B3401 Shide Road, Newport, Isle Of Wight
25 June — 25 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3 Strengthen 25mm Ul-M And 85mm Foambase-Rural:H3 (Kerbed=Inlay/Unkerbed=Overlay) Rural:H3) Newport at Newport: From St Johns Road To Queens Road (Ml 230104): Shide Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Beacon Alley, Godshill, Isle Of Wight
25 June — 29 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3 Godshill at Godshill: From Appleford Road 644m North East (Ml 530114): Beacon Alley-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
24 June — 11 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:R/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Rural:H2) Ryde at Ryde: From 440m Northeast Of Ashey Road A Further 510m Northeast (Ml320232): Smallbrook Lane-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
24 June — 11 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Ryde at Ryde: From Great Preston Road 364m West (Ml 320233): Smallbrook Lane-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Tulse Hill, Ventnor, Isle Of Wight
25 June — 25 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ventnor at Ventnor: From Grove Road To Marlborough Road (Ml 540175a): Tulse Hill-Ventnor
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at O/S The Lodge On , Blackwater Road
Responsibility: BT
EToN status: Advanced planning

A3020 High Street, Godshill, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at Opp The Griffin, High Street
Responsibility: BT
EToN status: Advanced planning

A3021 Well Road, East Cowes, Isle Of Wight
24 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
– Core Sample Reinstatement at 2
Responsibility: Southern Water
EToN status: Advanced planning

A3054 Binstead Hill, Binstead, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
Ryde (Pcp 21) Remedial Works To Rectify Ha Defect, All Works In Carriageway at S/O Glenfield Binstead Hill From C/W 3 To The Kerb
Responsibility: BT
EToN status: Advanced planning

A3054 Yarmouth Road, Calbourne, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway. at 250m East From Entrance To Three Gates Farm, Yarmouth Road
Responsibility: BT
EToN status: Advanced planning

A3055 Brading Road, Ryde, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays possible due to Streetworks
Locateate Water Service Pipe at Awi Ltd, Cothy Way,Ryde,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
24 June — 25 June Traffic control (Stop/Go boards)
Delays possible due to Streetworks
The Works Will Consist Of Reading Of The Inclinometers, The Readings Will Be Done By Maddy, The Works Will Require The Assisstance To Ift The Covers And To Do The Tm Which Will Consist Of Stop And Go Boards, Two Days Are Allocated For The Works To Be Completed However Thre Days Should Be Allowed Incase Of Bad Weather. Freshwater at Freshwater: : Military Road—Military Road-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Sandown Road, Lake, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway at Os 19 , Sandown Road
Responsibility: BT
EToN status: Advanced planning

Weston Lane, Totland, Isle Of Wight
25 June — 03 July Traffic control (two-way signals)
Delays possible due to Streetworks
Lay New Service From Farside Carriageway To Site at Os Merrivale
Responsibility: SGN
EToN status: Advanced planning

B3323 Main Road, Shorwell, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Reinstatement Of Core Failure. at Northcote
Responsibility: Southern Water
EToN status: Advanced planning

B3325 High Street, Cowes, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays unlikely due to Streetworks
Cowes (Pcp 34) Remedial Works To Rectify Ha Defect In Footway at O/S 125 To Opp 120 High Street, Junc The Cut, Cowes, Isle Of Wight, Po31
Responsibility: BT
EToN status: Advanced planning

Bath Road, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 5 Lanterns (N? 1 Column & 3 Wb’S) 1 Parking Restriction Sign Cowes at Cowes: From High Street, North To The Parade (Ml 140012):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherley Road, Shanklin, Isle Of Wight
25 June — 01 July Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Sca Group) at O/S 53a/B
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Cadets Walk, East Cowes, Isle Of Wight
25 June — 29 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) East Cowes at East Cowes: Link Footway From Beatrice Avenue To Cadets Walk (Ml F10241): Cadets Walk-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Church Road, Wootton, Isle Of Wight
24 June — 26 June No carriageway incursion
Delays unlikely due to Streetworks
Recover 1 Existing Pole at O/S 85 Church Road, Church Road
Responsibility: BT
EToN status: Advanced planning

Cranstoun Close, Totland, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install Logging Point In Footway. at 1 Cranstoun Close, Totland, Iow.
Responsibility: Southern Water
EToN status: Advanced planning

Dodnor Lane, Newport, Isle Of Wight
25 June — 25 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install Logging Point In Footway at 48 Dodnor Lane Newport Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Esplanade, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 5 Lanterns (N? 5 Columns) 1 Bus/Tram/Cycles Facilities Sign & 1 Warning Sign Cowes at Cowes: From The Parade, West To Column 3 (Ml 130120):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Oakfield Road, East Cowes, Isle Of Wight
25 June — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Nearside Carriageway To Site at Os 32
Responsibility: SGN
EToN status: Advanced planning

Old Seaview Lane, Seaview, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Seaview at Seaview: From Steyne Road To Somerset Road (Ml 330386): Old Seaview Lane-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Palmers Road, Wootton, Isle Of Wight
24 June — 26 June No carriageway incursion
Delays unlikely due to Streetworks
Recover 1 Existing Pole at O/S 92 Palmers Rd, Palmers Road
Responsibility: BT
EToN status: Advanced planning

Queens Road, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 23 Lanterns (N? 1 Column) 2 Route/Direction Signs, 12 Parking Restriction Signs & 4 Warning Signs Cowes at Cowes: From Castle Hill, West To Princess Esplanade (Ml 130118, Ml 130119 & Ml 130120):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

School Lane, Newport, Isle Of Wight
25 June — 08 July Some carriageway incursion
Delays unlikely due to Streetworks
To Excavate In Footway And Carriageway For New Electric Service. Backfill And Reinstate. at O/S Medina Training Centre
Responsibility: Southern Electric
EToN status: Advanced planning

St Marys Road, Cowes, Isle Of Wight
24 June — 30 June Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at O/S 10
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Station Road, Brading, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays unlikely due to Streetworks
Sandown (Pcp 16) Remedial Works To Rectify Ha Defect In Footway at Junc New Road On Station Road, Brading
Responsibility: BT
EToN status: Advanced planning

Sun Hill, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 5 Lanterns (No 4 Columns) 1 Warning Sign, 2 No Waiting Signs Cowes at Cowes: From High Street, West To Union Road (Ml 140144): :; Sl Cip Scheme Sl Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

The Mall, Binstead, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Frw: Bit Partrecon) Binstead at Binstead: Small Layby Section Southern End (Ml 340625a): The Mall-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Town Quay, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 3 Lanterns (N? 2 Columns) 2 No Waiting/Loading Signs, 2 Route/Direction Signs, 1 Parking Restrictions Sign & 3 Warning Signs Cowes at Cowes: From High Street, East To Dead End (Ml 140316):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Upper Yarborough Road, East Cowes, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays unlikely due to Streetworks
Erect Pole In Tarmac Surface Tto Provide Service To Customer at 82 Upper Yarborough Road
Responsibility: BT
EToN status: Advanced planning

Youngwoods Copse, Newchurch, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Part Recon) Newchurch at Newchurch: Full Length Of Footway From Youngwoods Way (Ml 440440): Youngwoods Copse-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning