Roadworks - Single track traffic

Isle of Wight roadworks and road closures week starting 14th March

List of Isle of Wight roadworks and road closures taking place week starting Monday 14th March 2016 as provided by Island Roads.

BEMBRIDGE:
Steyne Road will be closed between 7.30am and 5pm on each day between Monday 14 March and Friday 18 March 2016 from Mill Road to Lane End Road. The road closure is for carriageway survey and trial hole works by Island Roads.

Sandown Road (opposite the entrance to Bembridge Airport). Temporary traffic lights will be in operation from 9.30am and 3.30pm on each day between Tuesday 15 March and Thursday 17 March 2016 for carriageway repair works by Island Roads. Traffic delays will occur.

BINSTEAD:
Newnham Lane
will be closed on one day between 9am and 4pm during the period from Friday 11 March until Tuesday 15 March 2016. The closure is between Newnham Road and Firestone Copse Road. for carriageway repair works outside 21 by Island Roads

BONCHURCH:
Balaambs Passage
footpath will be closed from 8.30pm on Friday 8 January until 8.30pm on Friday 29 July 2016 between Bonchurch Village Road and The Pitts. The route for pedestrians will be: Bonchurch Village Road, Bonchurch Shute and The Pitts. The road closure is required until retaining wall repair works have been undertaken.

BRIGHSTONE:
Hunny Hill
(near the junction with Galley Lane). Temporary traffic lights will be in operation from 9.30am and 3.30pm on each day between Tuesday 15 March and Thursday 17 March 2016 for carriageway repair works by Island Roads. Traffic delays will occur.

BROOK:
Brook Road
(from Brook triangle to Dunsbury Lane). Temporary traffic lights will be in operation from 6.30am until 6pm on each day Wednesday 17 March until Monday 21 March 2016 for property access works by Island Roads. Traffic delays will occur.

CHALE:
Gotten Lane
will be closed on one day between 9am and 4pm during the period from Monday 14 March and Wednesday 16 March 2016. The closure is between Chale Street and the end of the highway adjacent to Gotten Manor for carriageway repair works by Island Roads.

CHESSELL:
Freshwater Road
(opp Chessell Wood Yard). Temporary traffic lights will be in operation from 9.30am and 3.30pm on each day between Tuesday 15 March and Thursday 17 March 2016 for drainage works by Island Roads. Traffic delays will occur.

COWES:
Newport Road
will be closed from approx. 9am on Wednesday 13 January 2016 until 4pm on Thursday 24 March 2016 between Three Gates Road and Nodes Road. The road closure is for the installation of a new 450mm size water main. The route for diverted traffic will be: Three Gates Road, Place Road and Nodes Road. The works form part of a new water main project between Three Gates Road, along Newport Road to the Newport side of Northwood traffic lights.

Baring Road will be closed from 9am on Monday 14 March until 6pm on Tuesday 15 March 2016 between Ward Avenue and Castle Road. The road closure is for sewer relining works by P Fitzsimmons Dyno Rod.

Ward Avenue will be closed from 6.30am until 6pm for approximately 5 to 10 days and nights between Monday 29 February and Friday 1 April 2016. The closure is from Park Road to Baring Road for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

Victoria Road (outside 61) Temporary traffic lights will be in operation for the installation of a new vehicle access by Dial A Rod Engineering services between 9am on Wednesday March and 4pm on Tuesday 15 March 2016. Traffic delays are likely.

EAST COWES:
Esplanade
will be closed from 2.30pm on Friday 25 April 2014 for the foreseeable future between 375 metres to the northeast of Cambridge Road and the end of the highway 860 metres to the northeast of Cambridge Road. There is no alternative route for traffic. This closure is necessary to avoid danger to persons or other traffic using the road due to a landslip.

A3021 Whippingham Road (opposite Heathfield Cottages). Temporary traffic lights will be in operation from 7.30pm until 11pm on each day (Mondays to Fridays) between Thursday 10 March and Monday 14 March 2016 for drainage repairs by Island Roads. Traffic delays will occur.

FISHBOURNE:
Elenors Grove
will be closed from 7.30pm until 6am on approximately 5 to 10 nights between Monday 7 March and Friday 1 April 2016. The closure is from Fishbourne Lane to Quarr Hill. For carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

FRESHWATER:
Bedbury Lane
(from Victoria Road to Faringford Hotel, various locations). Temporary traffic lights will be in operation from 6.30am until 6pm on each between Monday 14 March until Friday 18 March 2016 for works to vehicle access by Island Roads. Traffic delays will occur.

Bedbury Lane will be closed from 6.30am until 6pm on approximately 5 to 10 days between Monday 29 February and Friday 1 April 2016. The closure is from Victoria Road to a point 400 metres to the Northwest for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

Hooke Hill will be closed from 6.30am until 6pm on approximately 5 to 10 days between Monday 29 February and Friday 1 April 2016. The closure is from School Green Road to Copse Lane for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

GUNVILLE:
Gunville Road
(between Green Finch Close and The Bramleys). Temporary traffic lights will be in operation from 9am on Monday 29 February and Friday 18 March 2016 for the construction of a Zebra Crossing by Island Roads. Traffic delays will occur.

LAKE:
Ranalagh Road / Cliff Road / Cliff Path.
From 1200hrs on Friday 18 July 2014 for the foreseeable future the following roads / path will be closed to vehicular traffic:Cliff Road / Cliff Path will be closed from point 55 metres to the northwest of the junction with Ranalagh Road to point 185 metres to the south west of the junction with Cliff Gardens (the southern boundary of number 6). Ranalagh Road will also be closed from Cliff Road to a point 10 metres to the west of Cliff Road. During the period of closure there is no alternative route for vehicles. The closure is required due to erosion. Pedestrian access will be maintained as usual.

A3055 Sandown Road (from Winchester House to Cemetery Road). Temporary traffic lights will be in operation from 9.30am until 4pm on each day (Mondays to Fridays) between Monday 9 May and Friday 13 May 2016 for footway works by Island Roads. Traffic delays will occur.

A one way restriction will be in operation from 9am on Tuesday 8 March until 5pm on Friday 18 March 2016, along The Western side of the traffic Island (at the Southern end of The Fairway) in a Northeast direction from A3055 Lake Hill to The Fairway. All Eastbound traffic will be diverted. The one way restriction is for electric cable repair works.

NETTLESTONE:
Nettlestone Hill / Nettlestone Green
will be closed from 6.30am until 6pm on approximately 5 to 10 days between Monday 29 February and Friday 1 April 2016. The closure is from Caws Avenue to the Northern end of Nettlestone Green triangle for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

NEWPORT:
A3054 Fairlee Road
will be closed from 7.30pm until 6am on approximately 10 to 15 nights between Monday 29 February and Friday 1 April 2016. The closure is from Snooks Hill to Medina College for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

A3054 Link Road will be closed from 6.30am until 6pm on approximately 5 to 10 days between Monday 29 February and Friday 1 April 2016. The closure is from Medina Way to Fairlee Road for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

Castle Road will be closed from 9am on Monday 7 March until 6pm on Wednesday 16 March 2016, between Carisbrooke Road to its junction with Linden Road. The one way restriction will be suspended to allow access. The road closure is for sewer relining works by P Fitzsimmons Dyno Rod.

Blacklands Lane will be closed from 9am until 4pm on Wednesday 16 March and Thursday 17 March 2016 between Staplers Road and Briddlesford Road. The road closure is for tree cutting works and the replacement of overhead electric wires by Groundsell Contracting for Scottish and Southern Energy.

Wellington Road (outside 41 to junc with Kinchington Road). Temporary traffic lights will be in operation from 9.30am and 3.30pm on each day between Tuesday 28 March and Saturday 2 April 2016 for the installation of safety railings by Island Roads. Traffic delays will occur.

