Road works sign

Road closures and road works: 25th September 2013

Isle of Wight Road closures and road works 25th September 2013

A3020 Blackwater Road, Newport, Isle Of Wight
25 September — 27 September
Delays likely Traffic control (Stop/Go boards)
Works location: Newport: J/O Shide Road (Bollard) J/O Shide Road (Bollard) 1st Island Bollard 1 Ist Island Bollard 2 J/O Blackwater Holl
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3020 Newport Road, Cowes, Isle Of Wight
25 September — 27 September
Delays likely Traffic control (Stop/Go boards)
Works location: Cowes: J/O Three Gates Road (Bollard 2) J/O Nodes Road (Bollard 2) J/O Nodes Road (Bollard 1):
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3020 St Georges Way, Newport, Isle Of Wight
25 September — 27 September
Delays likely Traffic control (Stop/Go boards)
Works location: Newport: On Island Bollard Island Adj Matalan Bollard On Island Bollard O/S F/C Bollard 1 F/C Entrance Bollard 2 O/S F/C
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Brading Road, Ryde, Isle Of Wight
25 September — 29 September
Delays likely Traffic control (Stop/Go boards)
Works location: Ryde: On Island (Bollard) First Bollard Last Island (1st Bollard) Last Bollard: Brading Road-Ryde
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Marlborough Road, Ryde, Isle Of Wight
25 September — 27 September
Delays likely Traffic control (Stop/Go boards)
Works location: Ryde: J/O Westridge Cross (Bollard 1): Marlborough Road-Ryde
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3056 Arreton Road, Arreton, Isle Of Wight
25 September — 01 October
Delays likely Road closure
Works location: Arreton: From Downend Road 400m South (Ml410056): Arreton Road-Arreton
Works description: Carriageway Reconstruction, Planing And Resurfacing.Night Work.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3323 South Street, Newport, Isle Of Wight
25 September — 27 September
Delays likely Traffic control (Stop/Go boards)
Works location: Newport: J/O Town Lane Bollard 2 O/S Handm Bollard 2 : South Street-Newport
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Drill Hall Road, Newport, Isle Of Wight
26 September — 27 September
Delays likely Road closure
Works location: Newport: From Caesars Road To Carisbrooke Road (Ml241331): Drill Hall Road-Newport
Works description: Surfacing Preparatory Works, Replacing And Relaying Kerbs
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Lower Green Road, St Helens, Isle Of Wight
26 September — 26 September
Delays likely Road closure
Works location: Upper Green Road, Mill Road, Lower Green Road And Vine Road
Works description: St Helens Carnival – 26 September 2013 – Upper Green Road, Mill Road, Lower Green Road And Vine Road
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Milford Road, Shanklin, Isle Of Wight
26 September — 30 September
Delays likely Road closure
Works location: Shanklin: From Atherley Road To Avenue Road (Ml441228): Milford Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Northcliff Gardens, Shanklin, Isle Of Wight
25 September — 27 September
Delays likely Road closure
Works location: Shanklin: From St Martins Avenue To St Boniface Cliff Gardens (Ml441298): Northcliff Gardens-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

School Lane, Carisbrooke, Isle Of Wight
26 September — 01 October
Delays likely Road closure
Works location: Carisbrooke: From Carisbrooke High Street To Gunville/Priory Road Junction (220127): School Lane-Carisbrooke
Works description: Carriageway Reconstruction, Planing And Surfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3020 Main Road, Rookley, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Rookley: O/S Amberlake Bollard 2 O/S Haethlands Bollard 2 O/S Heathlands Bollard 1 : Main Road-Rookley
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Bridge Road, Yarmouth, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Yarmouth: On Island Bollard Adj Bus Station Exit : Bridge Road-Yarmouth
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Forest Road, Newport, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: J/O Standen Av Bollard 2 J/O Gunville Rd Bollard 2 O/S No 9 Bollard 1 O/S School C/P Bollard 1 O/S School C/P B
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 River Road, Yarmouth, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Yarmouth: O/S School Bollard O/S School Bollard On Island Bollard : River Road-Yarmouth
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Marlborough Road, Ryde, Isle Of Wight
26 September — 30 September
Delays possible
Works location: 460396 091566 Marlborough Road Junction Of Tru-Cast Access Road Ryde Po33 1ad
Works description: Interim To Perm
Responsibility for works: BT

A3056 Newport Road, Lake, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Lake: Sign Epc Sc Flasher, Opp School Field: Newport Road-Lake
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3325 Terminus Road, Cowes, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Cowes: J/O Carvel Lane (Bollard 1) J/O Carvel Lane (Bollard 2): Terminus Road-Cowes
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3328 Chine Avenue, Shanklin, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Shanklin: J/O High St Bollard J/O High St Bollard 2 : Chine Avenue-Shanklin
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3330 Alexandra Road, Ryde, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Ryde: J/O Appley Road (Bollard) J/O Appley Road (Bollard): Alexandra Road-Ryde
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3341 St Georges Approach, Newport, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: On Island Bollard : St Georges Approach-Newport
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Downend Road, Newport, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: (Robin Hill Roundabout) J/O Downend Bollard J/O Long Lane Bollard On Downs Rd – Pillar : Downend Road-Newport
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Elm Lane, Calbourne, Isle Of Wight
26 September — 30 September
Delays possible Traffic control (Stop/Go boards)
Works location: Calbourne: On Carriageway From O/S “Bolands” To “Langbridge Farm” Elm Lane: Elm Lane-Calbourne
Works description: Five Pot Holes And Edge Of Carriageway Defects
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Church Litten, Newport, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: J/O Marks And Spencers (Bollard 1) On Island Bollard: Church Litten-Newport
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Carter Street, Sandown, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Sandown: J/O Avenue Rd Bollard 2 J/O Avenue Rd Bollard 1 : Carter Street-Sandown
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Riverway, Newport, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: O/S Lydl Bollard 1 J/O Slip Rd Bollard 1 O/S Lydl Bollard 1 O/S Lydl Bollard 2 J/O Slip Rd Bollard 2 : Riverway
Works description: Electrical Testing Of Powered Apparatus
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Union Road, Cowes, Isle Of Wight
25 September — 27 September
Delays possible Traffic control (Stop/Go boards)
Works location: Cowes: J/O Park Road (Bollard) J/O Park Road (Bollard): Union Road-Cowes
Works description: Electrical Testing Of Powered Apparatus Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Image: Stew Dean under CC BY 2.0