Roadworks and road closures: 25th June 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3055 Bonchurch Road, Shanklin, Isle Of Wight
26 June — 26 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin at Shanklin: From Access Road To Luccombe Chine House 500m North (Ml420025): Bonchurch Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Bonchurch Road, Shanklin, Isle Of Wight
26 June — 26 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin at Shanklin: From 500m North Of Access Road To Luccombe Chine House To Cowleaze Hill (Ml420026): Bonchurch Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Brading Road, Ryde, Isle Of Wight
26 June — 26 June Traffic control (Stop/Go boards)
Delays likely due to Streetworks
28 Day Perm Supply/ Install New Ads Sign, Stop/Go Ryde at Ryde: Just Before The Tesco Roundabout, Heading North.: Brading Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Cowleaze Hill, Shanklin, Isle Of Wight
26 June — 26 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:H2, Resurface 25mm Ul-M 65psv Plus Regualting (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin at Shanklin: From Bonchurch Road 420m Northwest (Ml 420027): Cowleaze Hill-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 High Street, Brading, Isle Of Wight
26 June — 30 June Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Install N? 16 Lanterns (N? 6 Columns) 1 Bus Stop, 3 Warning Signs, 2 Lit Warning Signs & 1 Let Vehicle Activated Sign Brading at Brading: From Junction Of Coach Lane, South To Junction Of The Mall (Ml 310038, Ml 310039 & Ml 340639):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Rowborough Lane, Brading, Isle Of Wight
26 June — 30 June Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Install N? 2 Lanterns (N? 2 Columns) 1 Warning Sign Brading at Brading: From Junction Of Coach Lane, North To Second Column (Ml 310042):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3401 Shide Road, Newport, Isle Of Wight
25 June — 25 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3 Strengthen 25mm Ul-M And 85mm Foambase-Rural:H3 (Kerbed=Inlay/Unkerbed=Overlay) Rural:H3) Newport at Newport: From St Johns Road To Queens Road (Ml 230104): Shide Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Beacon Alley, Godshill, Isle Of Wight
25 June — 29 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3 Godshill at Godshill: From Appleford Road 644m North East (Ml 530114): Beacon Alley-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Marlborough Road, Ventnor, Isle Of Wight
26 June — 26 August Road closure
Delays likely due to Streetworks
Car Park Reconstruction, Plning And Resurfacing. (Cp-Stren:U/H4, Car Park-Strengthening Inlay-60mm Foambase, 25mm Ac6 Surface) Ventno at Ventnor: The Grove Car Park (Cp070): Marlborough Road-Ventnor:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Old Blackgang Road, Niton, Isle Of Wight
26 June — 12 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Niton at Niton: From Sandrock Road 340m West (Ml 540167): Old Blackgang Road-Niton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Old Blackgang Road, Niton, Isle Of Wight
26 June — 12 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Niton at Niton: From 340m West Of Sandrock Road To The End Of The Adopted Highway (Ml540168): Old Blackgang Road-Niton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Tulse Hill, Ventnor, Isle Of Wight
25 June — 25 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ventnor at Ventnor: From Grove Road To Marlborough Road (Ml 540175a): Tulse Hill-Ventnor
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at O/S The Lodge On , Blackwater Road
Responsibility: BT
EToN status: Advanced planning

A3020 High Street, Godshill, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at Opp The Griffin, High Street
Responsibility: BT
EToN status: Advanced planning

A3054 Binstead Hill, Binstead, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
Ryde (Pcp 21) Remedial Works To Rectify Ha Defect, All Works In Carriageway at S/O Glenfield Binstead Hill From C/W 3 To The Kerb
Responsibility: BT
EToN status: Advanced planning

A3054 Yarmouth Road, Calbourne, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway. at 250m East From Entrance To Three Gates Farm, Yarmouth Road
Responsibility: BT
EToN status: Advanced planning

A3055 Brading Road, Ryde, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays possible due to Streetworks
Locateate Water Service Pipe at Awi Ltd, Cothy Way,Ryde,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Sandown Road, Lake, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway at Os 19 , Sandown Road
Responsibility: BT
EToN status: Advanced planning

Landguard Manor Road, Shanklin, Isle Of Wight
26 June — 01 July Traffic control (multi-way signals)
Delays possible due to Streetworks
Install 125m Of 1 Way Poly Duct In Footway at Jnc Green Lane, O/S Roxan Villa, Landguard Manor Road
Responsibility: BT
EToN status: Advanced planning

Weston Lane, Totland, Isle Of Wight
25 June — 03 July Traffic control (two-way signals)
Delays possible due to Streetworks
Lay New Service From Farside Carriageway To Site at Os Merrivale
Responsibility: SGN
EToN status: Advanced planning

B3323 Main Road, Shorwell, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Reinstatement Of Core Failure. at Northcote
Responsibility: Southern Water
EToN status: Advanced planning

B3325 High Street, Cowes, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays unlikely due to Streetworks
Cowes (Pcp 34) Remedial Works To Rectify Ha Defect In Footway at O/S 125 To Opp 120 High Street, Junc The Cut, Cowes, Isle Of Wight, Po31
Responsibility: BT
EToN status: Advanced planning

Atherley Road, Shanklin, Isle Of Wight
25 June — 01 July Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Sca Group) at O/S 53a/B
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Ashey Road, Ryde, Isle Of Wight
26 June — 09 July No carriageway incursion
Delays unlikely due to Streetworks
Excavate In Footway For New Electric Service at O/S 13
Responsibility: Southern Electric
EToN status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
26 June — 30 June Some carriageway incursion
Delays unlikely due to Streetworks
Install 4m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Verge,Install 8m Of 1 Way Poly Duct In Carriageway. at O/S 49, Across C/W, To Cnr Of 50, Worsley Road
Responsibility: BT
EToN status: Advanced planning

Cadets Walk, East Cowes, Isle Of Wight
25 June — 29 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) East Cowes at East Cowes: Link Footway From Beatrice Avenue To Cadets Walk (Ml F10241): Cadets Walk-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Cranstoun Close, Totland, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install Logging Point In Footway. at 1 Cranstoun Close, Totland, Iow.
Responsibility: Southern Water
EToN status: Advanced planning

Crescent Road, Shanklin, Isle Of Wight
26 June — 30 June No carriageway incursion
Delays unlikely due to Streetworks
Excavate 1 Location (S) To Expose/ Repair Existing Ducts In Footway,Install 1m Of 1 Way Poly Duct In Footway. at O/S Samantha Court, Crescent Road.
Responsibility: BT
EToN status: Advanced planning

Dodnor Lane, Newport, Isle Of Wight
25 June — 25 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install Logging Point In Footway at 48 Dodnor Lane Newport Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Oakfield Road, East Cowes, Isle Of Wight
25 June — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Nearside Carriageway To Site at Os 32
Responsibility: SGN
EToN status: Advanced planning

School Lane, Newport, Isle Of Wight
25 June — 08 July Some carriageway incursion
Delays unlikely due to Streetworks
To Excavate In Footway And Carriageway For New Electric Service. Backfill And Reinstate. at O/S Medina Training Centre
Responsibility: Southern Electric
EToN status: Advanced planning

Seagrove Manor Road, Seaview, Isle Of Wight
26 June — 30 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Fullrecon Fwr: Bit Partrecon) Seaview at Seaview: From Old Seaview Lane To Seagrove Farm Road Ml340611): Seagrove Manor Road-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Southdown, Chale, Isle Of Wight
26 June — 30 June Some carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole 0.5m X 0.5m. No Tm Practical Due To Width Of Road. We Will Need A 15 Minute Temp Obstruction For Pole To Be Recovered. Temp Obstruction Sign To Be Placed Either End Of Road. at Opp Southdown Cottage, Southdown. Chale
Responsibility: BT
EToN status: Advanced planning

Spring Gardens, Shanklin, Isle Of Wight
26 June — 30 June Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement at 13, Spring Gdns, Shanklin
Responsibility: Southern Water
EToN status: Advanced planning

Station Road, Brading, Isle Of Wight
25 June — 26 June Some carriageway incursion
Delays unlikely due to Streetworks
Sandown (Pcp 16) Remedial Works To Rectify Ha Defect In Footway at Junc New Road On Station Road, Brading
Responsibility: BT
EToN status: Advanced planning

Upper Yarborough Road, East Cowes, Isle Of Wight
25 June — 29 June Some carriageway incursion
Delays unlikely due to Streetworks
Erect Pole In Tarmac Surface Tto Provide Service To Customer at 82 Upper Yarborough Road
Responsibility: BT
EToN status: Advanced planning

Whitecross Avenue, Shanklin, Isle Of Wight
26 June — 30 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 12 Lanterns ( No 9 Columns) 1 Warning Sign, 5 Bus Stops And 1 Post Box Shankl at Shanklin: From Princes Way, North, Then East To Dead End (Ml 440237, Ml 440272, Ml 440312 And Ml 440313): :; Sl Cip Sche
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Wilkes Road, Sandown, Isle Of Wight
26 June — 30 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 3 Lanterns ( No 3 Columns) 1 Residents Parking Permit Signs And 1 Lit Warning Sign Sandow at Sandown: From High Street, North To York Road (Ml 441378): :; Sl Cip Scheme Sl Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Woodside Avenue, Newchurch, Isle Of Wight
26 June — 30 June Some carriageway incursion
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon) Newchurch at Newchurch: First R/H Spur Off Webster Way (Ml 440445a): Woodside Avenue-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning