Guard Rail Repairs Remove X2 6′ Lengths Of Pedestrian Guard Rail (Existing Have Been Struck & Are Bent) Supply And Install X2 6′ Lengths Of New Guard Rail In Dbm F/W Tm N/A (H: Street Furnitre Faulty/Dmge) Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hope Road, Shanklin, Isle Of Wight
08 November — 10 November
Delays possible Traffic control (multi-way signals)
Works location: Outside 2 Flat 1 Mimosa Court – On Hope Road, Shanklin, Po37 6ea
Works description: Replace Manhole Frame And Cover In The Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning

Mill Hill Road, Cowes, Isle Of Wight
07 November — 09 November
Delays possible Traffic control (two-way signals)
Works location: Cowes: O/S 110: Mill Hill Road-Cowes
Works description: 28 Day Perm Required Sawcut And Infill Depression, 40mm Across 1.0m. Filled With Cold Lay Bitmac. Patch 1.4m X 1.4m Required. T/T/L’S Required. (Cw: Pothole) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Queens Road, Shanklin, Isle Of Wight
08 November — 10 November
Delays possible Traffic control (multi-way signals)
Works location: Junction Of North Rd – On Queens Road, Shanklin, Po37 6ea
Works description: No Excavation – Traffic Management Only – Works On Hope Road Only (Off Peak Working)
Responsibility for works: Southern Water
Current status: Advanced planning

Swanmore Road, Ryde, Isle Of Wight
07 November — 10 November
Delays possible Traffic control (multi-way signals)
Works location: From Outside 35a-43 Swanmore Road, Ryde, Po33 2tq
Works description: No Excavation Works To Carry Out Sewer Lining In The Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning

Avenue Road, Freshwater, Isle Of Wight
08 November — 10 November
Delays unlikely Some carriageway incursion
Works location: Clarence Buildings,Avenue Road,Freshwater,Iow.
Works description: – Install Water Connection To New Flats.
Responsibility for works: Southern Water
Current status: Advanced planning

Broadway Crescent, Binstead, Isle Of Wight
07 November — 31 January 2017
Delays unlikely Traffic control (give & take)
Works location: From 109 To 67 Broardway Crescent
Works description: Lay 250m Of 125mm Pe In 6″ Ci To Remove 6″ From Risk And Relay 25 Services
Responsibility for works: SGN
Current status: Advanced planning

Churchill Close, Cowes, Isle Of Wight
08 November — 18 November
Delays unlikely Traffic control (give & take)
Works location: Cowes: Whole Length Of Road From Junction With Churchill Road, 132m, Ml 160160: Churchill Close-Cowes
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Churchill Road, Cowes, Isle Of Wight
07 November — 09 November
Delays unlikely Traffic control (give & take)
Works location: Cowes: Footway Link Off Churchill Road, Ml F10707: Churchill Road-Cowes
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Court Road, Totland, Isle Of Wight
07 November — 18 November
Delays unlikely Traffic control (give & take)
Works location: Totland: From Junction With Summers Lane, 250m North, Ml 640354: Court Road-Totland
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Dolcroft Road, Rookley, Isle Of Wight
07 November — 18 November
Delays unlikely Traffic control (give & take)
Works location: Rookley: Whole Length Of Road From Junction With Niton Road, 173m, Ml 640384: Dolcroft Road-Rookley
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Rookley
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Esplanade, Ryde, Isle Of Wight
07 November — 20 November
Delays unlikely Some carriageway incursion
Works location: Outside 8/9/10 The Arcade
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Manor Crescent, Rookley, Isle Of Wight
08 November — 10 November
Delays unlikely Some carriageway incursion
Works location: 3 Manor Crescent, Rookley , Iow.
Works description: Install Water Connection To New House.
Responsibility for works: Southern Water
Current status: Advanced planning

Nelson Place, Ryde, Isle Of Wight
07 November — 13 November
Delays unlikely Some carriageway incursion
Works location: O/S 11 Nelson Place, Ryde
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Place Side, Cowes, Isle Of Wight
07 November — 13 November
Delays unlikely Some carriageway incursion
Works location: O/S 20
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Plover Close, Lake, Isle Of Wight
07 November — 13 November
Delays unlikely Some carriageway incursion
Works location: O/S 3 Plover Close, Merrie Gardens, Lake
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Riboleau Street, Ryde, Isle Of Wight
07 November — 13 November
Delays unlikely Some carriageway incursion
Works location: O/S 14
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sandy Lane, Newport, Isle Of Wight
08 November — 10 November
Delays unlikely Traffic control (give & take)
Works location: Newport: From Blackwater Hollow End Of Sandy Lane Throughout Ml 240299: Sandy Lane-Newport
Works description: Preparation Of New Concrete Beam Prior To Surfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Summers Court, Totland, Isle Of Wight
07 November — 18 November
Delays unlikely Traffic control (give & take)
Works location: Totland: From Junction With Summers Lane, 250m North, Ml 640354: Summers Court-Totland
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Fullrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning