Road Closed Sign

Roadworks and road closures: 17th September 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Coppins Bridge, Newport, Isle Of Wight
17 September — 19 September
Delays likely Lane closure
Works location: Jnc High Street On, Coppins Bridge
Works description: Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

A3054 Snooks Hill, Newport, Isle Of Wight
17 September — 19 September
Delays likely Lane closure
Works location: Opp Jnc Barton Road On, Snooks Hill
Works description: Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

B3322 The Broadway, Totland, Isle Of Wight
18 September — 18 October
Delays likely Road closure
Works location: Totland: From Hurst Point View To Granville Rise (Ml630094): The Broadway-Totland:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Totlan
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
18 September — 02 October
Delays likely Traffic control (two-way signals)
Works location: Newport: From Junction Of West Street, South West To Junction Of Cedar Hill (Ml 210072, Ml 210073, Ml 210074, Ml 210075)
Works description: Install No 28 Lanterns (No 28 Columns) 2 Bus Stops, 1 Bus/Tram/Cycle Facilities Sign, 1 Cctv Sign, 5 Route/Direction Signs, 11 Warning Signs, 2 Traffic Light Signs And 1 Lit Speed Activated Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Palmerston Road, Shanklin, Isle Of Wight
17 September — 17 October
Delays likely Road closure
Works location: Shanklin: From Queens Road To Eastcliff Promenade (Ml 441279): Palmerston Road-Shanklin:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ward Road, Totland, Isle Of Wight
17 September — 17 October
Delays likely Road closure
Works location: Totland: From The Broadway To Granville Drive (Ml640569): Ward Road-Totland:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing.(Ff-Stren100:U/H4,F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Totlan
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

West Street, Seaview, Isle Of Wight
18 September — 18 October
Delays likely Road closure
Works location: Seaview: From Rope Walk To High Street (Ml341506): West Street-Seaview:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:U/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H4) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Wilkes Road, Sandown, Isle Of Wight
17 September — 17 October
Delays likely Road closure
Works location: Sandown: From High Street To York Road (Ml441378): Wilkes Road-Sandown:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Sandow
Responsibility for works: Island Roads on behalf of the Island Roads

Image: Nateone under CC BY 2.0