Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3056 Hale Common, Arreton, Isle Of Wight
28 July — 31 July Traffic control (two-way signals)
Delays likely due to Streetworks
Kerb Works/Driveway Post Carriageway Works Arreton at Arreton: Ml 410065:
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3399 Kingston Road, Shorwell, Isle Of Wight
28 July — 28 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3) Shorwe at Shorwell: From Emmett Hill 490m North (Ml630140): Kingston Road-Shorwell:; Cw Cip Scheme Cw Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3399 Kingston Road, Shorwell, Isle Of Wight
28 July — 28 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3) Shorwell at Shorwell: From Entrance To Bucks Farm 500m South East (Ml 630138): Kingston Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3399 Kingston Road, Shorwell, Isle Of Wight
28 July — 28 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3) Shorwell at Shorwell: From 500m South Of Bucks Farm A Further 350m (Ml630139): Kingston Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Cockleton Lane, Gurnard, Isle Of Wight
28 July — 28 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Gurnar at Gurnard: From Hilton Road To Bay View Road (Ml130071) : Cockleton Lane-Gurnard:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Long Lane, Newport, Isle Of Wight
29 July — 29 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H2, Resurface 25mm Ul-M 65pssv Chanel Plane_Urban:H2) Newport at Newport: From Staplers Road To Southern Junction Of Buckberry Lane (Ml 420107): Long Lane-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Long Lane, Newport, Isle Of Wight
29 July — 29 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Newport at Newport: From Southern Junction Of Buckberry Lane 700m Southeast (Ml 420108): Long Lane-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Long Lane, Newport, Isle Of Wight
29 July — 29 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H2) Newport at Newport: From 1250m Southeast Of Southern Junction Of Buckberry Lane To Briddlesford Road (Ml 420110): Long Lane-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Long Lane, Newport, Isle Of Wight
29 July — 29 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Sul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H2) Newport at Newport: From 700m Southeast Of Southern Junction Of Buckberry Lane A Further 550m Southeast (Ml 420109): Long Lane-Newp
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Church Road, Havenstreet, Isle Of Wight
29 July — 29 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:R/H4, Strengthen 30mm Fibrovia And 130mm Foambase-Rural:H4) Havens at Havenstreet: From Havenstreet Main Road To Pondcast Lane (Ml340347) : Church Road-Havenstreet:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3395 Embankment Road, Bembridge, Isle Of Wight
28 July — 28 July Traffic control (two-way signals)
Delays possible due to Streetworks
Access Required To Underground Bt Structure To Restore Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant. at Jf10 Opposite Bembridge Through To The Jf10 O/S Houseboat Bluemax In Embankment Road Bembridge Isle Of Wight Po33 1xq
Responsibility: BT
EToN status: Advanced planning
B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
29 July — 04 August Traffic control (two-way signals)
Delays possible due to Streetworks
Break Out The Existing Gully Concrete Surround And Excavate The Existing Grass Verge, Then Install A Splayed Side Entry Gully With Splayed Precast Concrete Kerbs. Tm 2 Way Lights Shalfleet at Shalfleet: : Freshwater Road-Shalfleet – 12112
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Long Lane, Newport, Isle Of Wight
28 July — 30 July Traffic control (two-way signals)
Delays possible due to Streetworks
Excavate/ Investigate Possible Collapsed Gully Pipework, Location Marked On Site (Gl: Drainage Structure Leakage) Newport at Newport: By The Speed Camera Signs Between John Pecks And Buckbury Heights: Long Lane-Newport – 10370
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3341 Castle Road, Newport, Isle Of Wight
28 July — 02 August Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Westridge Skip Hire) at O/S 28
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3395 Steyne Road, Bembridge, Isle Of Wight
29 July — 06 August Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Nearside Carriageway To Site at Os 25 Cherry Trees
Responsibility: SGN
EToN status: Advanced planning
Winford Road, Newchurch, Isle Of Wight
29 July — 04 August No carriageway incursion
Delays unlikely due to Streetworks
313174 Shanklin 19 – Street Cabinet. Excavate To Lay Approx 3m Bt Ducts, Lay Concrete Plinth, Stand Cab. Reinstate, Check And Clear Site. at Opp Aspley House, Winford Road, Newchurch Po36 0lz
Responsibility: BT
EToN status: Advanced planning
Newnham Road, Binstead, Isle Of Wight
28 July — 04 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Binstead at Binstead: From Newnham Lane 200m North (Ml 330203): Newnham Road-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Egypt Esplanade, Cowes, Isle Of Wight
29 July — 30 July No carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at Os 1 To 6 Hawkins Egypt Esplanade
Responsibility: BT
EToN status: Advanced planning
Esplanade, Shanklin, Isle Of Wight
28 July — 05 August Traffic control (give & take)
Delays unlikely due to Streetworks
Disconnect Services In Carriageway at Os 27 29 & 30
Responsibility: SGN
EToN status: Advanced planning
Fairway Path, Sandown, Isle Of Wight
29 July — 31 July No carriageway incursion
Delays unlikely due to Streetworks
Install 1m Of 1 Way Poly Duct In Footway at O/S Sandown Bay Academy, Fairway Path
Responsibility: BT
EToN status: Advanced planning
Gully Road, Nettlestone, Isle Of Wight
29 July — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Farside Verge To Site at Plot Adj To Bramblecross
Responsibility: SGN
EToN status: Advanced planning
Lind Hill, Ryde, Isle Of Wight
29 July — 05 August Some carriageway incursion
Delays unlikely due to Streetworks
Fulcrum To Lay New Gas Main 9m In Footway And 3m In Carriageway Then A New Gas Service 14m Across The Carriageway at Connecting Outside No.5 Moving To The Top Of The Hill And Accross The Carriageway From That Point.
Responsibility: Fulcrum Pipelines Limited
EToN status: Advanced planning
Wilkes Road, Sandown, Isle Of Wight
28 July — 04 August Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Upright Scaffold) at O/S 10
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning