Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3055 Morton Road, Brading, Isle Of Wight
27 May — 29 May Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway at Section 81/Cch Ref 1629466,- Renew C/W Cover O/S Southfields , Morton Road
Responsibility: BT
EToN status: Advanced planning
B3401 Shide Road, Newport, Isle Of Wight
27 May — 29 May Road closure
Delays likely due to Streetworks
Carriageway Repairs, Rebed Manhole Cover And Frame Due To Failed Carriageway Surround Tm Two Way Lights Req Newport at Newport: E/B O/S 40 Between J/O Queens Rd & College Rd: Shide Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Cowes at Cowes: From Brambles Lane To Pine Tree Close (Ml130099) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Cowes at Cowes: From Pine Tree Close To Egypt Hill (Ml130100) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:U/H3, Reconstruction 25mm Ul-M 65psv And 135mm Foambase-Urban:H3) Cowes at Cowes: From Egypt Hill To 200m East Thereof (Ml130101) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) Cowes at Cowes: From Brambles Lane To Woodvale Road (Ml130098) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H3, Resurface 25mm Ul-M 65psv Channel Plane-Urban: H3) Cowes at Cowes: From 200m East Of Egypt Hill To Ward Avenue (Ml130102) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Elenors Grove, Binstead, Isle Of Wight
27 May — 29 May Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at In C/W Os The Finches , Elenors Grove
Responsibility: BT
EToN status: Advanced planning
Appleford Road, Chale, Isle Of Wight
28 May — 01 June Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway,Replace 3 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway at 157m East, At The Jnc, 82m West, 251m West Of Jnc Appleford Lane On, Appleford Road
Responsibility: BT
EToN status: Advanced planning
A3054/B3330 High Street, Ryde, Isle Of Wight
27 May — 29 May No carriageway incursion
Delays unlikely due to Streetworks
Install 7m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at O/S 15/17, High Street
Responsibility: BT
EToN status: Advanced planning
A3054/B3330 High Street, Ryde, Isle Of Wight
28 May — 10 June Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 42098 at Os 177a
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning
A3054 Elenors Grove, Binstead, Isle Of Wight
27 May — 09 June No carriageway incursion
Delays unlikely due to Streetworks
Excavation Of Joint Bay & Cable Trench In Footway To Provide New Electrical Supply To Site Adj Elenors at From O/S Elenors To Point 50m To The West
Responsibility: Southern Electric
EToN status: Advanced planning
A3055 Albert Street, Ventnor, Isle Of Wight
27 May — 09 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 9 Lanterns (N? 8 Columns) 2 Bus Stops, 1 No Waiting Sign, 1 Route/Direction Sign & 1 Parking Restriction Sign (Ml 530058) Ventnor at Ventnor: From Victoria Street, West To Pier Street (Ml 530058):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3320 Arctic Road, Cowes, Isle Of Wight
27 May — 09 June Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay & Cable Trench In Footway To Provide New Electrical Supply To 225 Arctic Road at From O/S 222 To O/S 231 Arctic Road
Responsibility: Southern Electric
EToN status: Advanced planning
Bath Road, Ventnor, Isle Of Wight
27 May — 09 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 4 Lanterns (N? 4 Columns) Ventnor at Ventnor: From Esplanade, North To Belgrave Road (Ml 540173):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Queens Road, Freshwater, Isle Of Wight
28 May — 01 June No carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at 10m South Of Jnc Lime Tree Court On, Queens Road
Responsibility: BT
EToN status: Advanced planning
Egypt Esplanade, Cowes, Isle Of Wight
27 May — 29 May No carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct at Both Blockages F/W O/S 1 To 6 Hawkins, Egypt Esplanade
Responsibility: BT
EToN status: Advanced planning
Leed Street, Sandown, Isle Of Wight
27 May — 29 May No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Driveway at Os Telephone Exchange, Leed Street
Responsibility: BT
EToN status: Advanced planning