Road closed sign:

Road closures and road works: 7th November 2013

Isle of Wight road works starting today or tomorrow.

A3054 Elenors Grove, Binstead, Isle Of Wight
07 November — 08 November
Delays likely Traffic control (Stop/Go boards)
Works location: Binstead: Jo Fishbourne Lane Newport Bound Lane Near Side Wheel Track: Elenors Grove-Binstead
Works description: Idr 0.5×0.3x60mm Stop/Go Tm (Cw: Pothole)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3329/A3055 Avenue Road, Sandown, Isle Of Wight
07 November — 14 November
Delays likely Road closure
Works location: Sandown: From Broadway 310m North (Ml310031): Avenue Road-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Whitcombe Road, Newport, Isle Of Wight
08 November — 15 November
Delays likely Road closure
Works location: Newport: From Froglands Lane Heading East For 415m Round Corner Untill Junction With Industrial Estate (Ml 230121):
Works description: Carriageway Reconstruction, Planing And Surfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Newport Road, Niton, Isle Of Wight
08 November — 08 November
Delays likely Road closure
Works location: Niton: Outside Palmer’S Forge: Newport Road-Niton
Works description: C/Way Patch Repair Approx 16m2 And Repair 1 Xpthole. Tm=Gandt. No Waiting Cones May Be Required Opposite.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Station Road, Wootton, Isle Of Wight
08 November — 14 November
Delays likely Road closure
Works location: Wootton: From Park Road To Littletown Lane (Ml320170): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. Ff-Stren100:U/H2, Strengthen 25mm Ul-M And 75mm Hdm50-Urban:H2)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Pan Lane, Niton, Isle Of Wight
08 November — 11 November
Delays likely Road closure
Works location: Niton: From Church Street 240m North (Ml560326): Pan Lane-Niton
Works description: Carriageway Reconstruction And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Pomona Road, Shanklin, Isle Of Wight
07 November — 13 November
Delays likely Road closure
Works location: Shanklin: From High Street To Florence Road (Ml440283): Pomona Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
07 November — 11 November
Delays possible
Works location: 449197 090864 Approx 35m South Of Jnc Partridge Road, Newport , Parkhurst Road
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT

A3054 Yarmouth Road, Calbourne, Isle Of Wight
07 November — 11 November
Delays possible Traffic control (Stop/Go boards)
Works location: Near Hebberdens Farm
Works description: No Excavations, Stop And Go Boards In Use To Pull Up Overhead Cable
Responsibility for works: Southern Electric

A3055 High Street, Ventnor, Isle Of Wight
07 November — 07 November
Delays possible Traffic control (Stop/Go boards)
Works location: Ventnor: O/S 157 High Street (Aratrum Cottage): High Street-Ventnor
Works description: Idr – Delamination Of Anti-Skid. 2sqm Patch. Tm – Two Way Temp Lights Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3323 Clatterford Road, Newport, Isle Of Wight
07 November — 07 November
Delays possible Traffic control (two-way signals)
Works location: Newport: E/B C/Way O/S 28: Clatterford Road-Newport
Works description: Complete By 19/06/2013 09:23:15 X1 C/Way Patch 4.8mx1.5m – Tm: Priority Signs As Per Page 57, No Parking Cones Will Need To Be Set Out Prior To Works Being Undertaken. Schedulers, John Nb: The Area Has Been Spot Marked.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3330 Carpenters Road, Brading, Isle Of Wight
08 November — 11 November
Delays possible Traffic control (Stop/Go boards)
Works location: Brading: O/S Brookside On The S/B C/Way Towards Brading O/S Olive Cottage On The Same Side.
Works description: Idr – Pothole In Centre Of C/Way .60 X .20 X 40m .70 X .30 X 50mm Tm – G And T Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Princes Esplanade, Gurnard, Isle Of Wight
07 November — 15 November
Delays possible Traffic control (two-way signals)
Works location: Gurnard: From Shore Road 300m North (Ml130114): Princes Esplanade-Gurnard
Works description: Surfacing Preparatory Works, Replacing And Relaying Kerbs Gurnar
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Image: Ell Brown under CC BY 2.0