Sandy Lane (from Whitcombe Road to access to Whitecroft Park) Temporary traffic lights will be in operation from Tuesday 29 March until Monday 11 April 2016 for cable works by Morrison Utilities for British Telecom. Traffic delays are likely.

NORTHWOOD:
Pallance Lane
will be closed on one day between 9am and 4pm during the period from Monday 7 March until Friday 11 March 2016. The closure is between Pallance Road and Wyatts Lane for carriageway repair works by Island Roads.

ROOKLEY:
A3020 Main Road
(between Highwood Lane and the Rookley nameplate). Temporary traffic lights will be in operation from 9.30am until 3.30pm on each day between Tuesday 22 March until Thursday 24 March 2016 for carriageway repairs by Island Roads. Traffic delays will occur.

Niton Road, Rookley will be closed from 6.30am until 6pm on approximately 5 to 10 days between Monday 29 February and Friday 1 April 2016. The closure is from Main Road to Chequers Inn Road for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

A3020 Main Road (between Highwood Lane and the Rookley nameplate) Temporary traffic lights will be in operation from 9.30am and 3.30pm on each day between Tuesday 22 March and Thursday 24 March 2016 for carriageway repair works by Island Roads. Traffic delays will occur.

RYDE:
Bullen Road
will be closed for a period of 10 days during the period from 9am on Monday 29 February and 5pm on Thursday 24 March 2016 between Pondwell Close and Gregory Avenue. The road closure is for the construction of a new footway by Island Roads.

West Street will be closed on one day between 9am and 4pm during the period from Friday 11 March until Tuesday 15 March 2016. The closure is between Spencer Road and Lind Street for carriageway repair works by Island Roads.

A3055 Appley Road will be closed from 6.30pm until 6am on approximately 2 to 3 nights between Monday 29 February and Friday 1 April 2016. The closure is from Marlbourgh Road to Easthill Road for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

Argyll Street will be closed from 6.30pm until 6am on approximately 5 to 10 nights between Monday 29 February and Friday 1 April 2016. The closure is from Pellhurst Road to West Street for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

Partlands Avenue will be closed on one day between 9am and 4pm during the period between Friday 11 March and Tuesday 15 March 2016. The closure is from Pellhurst Road to its junction with Upton Road for carriageway repair works by Island Roads.

Bellevue Road will be closed on one day between 9am on Monday 14 March and 4pm on Thursday 17 March 2016 for the installation of water service connections by Clancy Docwra for Southern Water. The closure is from Dover Street to its junction with Trinity Street.

SANDOWN:
Ferncliff Path
will be closed to pedestrians from 9am on Monday 22 February until 4pm on Friday 18 March 2016 The closure is between Esplanade and Ferncliff Road for safety works by Island Roads. The alternative route for pedestrians will be: Esplanade, Pier Street, Beachfield Road and Ferncliff Road.

A one way restriction will be in operation in Station Avenue for a period of 5 days during the period from 9am on Monday 29 February until 4pm on Friday 18 March 2016 in a Westbound direction between A3055 Broadway and Hill Street. All Eastbound traffic will be diverted. The one way restriction is for the construction of a new footway and tactile crossing scheme by Island Roads. Temporary traffic lights will be in operation at the junction of A3055 Broadway and Station Avenue.

A3055 Broadway / junction with Beachfield Road. Temporary traffic lights will be in operation from 9.30am and 3.30pm on Saturday 19 March and Sunday 20 March 2016 for carriageway repair works by Island Roads. Traffic delays will occur.

SHALFLEET:
A3054 Yarmouth Road
(at Barton’s Corner) Temporary traffic lights will be in operation from 9.30am until 3.30pm on each day (between Monday 21 March and Wednesday 23 March 2016 for carriageway repairs by Island Roads. Traffic delays will occur.

SHANKLIN:
Cliff Path
will be closed from 9.30am on Monday 20 January 2014 for the foreseeable future to pedestrians from Skew Bridge Path to Winchester House Car Park. The closure is required due to erosion/ land movement. During the period of closure the alternative route for pedestrians will be; Skew Bridge Path, A3055 Sandown Road and Winchester House Car Park.

A3055 Sandown Road (from Alresford Road for approx. 300 metres towards Lake). Temporary traffic lights will be in operation from 7.30pm until 7am on each night (Mondays to Fridays- not Bank holiday Monday 2 May 2016) between Thursday 21 April and Monday 9 May 2016 for footway works by Island Roads. Traffic delays will occur.

SHANKLIN:
James Avenue
(Chelsfield Road to James Avenue). Temporary traffic lights will be in operation from 8am until 4pm on each day (Mondays to Fridays) between Thursday 10 March and Monday 21 March 2016 for footway works by Island Roads. Traffic delays will occur.

Green Lane (from Wheeler Way to Chelsfield Avenue). Temporary traffic lights will be in operation from 8am until 4pm on each day (Mondays to Fridays) between Wednesday 6 April and Tuesday 19 April 2016 for footway works by Island Roads. Traffic delays will occur.

A3055 Church Road (outside the Old Thatch Tea Rooms). Temporary 2 way traffic lights will be in operation from 9am on Friday 19 February until Friday 18 March 2016 due to scaffolding in the highway for roof repair works by Emerald Construction. Some traffic delays are likely. For further details about these works please contact Emerald Construction on 01983 526798

Green Lane (from Witbank Gardens to King Edwards Close). Temporary traffic lights will be in operation from 8am until 4pm on each day (Mondays to Fridays) between Monday 21 March and Tuesday 5 April 2016 for footway works by Island Roads. Traffic delays will occur.

Landguard Manor Road (from Green Lane to Witbank Gardens). Temporary traffic lights will be in operation from 9am until 4pm on each day (Mondays to Fridays) between Tuesday 22 March and Monday 4 April 2016 for footway works by Island Roads. Traffic delays will occur.

Eastcliff Road will be closed on one day between 9am and 4pm during the period between Friday 11 March and Tuesday 15 March 2016. The closure is from A3055 High Street to the end of the highway to the Northeast for carriageway repair works by Island Roads.

Rectory Road will be closed on one day between 9am and 4pm during the period between Friday 11 March and Tuesday 15 March 2016. The closure is from Westhill Road to the end of the highway to the Southeast for carriageway repair works by Island Roads.

Wilton Park Road will be closed from 6.30am until 6pm for approximately 5 to 10 days and nights between Monday 29 February and Friday 1 April 2016. The closure is from Arthurs Hill to Atherley Road for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

Landguard Manor Road (junction with Green Lane. Temporary traffic lights will be in operation from Monday 14 March until Friday 18 March 2016 for cable works by CCN Communications for British Telecom. Traffic delays are likely.

ST HELENS:
Eddington Road w
ill be closed from 6.30am until 6pm on approximately 5 to 10 days between Monday 29 February and Friday 1 April 2016. The closure is from The Old Rectory to Caws Avenue for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. Please note: The exact dates of the works will be confirmed on the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

Eddington Road (from the Old Rectory ton St Helens Church) Temporary traffic lights will be in operation from 6.30am until 6pm on each day Tuesday 16 March until Thursday 18 March 2016 for property access works by Island Roads. Traffic delays will occur.

ST LAWRENCE:
A3055 Undercliff Drive
will remain closed from St Catherine’s Road to Seven Sisters Road (Western Junction), between Barrington Lodge, near to the western junction with Seven Sisters Road and Mirables which is located about a mile towards Niton. Following significant ground movement in the area in early February 2014, Undercliff Drive has been physically closed between Mirables (in the west) and a point 560 metres to the West of Seven Sisters Road (in the east) for safety reasons. There is now no access for vehicles or pedestrians. A formal road and footpath closure will be in operation for the foreseeable future. Access to businesses and attractions in Undercliff Drive will be maintained. During the period of closure the alternative route for traffic will be; Pedestrians; A3055 Undercliff Drive, Public Footpath V81, V77, NT28, NT29, NT30 and A3055 Undercliff Drive. Cyclists and Equestrians; A3055 Undercliff Drive, Seven Sisters Road, St Lawrence Shute, Whitwell Road, Ventnor Road, High Street (Whitwell), Kemming Road, Chatfield Road, Rectory Road, High Street (Niton), Institute Hill, Barrack Shute and A3055 Undercliff Drive.

