Road closed

Roadworks and road closures: 1st July 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow.

A3054 High Street, Wootton, Isle Of Wight
02 July — 02 July
Delays likely Traffic control (two-way signals)
Works location: Wootton: O/S No.98: High Street-Wootton:; Scheduler Ops Hub
Works description: Idr – Fh Cover Reinstatement Is Starting To Crack Up And Sink Needs Reinstating By Whoever Is Responsible For These Covers 1.10 X .90 X 100/150mm Tm – Two Way Temp Lights Or Stop And Go Boards (Cw: Pothole) Wootto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
02 July — 10 July
Delays likely Traffic control (two-way signals)
Works location: Os 95
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

B3327 Clarence Road, Wroxall, Isle Of Wight
01 July — 31 July
Delays likely Road closure
Works location: Wroxall: From West Street To Willow Bank (Ml 520074): Clarence Road-Wroxall:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon225:R/H2, Reconstruction 25mm Ul-M 65psv, 75mm Hdm Binder, 125mm Foambase-Rural:H2 Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3327 Mitchell Avenue, Ventnor, Isle Of Wight
02 July — 21 July
Delays likely Road closure
Works location: Ventnor: From Springhill To Macrocarpa Road (Ml 520066): Mitchell Avenue-Ventnor:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon225:U/H2, Reconstruction 25mm Ul-M 65psv, 75mm Hdm Binder, 125mm Foambase-Urban:H2 Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Northcliff Gardens, Shanklin, Isle Of Wight
02 July — 31 July
Delays likely Road closure
Works location: Shanklin: From St Martins Avenue To St Boniface Cliff Gardens (Ml441298): Northcliff Gardens-Shanklin:; Cw Cip Scheme Cw
Works description: Carriageway Reconstruction, Planing And Resurfacing.(Ff-Fibrovia:U/H4,Resurface 30mm Fibrovia Plus Regulating/Patching(Kerbed=Inlay/Unkerbed=Overlay)-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Steephill Road, Shanklin, Isle Of Wight
01 July — 31 July
Delays likely Road closure
Works location: Shanklin: From High Street For Its Entire Length (Ml440304): Steephill Road-Shanklin:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Whitesmith Road, Newport, Isle Of Wight
02 July — 03 July
Delays likely Road closure
Works location: Newport: Middle Of Carriageway, Junction Of Forest Road: Whitesmith Road-Newport:; Scheduler Ops Hub
Works description: Carriageway Repair Works (X2 Potholes Present, However A 1.5m2 Area To Be Patched 0.5mx0.4mx55mm 0.4mx0.3mx35mm Tm Road Closure Required (Cw: Pothole) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Gills Cliff Road, Ventnor, Isle Of Wight
01 July — 01 July
Delays possible Traffic control (two-way signals)
Works location: Ventnor: Not Name Plate. C/W Defect. Near The Jct With Whitwell Road,Opp No 62.: Gills Cliff Road-Ventnor:; Scheduler Op
Works description: 2 Areas Of C/W Have Sunk At A Previous Patch Creating A Sharp Edge . First Area Measures 2 Metres In Length. The Other Is 3 Metres Long. Have Marked Up. Will Require Bevelling Material To Width Of 100 Mm As Before. Tm On A Bend On A Hill.Stop Go. (Cw: Pothole) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Elm Lane, Calbourne, Isle Of Wight
02 July — 04 July
Delays possible Traffic control (two-way signals)
Works location: 35 And 47 ,155 ,195 Meters From Jcn With A3054, Elm Lane
Works description: Locate And Excavate 4 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

St Johns Road, Newport, Isle Of Wight
01 July — 03 July
Delays possible Traffic control (two-way signals)
Works location: O/S 99 St Johns Road Newport Isle Of Wight Po30 1xn
Works description: 2 Way Lights Required For Safe Access To Underground Network Cabling To Provide Customer Service. Working Hours 09.30 To 15.30
Responsibility for works: BT
Current status: Advanced planning

Image: oatsy under CC BY 2.0