Road closures and road works: 20th February 2014

For details of week’s road closures and road works see our weekly update.

Long term closures (non flooding):

Cliff Path, Lake – closed to vehicles due to safety reasons
Cliff Path, Lake – closed to pedestrians from Winchester house car park to Skew Bridge path / Lake Cliff Gardens due to safety reasons
Cliff Path, Shanklin – closed to pedestrians between Delphi Road and St Boniface Cliff Road due to safety reasons
Knighton Lane & Knighton Shute, Newchurch – closed due to a poor surface (these roads will remain closed until the area dries out as the proposed surface treatment cannot be applied while the roads are wet)
Rew Lane, Ventnor – closed due to a poor surface
Undercliff Drive, Niton – between Mirables (in the west) and Seven Sisters Road (in the east) – closed for safety reasons

Roads closed due to flooding:

Harding Shute, Ryde
Golf Links Road, Sandown

Works starting today or tomorrow

A3054 Bouldnor Road, Yarmouth, Shalfleet, Isle Of Wight
21 February — 06 March
Delays likely Traffic control (give & take)
Works location: Shalfleet: From Junction Of Thorley Road, West To End (Ml 610019, 610020):
Works description: Install No 3 Lanterns ( No 0 Columns) 1 Route/Direction Sign Shalfl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Racecourse, Newport, Isle Of Wight
21 February — 06 March
Delays likely Traffic control (multi-way signals)
Works location: Newport: From Lushington Hill, West To Whippingham Road (Ml 210057, 310001):
Works description: Install No 18 Lanterns ( No 3 Columns) 3 Warnign Signs And 1 Public Notice Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Cross Road, Lake, Isle Of Wight
20 February — 27 February
Delays likely Road closure
Works location: Lake: From Heath Road To Stag Road (Ml460392): Cross Road-Lake
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Stag Road, Lake, Isle Of Wight
21 February — 27 February
Delays likely Road closure
Works location: Lake: From Cross Road 79m East (Ml460392a): Stag Road-Lake
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Sandown Road, Lake, Isle Of Wight
20 February — 24 February
Delays possible
Works location: Pedestal, Fw, Sandown Road, Next To Benches @ Traffic Lights For Newport Rd ( Nr Post Office )
Works description: Excavation To Remove A Royal Mail Pouch Box
Responsibility for works: Romec Ltd

A3055 Sandown Road, Lake, Isle Of Wight
20 February — 24 February
Delays possible
Works location: Pedestal. Fw. O/S Shops, Possibly 3 Sandown Road
Works description: Excavation To Remove A Royal Mail Pouch Box
Responsibility for works: Romec Ltd

B3330/A3055 Appley Road, Ryde, Isle Of Wight
20 February — 20 February
Delays possible Traffic control (two-way signals)
Works location: Ryde: Junction Of Apply Road/ Mariner Avenue: Appley Road-Ryde
Works description: Sub Cont – Removal Of 2no. Trees Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Park Road, Wootton, Isle Of Wight
21 February — 06 March
Delays possible Traffic control (multi-way signals)
Works location: Wootton: From Lushington Hill, South To Station Road (Ml 320189, 320186):
Works description: Install No 3 Lanterns ( No 1 X 8m Columns) 1 Warning Sign Wootto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Image: © Marcus Matthews