VENTNOR:
Longdown Steps Public Footpath V102
will be closed from 10am on Monday 12 May 2014 for the foreseeable future between South Street and St Catherine’s Street. This closure is necessary to avoid danger to persons using the footpath until wall repair works have been undertaken. The diversion route for pedestrians will be; South Street, West Street, High Street, Victoria Street, Wheelers Bay Road and St Catherine’s Street.

Castle Road (between Zig Zag Road and Gills Cliff Road) Temporary traffic lights will be in operation from Tuesday 30 December 2014 until approx. August 2016 until retaining wall works have been completed by Island Roads. Traffic delays will occur.

Spring Hill (between Grove Road and St Boniface Road) Temporary traffic lights will be in operation from 9.30am until 4pm on each day (Mondays to Fridays) between Monday 7 March and Tuesday 15 March 2016 for footway works by Island Roads. Traffic delays will occur.

WHIPPINGHAM:
Public Footpath N214
will be closed from Crematorium Road to Public Footpath N114 between 9am on Wednesday 5 August 2015 for the foreseeable future to pedestrians. The closure is required until urgent repair works have been undertaken to B171 Whippingham Cattle Creep. The alternative route for pedestrians is; Crematoriums Road, A3054 Lushington Hill, Racecourse and Fairlee Road.

WHITELEY BANK:
At the roundabout at the junction with Canteen Road / A3020 Shanklin Road. Temporary traffic lights will be in operation from 9.30am until 3.30pm on each between Tuesday 22 March and Thursday 24 March 2016 for carriageway repair works by Island Roads. Traffic delays will occur.

WHITWELL:
Ventnor Road
(from St Lawrence Shute approx. to Kemming Road, various locations). Temporary traffic lights will be in operation from 9.30am until 3.30pm on each between Tuesday 22 March and Thursday 24 March 2016 for carriageway repair works by Island Roads. Traffic delays will occur.

High Street (outside Hobbit House) Temporary traffic lights will be in operation from 9.30am until 3.30pm on each between Tuesday 22 March and Thursday 24 March 2016 for carriageway repair works by Island Roads. Traffic delays will occur.

WOOTTON:
A3054 High Street / Kite Hill
will be closed on approx. 7 nights from 7.30pm until 6am on each night (Mondays to Fridays) between Monday 15 February and approx. Tuesday 15 March 2016 (weather and other circumstances permitting). The closure is from New Road to Fishbourne Lane and is for carriageway surfacing works by Island Roads. The alternative route for vehicles will be; A3054 High Street, Station Road, Briddlesford Road, Downend Road,A3056 Arreton Street, Hale Common and Newport Road, A3055 Sandown Road, Lake Hill, Broadway, Avenue Road, Morton Common, Morton Road, New Road, High Street (Brading), Rowborough Lane, Beaper Shute, Brading Road, Marlborough Road, Alexandra Road, Stat Johns Hill, St Johns Road, Green Street, Argyll Street, Pellhurst Road, A3054 Binstead Road, Binstead Road Hill, Quarr Hill and Eleanor’s Grove. Please note: For up to date details about works see the Island Roads website at www.islandroads.com or ring Island Roads on 01983 822440.

A3054 Wootton Bridge/Kite Hill (from the access to Lakeside Hotel to the Western end of Kite Hill). Temporary traffic lights will be in operation Monday 7 March until approx. Friday 1 April 2016 for Cycleway improvement works by Island Roads. Traffic delays will occur.

YARMOUTH:
A3054 Bridge Road
(at Yarbridge) Temporary traffic lights will be in operation at times from 9.30am until 3.30pm between Mondays 14 March and Friday 18 March 2016 for Yar Bridge maintenance works by Island Roads. Some traffic delays will occur.