Road closed sign:

Road closures and road works: 7th January 2014

Works starting today or tomorrow, depending on the weather.

A3055 High Street, Brading, Isle Of Wight
08 January — 10 January
Delays likely Road closure
Works location: Brading: Near Door To Number 65: High Street-Brading
Works description: Surface Around Side Entry Gully Breaking Up. Needs Rebedding. Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Newport Road, Niton, Isle Of Wight
07 January — 10 January
Delays likely Road closure
Works location: Rookley: From A Ponit 314m South Of Southford Lane For A Further 290m South (Ml530098): Highwood Lane-Rookley
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Newport Road, Niton, Isle Of Wight
07 January — 31 January
Delays likely Road closure
Works location: Niton: From Laceys Lane 300m North (Ml530093): Newport Road-Niton
Works description: Carriageway Reconstruction, Planing And Resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Whitwell Road, Godshill, Isle Of Wight
07 January — 13 January
Delays likely Road closure
Works location: Godshill: From Beacon Alley 430m North (Ml530143): Whitwell Road-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Alverstone Road, Newchurch, Isle Of Wight
08 January — 08 January
Delays likely Road closure
Works location: 20 Yds North George Jenkins Entrance
Works description: Relay 2 X Valve Boxes
Responsibility for works: Southern Gas Networks Plc

Copse Lane, Freshwater, Isle Of Wight
07 January — 08 January
Delays likely Road closure
Works location: Freshwater: On The Carriageway Of Copse Lane, Freshwater O/S 1and2 Lilac Cottages.: Copse Lane-Freshwater
Works description: A Patch Is Required To Repair A Sunken Section Of Carriageway (

East Dene Lane, Bonchurch, Ventnor, Isle Of Wight
07 January — 31 January
Delays likely Road closure
Works location: Ventnor: From Bonchurch Shute Heading South East To Dead End (Ml 560318):
Works description: Carriageway Reconstruction, Planing And Surfacing Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Market Street, Ventnor, Isle Of Wight
07 January — 31 January
Delays likely Road closure
Works location: Ventnor: From High Street To Albert Street (Ml541264): Market Street-Ventnor
Works description: Carriageway Reconstruction, Planing And Resurfacing. Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Princes Esplanade, Gurnard, Isle Of Wight
07 January — 31 January
Delays likely Road closure
Works location: Gurnard: From Shore Road 300m North (Ml130114):
Works description: Carriageway Reconstruction, Planing And Resurfacing. Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Fairlee Road, Newport, Isle Of Wight
08 January — 10 January
Delays possible Traffic control (two-way signals)
Works location: Newport: From Outside Island Harbour Entrance To North Fairlee Road Entrance(Ml 210045): Fairlee Road-Newport
Works description: Footway Re Construction And Surfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Military Road, Freshwater, Isle Of Wight
07 January — 08 January
Delays possible Traffic control (Stop/Go boards)
Works location: Freshwater: Military Road-Freshwater, 60metres West Of Brook Chine Car Park.: Military Road-Freshwater
Works description: Idr, Pot Hole, 520mm X 280mm X 45mm Deep. Tm=Gandt . Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3323 Carisbrooke Road, Newport, Isle Of Wight
07 January — 08 January
Delays possible Traffic control (two-way signals)
Works location: Newport: O/S 108 N/E C/W: Carisbrooke Road-Newport
Works description: Idr – Rebed A Sunken Fire Hydrant Tm Stop Go Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3325 Place Road, Cowes, Isle Of Wight
07 January — 09 January
Delays possible Traffic control (two-way signals)
Works location: Cowes: Between 2 Jct’S ‘Old Place Rd’, Adj Place Side: Place Road-Cowes
Works description: Idr. Patch 6.1 X 0.7m. Longitudinal Crack.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Bellevue Road, Cowes, Isle Of Wight
07 January — 09 January
Delays possible Traffic control (two-way signals)
Works location: Cowes: O/S 66-72: Bellevue Road-Cowes
Works description: Patch F/W Adj Kerb, As Marked With White Paint (Ignore Yellow)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Main Road, Chillerton, Isle Of Wight
07 January — 08 January
Delays possible Traffic control (Stop/Go boards)
Works location: Chillerton: Main Road-Chillerton Opposite The Entrance To Brook Lane/ Brook Cottage.: Main Road-Chillerton
Works description: Idr, Pot Hole, 380mm X 360mm X 35mm Deep, Tm=Stop/Go Boards Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Hillway Road, Bembridge, Isle Of Wight
08 January — 15 January
Delays possible Traffic control (Stop/Go boards)
Works location: Bembridge: O/S Tall Trees: Hillway Road-Bembridge – 436
Works description: Installation Of 2no. Gullies And Associated Pipework (Drain-Blocked/Non Func./Broken) As Per G. Stretch Or S. Marlton Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Image: Ell R Brown under CC BY 2.0