Road closed block

Road closures and road works: 12th December 2013

For a full list of roadworks and road closures across the Island, see our weekly list.

Below are details of roadworks starting today or tomorrow.

A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
13 December — 16 December
Delays likely Traffic control (Stop/Go boards)
Works location: East Cowes: Down Past The Alverstone Road Turning Before You Reach The Illuminated National Speed Limit Sign On The Newp
Works description: Idr – Small Section Of F/Way Is Breaking Up. Needs An .80 X .30 Patch Put Down To Rectify
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Brading Road, Ryde, Isle Of Wight
12 December — 31 December
Delays likely Traffic control (multi-way signals)
Works location: Ryde: From Marlborough Road, South To Last Light (Ml 310047, 310048, 310049, 310050):
Works description: Install No 28 Lanterns ( No 19 X 8m Columns) 1 X 40 Mph Sign, 2 Route/Direction Signs, 1 Warning Sign, 1 Public Notice, 1 Iow Radio Sign And 1 Advert Banner Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3328 Chine Avenue, Shanklin, Isle Of Wight
12 December — 17 December
Delays likely Road closure
Works location: Shanklin: From Queens Road To The High Street (Ml430088): Chine Avenue-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3329/A3055 Avenue Road, Sandown, Isle Of Wight
12 December — 23 December
Delays likely Road closure
Works location: Sandown: From Broadway 310m North (Ml310031): Avenue Road-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H1, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H1) Sandow
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3399 Chale Street, Chale, Isle Of Wight
13 December — 19 December
Delays likely Road closure
Works location: Chale: From Gotten Lane 320m South (Ml530087): Chale Street-Chale
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3) Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Brannon Way, Wootton, Isle Of Wight
13 December — 13 December
Delays likely Road closure
Works location: Brannon Way, Wootton (Between High Street & Entrance To Car Park)
Works description: Christmas Festival – Friday 13th December 2013
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Market Street, Ventnor, Isle Of Wight
13 December — 17 December
Delays likely Road closure
Works location: Ventnor: From High Street To Albert Street (Ml541264): Market Street-Ventnor
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3020 Medina Way, Newport, Isle Of Wight
12 December — 13 December
Delays possible Lane closure
Works location: Newport: On Southbound Carriageway Lanes 1 And 2: Medina Bridge—A3020 Medina Bridge, Newport
Works description: Removal Of Defective Mechanical Expansion Joint. Existing Concrete Upstands To Remove Joints Are To Be Carefully Removed Down To Existing Bridge Deck, A Compressable Filler Is To Be Placed Between The Bridge Deck And Abutment. Any Concrete Repairs Are To
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Bouldnor Road, Yarmouth, Shalfleet, Isle Of Wight
13 December — 17 December
Delays possible
Works location: 436324 089780 Bouldnor Road Bouldner Isle Of Wight Po41 0ur, Bouldnor Road
Works description: Provide 1 Cable Connection To Pole,Provide 1 New Pole,Provide 2null Or Renew Fittings On An Existing Pole,Recover 1 Existing Pole
Responsibility for works: BT

A3055 Lake Hill, Lake, Isle Of Wight
13 December — 17 December
Delays possible
Works location: 8 Lake Hill
Works description: Interim To Permanment Reinstatement
Responsibility for works: Southern Water

A3055 New Road, Brading, Isle Of Wight
13 December — 16 December
Delays possible Traffic control (Stop/Go boards)
Works location: Brading: O/S 75:
Works description: Make Safe Pothole 300x300x40mm. Tm=Stop/ Go. (Cw: Pothole) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Sandown Road, Shanklin, Isle Of Wight
12 December — 13 December
Delays possible
Works location: Shanklin: St Martins Av Jo Arthur’S Hill Sk: Sandown Road-Shanklin
Works description: Rebed Street Nameplate In Fw, Tm=Give And Take Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3330 Eddington Road, Seaview, Isle Of Wight
12 December — 13 December
Delays possible Traffic control (Stop/Go boards)
Works location: Seaview: O/S The Priory, Eddington Road, Nettlestone: Eddington Road-Seaview
Works description: Pothole: E/B C/Way Towards St. Helens 1.0m X .40 And 50mm Deep Tm – Two Way Temp Lights Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Merstone Lane, Godshill, Isle Of Wight
12 December — 13 December
Delays possible Traffic control (Stop/Go boards)
Works location: Godshill: Bohemia Cottage: Merstone Lane-Godshill – 7315
Works description: Blocked Gulley, Stop/Go Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Hollis Drive, Brighstone, Isle Of Wight
12 December — 13 December
Delays possible Traffic control (Stop/Go boards)
Works location: Brighstone: Hollis Drive-Brighstone, On Footway O/S No 3, At The Base Of Lamp Column No5: Hollis Drive-Brighstone
Works description: Idr. Bitmac Footway Repair With A 600mm X 600mm Patch, Tm=None. Brighs
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Hornsey Rise, Brading, Isle Of Wight
12 December — 14 December
Delays possible Traffic control (multi-way signals)
Works location: Brading: Junction Of New Road / Hornsey Rise (Eastbound): Hornsey Rise-Brading
Works description: Traffic Signal Detector Loop Replacement Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Image: Ell R Brown under CC BY 2.0