Bath Road roadworks signage

Roadworks and road closures: 14th July

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Lushington Hill, Newport, Isle Of Wight
14 July — 14 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport at Newport: From Racecourse Roundabout To Park Road (Ml 310001): Lushington Hill-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Lushington Hill, Newport, Isle Of Wight
14 July — 14 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban: H1) Newport at Newport: From 600 Metres East Of Park Road To Palmers Road (Ml310004): Lushington Hill-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Lushington Hill, Newport, Isle Of Wight
14 July — 14 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban: H1) Newport at Newport: From 300 Metres East Of Park Road To 600 Metres East Of Park Road (Ml310003): Lushington Hill-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Lushington Hill, Newport, Isle Of Wight
14 July — 14 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport at Newport: From Park Road To 300 M East Thereof (Ml 310002): Lushington Hill-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
14 July — 15 July Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – Edge Of C/Way Crumbling Away In 2 Stretches 2 X Patches Required Appx. 10.0 X .50 X 100/150mm 20.0 X .50 X 100/150mm Tm – Two Way Temp Lights (Cw: Pothole) Shalfleet at Shalfleet: Between Hamstead Lodge And Stick Cottage On The E/B C/Way Towards Shalfleet: Main Road-Shalfleet
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Roud Road, Godshill, Isle Of Wight
15 July — 16 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4 Godshill at Godshill: From Beacon Alley 298m South (Ml 540156): Roud Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Shinybricks Lane, Godshill, Isle Of Wight
14 July — 16 July Road closure
Delays likely due to Streetworks
Surfacing Preparatory Work, Siding Out And Hedge Cutting Godshill at Godshill: From Appleford Lane To Newport Road (Ml540157): Shinybricks Lane-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Union Road, Ryde, Isle Of Wight
15 July — 20 July Road closure
Delays likely due to Streetworks
Lay New Service From Nearside Carriageway To Site at Os 29a
Responsibility: SGN
EToN status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
15 July — 21 July Traffic control (two-way signals)
Delays possible due to Streetworks
Idr – 2 Large Patches Of Uneven Road Surface Due To Crazing Requires One Large Piece Of Patching 22.0 X 3.0 X 100/150 Tm – Two Way Temp Lights (Cw: Pothole) Freshwater at Freshwater: O/S No. Walpan Cottages: Military Road-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Briddlesford Road, Newport, Isle Of Wight
14 July — 16 July Traffic control (two-way signals)
Delays possible due to Streetworks
Idr – Supply/ Install 6no. B/W Bollards Tm – Two Way Temp Lights Newpor at Newport: On N/B C/Way At Z Bend Just Past The Civic Amenity Centre: Briddlesford Road-Newport:; Scheduler Ops Hub
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3322 The Broadway, Totland, Isle Of Wight
15 July — 22 July Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Dee’S Scaffold) at O/S Solent House
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Brook Furlong, Bembridge, Isle Of Wight
14 July — 16 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Bembridge at Bembridge: From Downsview Road To Howgate Road (Ml340279): Brook Furlong-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Crescent Road, Shanklin, Isle Of Wight
14 July — 16 July Traffic control (give & take)
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct In Footway at In F/W Os 1 To 8 Samantha Court On, Crescent Road
Responsibility: BT
EToN status: Advanced planning

Hamilton Road, Binstead, Isle Of Wight
14 July — 17 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Binstead at Binstead: First R/H Section Of Hamilton Road (Ml 341545): Hamilton Road-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Hope Road, Shanklin, Isle Of Wight
14 July — 22 July No carriageway incursion
Delays unlikely due to Streetworks
Relay Service From Nearside Footway To Site at Os 11
Responsibility: SGN
EToN status: Advanced planning

Lower Furlongs, Brading, Isle Of Wight
15 July — 23 July No carriageway incursion
Delays unlikely due to Streetworks
Relay Service From Nearside Footway To Site at Os 30
Responsibility: SGN
EToN status: Advanced planning

Meadow Drive, Bembridge, Isle Of Wight
15 July — 17 July No carriageway incursion
Delays unlikely due to Streetworks
Install 1 Of 1 Way Power Duct In Verge,Install 1m Of 1 Way Power Duct In Footway,Performing An 1excavation To Expose Existing Power Cable In Footway at Opposite Wentworth , Meadow Drive
Responsibility: BT
EToN status: Advanced planning

Mount Pleasant Road, Newport, Isle Of Wight
15 July — 17 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 15, St. Johns Rd, Newport
Responsibility: Southern Water
EToN status: Advanced planning

Park Road, Shanklin, Isle Of Wight
14 July — 21 July Traffic control (give & take)
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off – So45047 at Os 11
Responsibility: SGN
EToN status: Advanced planning

Sylvan Avenue, East Cowes, Isle Of Wight
15 July — 17 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) East Cowes at East Cowes: From Birch Close To New Barn Road (Ml 140288): Sylvan Avenue-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Woodside Avenue, Newchurch, Isle Of Wight
15 July — 17 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon) Newchurch at Newchurch: First R/H Spur Off Webster Way (Ml 440445a): Woodside Avenue-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning