Road Closed

Roadworks and road closures: 9th June

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3055 Bonchurch Road, Shanklin, Isle Of Wight
10 June — 12 June Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – Patches Of Delamination Near The Centre Line Appx 1.4 X .50 X 40mm 4 X Appx Between .60 And .90 X .30/40 X 35/40mm Tm – Two Way Temp Lights On Nat Speed Limit Road (Cw: Pothole) Shanklin at Shanklin: On Either Side Of The Turning Down To Luccombe Farm Cottages On And Either Side Of The Centreline: Bonchurch R
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 High Street, Brading, Isle Of Wight
09 June — 10 June Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Remedial To Rectify Ha Defect at Opp 13 On, High Street
Responsibility: BT
EToN status: Advanced planning

Godshill Road, Whitwell, Isle Of Wight
09 June — 10 June Road closure
Delays likely due to Streetworks
Access Required To Overhead Bt Structure To Provide Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant at Godshill Road From Southford Lane To Sheepwash Lane Whitwell Isle Of Wight Po38 2ag
Responsibility: BT
EToN status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
09 June — 11 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Ryde at Ryde: From Great Preston Road 364m West (Ml 320233): Smallbrook Lane-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
09 June — 11 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:R/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Rural:H2) Ryde at Ryde: From 440m Northeast Of Ashey Road A Further 510m Northeast (Ml320232): Smallbrook Lane-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 High Street, Wootton, Isle Of Wight
09 June — 09 June Some carriageway incursion
Delays possible due to Streetworks
Remedial Notice Request To Rectify Ha Defect In Cw To Replace Lines In Cw at Opp 156, High Street
Responsibility: BT
EToN status: Advanced planning

A3055 Rowborough Lane, Brading, Isle Of Wight
10 June — 11 June Some carriageway incursion
Delays possible due to Streetworks
Minor Remedial To Rectify Ha Defect In Carriageway at Section 81/Cch Ref 1613373 In C/W O/S Rowborough Farm Cottage On , Rowborough Lane
Responsibility: BT
EToN status: Advanced planning

B3399 Chale Street, Chale, Isle Of Wight
10 June — 10 June Traffic control (two-way signals)
Delays possible due to Streetworks
Access To Repalce Damaged Pole. Currently Safe But Requires To Be Replaced. 2 Way Lights Off Peak And Manually Controlled All Times at Chale Street Opp Amberley And Wayside Calbourne Po38 2hg
Responsibility: BT
EToN status: Advanced planning

Chatfeild Road, Niton, Isle Of Wight
10 June — 12 June Traffic control (two-way signals)
Delays possible due to Streetworks
Idr – Infill 2 X Pieces Of Delamination 1.0 X .50 X 35mm 7.0 X 2.0 X 35mm Patch Req’D Spreads Over The Whole Width Of The W/B Side Of The C/Way Tm – Two Way Temp Lights (Cw: Pothole) Niton at Niton: On The W/B C/Way Appx 50 To 100m Past The National Speed Limit Sign On Leaving Whitwell: Chatfeild Road-Niton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Rectory Road, Niton, Isle Of Wight
10 June — 12 June Traffic control (two-way signals)
Delays possible due to Streetworks
Repairs Required To Floating Footway. Includes And One Drainage Outlet Pipe. (Kerb: Knocked Out/Replace/Miss) Niton at Niton: Os Nutkins: Rectory Road-Niton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Victoria Road, Cowes, Isle Of Wight
09 June — 18 June Traffic control (multi-way signals)
Delays possible due to Streetworks
Lay New Service From Farside Carriageway To Site at Adj 70 Park Road
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

Fairmount Drive, Newport, Isle Of Wight
09 June — 22 June Traffic control (two-way signals)
Delays possible due to Streetworks
Remove From Risk 10m Of 4″ Si Main. Replace With 10m Of 90mm Pe Main. at Jnc Of Bellecroft Drive And Fairmount Drive Carriageway / Footway & Verge
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

Mayfield Drive, Newport, Isle Of Wight
09 June — 22 June Traffic control (two-way signals)
Delays possible due to Streetworks
Remove From Risk 15m Of 4″ Si Main. Replace With 15m Of 90mm Pe Main. Relay And Transfer Services at From Junction Bellcroft Drive To O/S 44 Mayfield Drive Carriageway / Footway & Verge
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

A3054/B3330 High Street, Ryde, Isle Of Wight
10 June — 12 June No carriageway incursion
Delays unlikely due to Streetworks
Install 7m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at O/S 15/17, High Street
Responsibility: BT
EToN status: Advanced planning

A3054 Lind Street, Ryde, Isle Of Wight
10 June — 23 June Some carriageway incursion
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway And Road Crossing To Provide New Electrical Supply To New Hotel In Lind Hill. Backfill And Reinstate. at From O/S St James Church To Jct St Thomas Street
Responsibility: Southern Electric
EToN status: Advanced planning

A3055 High Street, Freshwater, Isle Of Wight
10 June — 17 June Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 42102 at Os Hollywood
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
09 June — 10 June No carriageway incursion
Delays unlikely due to Streetworks
Remedial To Rectify Ha Defect at Sd7acl69, Soft 55 Mtrs From The Entrance To Compton Grange, Military Road
Responsibility: BT
EToN status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
09 June — 10 June No carriageway incursion
Delays unlikely due to Streetworks
Remedial To Rectify Ha Defect at Sd6yxc48, In Soft On Corner Junction With Drive To Compton Grange, Military Road
Responsibility: BT
EToN status: Advanced planning

A3056 Arreton Street, Arreton, Isle Of Wight
09 June — 11 June Some carriageway incursion
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Arreton at Arreton: From Hazely Coombe To Heasley Lane (Ml 410062): Arreton Street-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3329 Albert Road, Sandown, Isle Of Wight
09 June — 22 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 2 Lanterns (N? 2 Columns) 2 Route/Direction Signs & 1 Lit Warning Sign Sandown at Sandown: From High Street, North East To Junction Of Station Avenue (Ml 430147 & Ml 430148):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
10 June — 12 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at Fat Harrys 53, High St, Sandown
Responsibility: Southern Water
EToN status: Advanced planning

Bellevue Road, Cowes, Isle Of Wight
09 June — 22 June No carriageway incursion
Delays unlikely due to Streetworks
Excavate In Footway For New Electric Service. Backfill And Reinstate. at Adj 93
Responsibility: Southern Electric
EToN status: Advanced planning

Bembridge Footpath 32, Bembridge, Isle Of Wight
10 June — 11 June No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice To Rectify Ha Defect In Fw. at (Pcp6) 464282,088670 Junction Embankment Road On, Bembridge Footpath 32
Responsibility: BT
EToN status: Advanced planning

Brookfield Gardens, Ryde, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Bit Slurrypatch Fwr: Bit Partrecon) Ryde at Ryde: First R/H Section Of Brookfield Gardens (Ml 340487b): Brookfield Gardens-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Main Road, Alverstone, Isle Of Wight
10 June — 11 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Work On Ha Defect. at (Pcp6) 457770,85557457764,85565 Opposite Station House Across Carriageway To Outside Station House
Responsibility: BT
EToN status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install 4m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Verge,Install 8m Of 1 Way Poly Duct In Carriageway at O/S 49, Across C/W, To Cnr Of 50, Worsley Road
Responsibility: BT
EToN status: Advanced planning

Cherrytree Road, Nettlestone, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Nettlestone at Nettlestone: From Orchard Road To Caws Avenue (Ml 342456): Cherrytree Road-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Clarendon Close, Brading, Isle Of Wight
09 June — 22 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 1 Lantern (N? 1 Column) 1 Warning Sign Brading at Brading: From Morton Road, East To Dead End (Ml 310034):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Cliff Path, Lake, Isle Of Wight
10 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 13 Lanterns (N? 13 Columns) 1 Neighbourhood Watch Sign, 1 No Ball Games Sign, 1 Route/Direction Sign & 2 Warning Signs Lake at Lake: From Cliff Road, South To End Column (Ml 440196 & Ml 440218):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Cliff Road, Lake, Isle Of Wight
10 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 1 Lantern (N? 1 Column) Lake at Lake: On Path Leading To The Beach (Ml 440196):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Crescent Road, Shanklin, Isle Of Wight
09 June — 10 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial To Rectify Ha Defect at F/W O/S Samantha Court , Crescent Road
Responsibility: BT
EToN status: Advanced planning

