Road closed

29 Isle of Wight road works starting today or tomorrow

For details of week’s road closures and road works see our weekly update.

Long term closures (non flooding):

Cliff Path, Lake – closed to vehicles due to safety reasons
Cliff Path, Lake – closed to pedestrians from Winchester house car park to Skew Bridge path / Lake Cliff Gardens due to safety reasons
Cliff Path, Shanklin – closed to pedestrians between Delphi Road and St Boniface Cliff Road due to safety reasons
Hill Place Lane – closed to vehicles due to safety reasons
Knighton Lane & Knighton Shute, Newchurch – closed due to a poor surface (these roads will remain closed until the area dries out as the proposed surface treatment cannot be applied while the roads are wet)
Rew Lane, Ventnor – closed due to a poor surface
Undercliff Drive, Niton – between Mirables (in the west) and Seven Sisters Road (in the east) – closed for safety reasons

Roadworks starting today or tomorrow

A3020 High Street, Godshill, Isle Of Wight
05 March — 07 March
Delays likely Traffic control (Stop/Go boards)
Works location: Godshill: Next To Jasmine Cottage. Large Pothole To Side Of Southbound C/W. In Wheel Line.: High Street-Godshill
Works description: Repair C/W Pothole Measures 850 X 450 X 75mm Depth. Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
05 March — 05 March
Delays likely Traffic control (multi-way signals)
Works location: Main Road Jcn Of Station Road Shalfleet Isle Of Wight Po30 4nn
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes – Highway Will Be Unaffected. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT

A3054 West Street, Ryde, Isle Of Wight
04 March — 10 March
Delays likely Road closure
Works location: O/S 13 To O/S 14 Crossing Carrigway To Opp 14 West Street , West Street
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 18m Of 1 Way Poly Duct In Carriageway,Install 36m Of 1 Way Poly Duct In Footway
Responsibility for works: BT

A3055 High Street, Brading, Isle Of Wight
04 March — 07 March
Delays likely Road closure
Works location: Brading Post Office,The Bull Ring,High Street,Brading,Iow.
Works description: Carry Out Cctv Survey Of The Sewer Pipe Line Form The Bull Ring To Quay Lane,Brading High Street.No Excavation Required.
Responsibility for works: Southern Water

A3055 Zig Zag Road, Ventnor, Isle Of Wight
04 March — 11 March
Delays likely Road closure
Works location: 48 Zig Zag Road , Ventnor, Isle Of Wight.
Works description: Install New Water Service Connection
Responsibility for works: Southern Water

Burnt House Lane, Newport, Isle Of Wight
04 March — 30 March
Delays likely Road closure
Works location: Newport: From Downend Road 562m West (Ml440192): Burnt House Lane-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H4) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Long Lane, Newport, Isle Of Wight
04 March — 07 March
Delays likely Road closure
Works location: In Tarmac Crossing Carraigeway Junction Of Staplers Road In, Long Lane
Works description: Install 17m Of 2 Poly Ducts In Carriageway,Install 2m Of 1 Way Poly Duct In Footway
Responsibility for works: BT

Cliff Way, Lake, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Lake: From Araluen Way The Entire Length (Ml440391 And 91a): Cliff Way-Lake
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Crescent Road, Shanklin, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Shanklin: From Queens Road To Clarendon Road (Ml440245): Crescent Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Fitzroy Street, Sandown, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Sandown: From Station Avenue To Melville Street (Ml440338): Fitzroy Street-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Sandow
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Green Lane, Shanklin, Isle Of Wight
04 March — 30 March
Delays likely Road closure
Works location: Shanklin: From Landguard Manor Road To Witbank Gardens (Ml430256): Green Lane-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Hyde Road, Shanklin, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Shanklin: From 160m West Of Landguard Road A Further 280m West (Ml440266): Hyde Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Milton Road, Cowes, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Cowes: From Newport Road To Tennyson Road (Ml140221): Milton Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Trengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Sibden Road, Shanklin, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Shanklin: From Furze Hill Road 221m West (Ml441295): Sibden Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Skinners Hill, Newchurch, Isle Of Wight
04 March — 11 March
Delays likely Road closure
Works location: Newchurch: From A Point B50m West Of Hill Top For A Further 160m West (Ml440434): Skinners Hill-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Newchu
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Spring Gardens, Shanklin, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Shanklin: From Clarendon Road To St Pauls Avenue (Ml440297): Spring Gardens-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Wilkes Road, Sandown, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Sandown: From High Street To York Road (Ml441378): Wilkes Road-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Sandow
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

York Road, Sandown, Isle Of Wight
04 March — 31 March
Delays likely Road closure
Works location: Sandown: From High Street To St Johns Road (Ml440382): York Road-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Sandow
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3020 School Road, Godshill, Isle Of Wight
05 March — 07 March
Delays possible Traffic control (Stop/Go boards)
Works location: Godshill: Main Road Between School Crescent And Entrance To Godshill Village. Several Large Potholes Across The Carriag
Works description: Please Fill 2 Large Potholes No Need For Saw Cut Edges Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Aspen Close, Newport, Isle Of Wight
05 March — 07 March
Delays possible Traffic control (two-way signals)
Works location: Down Main Road From Jcn At Highwood Lane Continuing Down To Jcn With Niton Rd
Works description: Recovery Of Redundant Openreach Cable Using Two-Way Rolling Traffic Lights Requiring No Excavation And No Works To Take Place On Junctions Any Queries Please Contact Co-Ordinating Engineer Mick Daltrey 07436541590
Responsibility for works: BT

B3323 St James Street, Newport, Isle Of Wight
04 March — 11 March
Delays possible
Works location: O/S 84
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3327 Clarence Road, Wroxall, Isle Of Wight
04 March — 06 March
Delays possible Traffic control (Stop/Go boards)
Works location: Wroxall: O/S No.’S 40 To 44 Clarence Road: Clarence Road-Wroxall
Works description: 3 X Ph’S T .60 X .60 X 30mm .60 X .70 X 35mm 1.0 X .50 X 40mm Tm – Give And Take On A Stop And Fill Basis – 30mph Road Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3327 High Street, Wroxall, Isle Of Wight
04 March — 06 March
Delays possible Traffic control (Stop/Go boards)
Works location: Wroxall: Just Up From Methodist Church – By Zebra Crossing:
Works description: Pothole In Road – Recently Filled Pothole Has Lost It’S Filling So Now Large Hole Again (Enquiry 16018702) (Cw: Pothole) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3327 High Street, Wroxall, Isle Of Wight
04 March — 06 March
Delays possible Traffic control (Stop/Go boards)
Works location: Wroxall: Opposite Jct With Station Road In High Street. Near The Worsley Pub: High Street-Wroxall
Works description: Pothole . 850 X 400 X 80mm Depth. On Left Side Of Nth Bnd C/W. Tm Give And Take. Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3327 St Johns Road, Wroxall, Isle Of Wight
04 March — 06 March
Delays possible Traffic control (Stop/Go boards)
Works location: Wroxall: St Johns Road, Near Worsley Drive, Heading Out Of Wroxal Heading Towards The Donky Place:
Works description: Pothole In Road – Pothole, Photos Attached Lady Thinks She Has Damaged Her Car And Back. She Will Be Completing A Claim Form On Line (Enquiry 16016493) (Cw: Pothole) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3401 High Street, Carisbrooke, Isle Of Wight
04 March — 12 March
Delays possible Traffic control (two-way signals)
Works location: Os Land Adj To Noahs Ark, Inbetween No’S 22 And 24b/D
Works description: Lay New Service From Main In Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc

Niton Road, Godshill, Isle Of Wight
05 March — 07 March
Delays possible Traffic control (two-way signals)
Works location: Down Niton Rd (Godshill) From Fork In Road At Niton Rd (Rookley) Down To The Junction With Shinybricks Lane
Works description: Recovery Of Redundant Openreach Cable Using Two-Way Rolling Traffic Lights Requiring No Excavation And No Works To Take Place On Junctions Any Queries Please Contact Co-Ordinating Engineer Mick Daltrey 07436541590
Responsibility for works: BT

Niton Road, Rookley, Isle Of Wight
05 March — 07 March
Delays possible Traffic control (two-way signals)
Works location: Down Niton Rd From Jcn With Main Rd And Finishing Down Niton Road At Fork In The Road With Roud Rd.
Works description: Recovery Of Redundant Openreach Cable Using Two-Way Rolling Traffic Lights Requiring No Excavation And No Works To Take Place On Junctions Any Queries Please Contact Co-Ordinating Engineer Mick Daltrey 07436541590
Responsibility for works: BT

West Street, Wroxall, Isle Of Wight
04 March — 06 March
Delays possible Traffic control (Stop/Go boards)
Works location: Wroxall: In Middle Of Road Just Past Post Office:
Works description: Please Fix Pothole Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Image: oatsy under CC BY 2.0