Devonia Gardens, Brading, Isle Of Wight
09 June — 22 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 3 Lanterns (N? 3 Columns) Brading at Brading: From Morton Road, East To Dead End (Ml 341335):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Esplanade Road, Sandown, Isle Of Wight
09 June — 22 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 1 Lantern (N? 1 Column) 1 No Waiting Sign Sandown at Sandown: From High Street, South To Single Column (Ml 420094):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Firestone Copse Road, Wootton, Isle Of Wight
10 June — 10 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice To Rectifiy Ha Defect In Cw at Opp Jcn Havenstreet Main Rd On, Firestone Copse Road
Responsibility: BT
EToN status: Advanced planning

Greenway Close, Binstead, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Binstead at Binstead: Whole Length Of Road From Greenway (Ml 361534): Greenway Close-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Greenway, Binstead, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Binstead at Binstead: From The Mall To Verwood Drive (Ml 340534): Greenway-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Hadrians Way, Brading, Isle Of Wight
09 June — 22 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 2 Lanterns (N? 2 Columns) 1 Neighbourhood Watch Sign & 1 Warning Sign Brading at Brading: From Morton Old Road, South To Dead End (Ml 341333):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Hammond Close, Yarmouth, Isle Of Wight
09 June — 11 June Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatment at Longwood Hammond Cl
Responsibility: Southern Water
EToN status: Advanced planning

Lind Hill, Ryde, Isle Of Wight
10 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Cable Trench In Footway To Provide New Electrical Supply To New Hotel In Lind Hill. Backfill And Reinstate. at From Jct Lind Street To End Of Lind Hill
Responsibility: Southern Electric
EToN status: Advanced planning

Lower Green Road, St Helens, Isle Of Wight
10 June — 11 June Some carriageway incursion
Delays unlikely due to Streetworks
Minor Remedial To Rectify Ha Defect. at (Pcp7) 462895,089009 Opposite Weymouth Cottage , Lower Green Road
Responsibility: BT
EToN status: Advanced planning

Luccombe Road, Shanklin, Isle Of Wight
10 June — 11 June No carriageway incursion
Delays unlikely due to Streetworks
Minor Remedial To Rectify Ha Defect In Soft at 170m South From The Priory, Luccombe Road
Responsibility: BT
EToN status: Advanced planning

Meadow Drive, Bembridge, Isle Of Wight
09 June — 10 June No carriageway incursion
Delays unlikely due to Streetworks
Remedial Bduk Works In Verge To Rectify Ha Defect at Opposite Wentworth , Meadow Drive
Responsibility: BT
EToN status: Advanced planning

Morton Old Road, Brading, Isle Of Wight
09 June — 22 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 6 Lanterns (N? 2 Pb’S) 2 Warning Signs & 1 Lit Warning Sign Brading at Brading: From Hornsey Rise, South To Morton Road (Ml 340332):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

New Road, Lake, Isle Of Wight
10 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 2 Lanterns (N? 2 Columns) 1 Warning Sign Lake at Lake: From New Road, South Into Carpark (Ml 440414):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Orchard Road, Nettlestone, Isle Of Wight
09 June — 11 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Nettlestone at Nettlestone: Layby Section 50m From East Green (Ml 340455a): Orchard Road-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Palmerston Road, Shanklin, Isle Of Wight
09 June — 10 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial To Rectify Ha Defect at Jnc Alexandra Road On, Palmerston Road
Responsibility: BT
EToN status: Advanced planning

Westfield Park, Ryde, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwr: Bit Partrecon) Ryde at Ryde: Bottom R/H Section Of Westfield Park (Ml 360632a): Westfield Park-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Image: Zahlm under CC BY 2.0