Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
03 December — 05 December
Delays likely Traffic control (give & take)
Works location: Newport: From Junction Of Banner Lane, North To Horsebridge Hill. (Ml 210017, Ml 210021, Ml 210022 And Ml 210046): :; Sl
Works description: Install N? 23 Lanterns (N? 18 Columns) 7 X 40mph Signs, 5 Route/Direction Signs, 2 Resident Parking Permit Signs And 10 Warning Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
03 December — 05 December
Delays likely Traffic control (two-way signals)
Works location: 50m North Of Jnc With Medina Way On A3020 Parkhurst Rd Sections., Parkhurst Road
Works description: Test 1 Existing Ducts For Spare Capacity
Responsibility for works: BT
Current status: Advanced planning

A3020 Horsebridge Hill, Newport, Isle Of Wight
03 December — 05 December
Delays likely Traffic control (two-way signals)
Works location: On A3020 160m North Of Junction With Lonsdale Ave Sections., Horsebridge Hill
Works description: Test 1 Existing Ducts For Spare Capacity
Responsibility for works: BT
Current status: Advanced planning

A3020 St Georges Way, Newport, Isle Of Wight
03 December — 05 December
Delays likely Traffic control (give & take)
Works location: Newport: From Column 27, South To Junction Of Shide Road (Ml 210001, Ml 210002, Ml 210003 And Ml 210004): :; Sl Cip Sche
Works description: Install No 23 Lanterns (No 22 Columns) 3 X 40mph Signs, 3 Warning Signs, 1 Public Notice And 1 Lit Vehicle Activation Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Bouldnor Road, Yarmouth, Shalfleet, Isle Of Wight
02 December — 04 December
Delays likely Traffic control (give & take)
Works location: Shalfleet: From Yarmouth Common 300mtrs East (Ml 610019 ): Bouldnor Road-Shalfleet:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re-Construction And Surfacing ( Bit Part Re-Con ) Shalfl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
03 December — 05 December
Delays likely Traffic control (give & take)
Works location: Newport: From Snooks Hill, North To Medina College Junction (Ml 210047, Ml 210048, Ml 210049 And Ml 210050): :; Sl Cip S
Works description: Install No 28 Lanterns (No 25 Columns) 3 Bus Stops, 1 No Ball Games Sign, 5 No Waiting Signs, 4 Warning Signs, 1 Glass Tube Monitoring Equipment, 1 Lit Vehicle Activated Sign, 1 Large Lit Sign, 1 Public Notice And 2 Traffic Signal Heads Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 High Street, Freshwater, Isle Of Wight
02 December — 04 December
Delays possible Traffic control (two-way signals)
Works location: High St. From Junc Of Silcombe Lane To Junc Of Tennyson Rd
Works description: Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Will Be Required. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Between 09:30 And 15:30hrs. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

A3055 Leeson Road, Ventnor, Isle Of Wight
02 December — 04 December
Delays possible Traffic control (two-way signals)
Works location: Os 5 Leeson Road.
Works description: Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway.
Responsibility for works: BT
Current status: Advanced planning

A3055 Tennyson Road, Freshwater, Isle Of Wight
03 December — 05 December
Delays possible Traffic control (two-way signals)
Works location: Tennyson Rd. From Junc High St .To Telephone Exch.
Works description: Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Will Be Required. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Between 09:30 And 15:30hrs. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
03 December — 05 December
Delays possible Some carriageway incursion
Works location: 91 St James St
Works description: Carry Out Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3330 St Johns Hill, Ryde, Isle Of Wight
02 December — 04 December
Delays possible Some carriageway incursion
Works location: St John’S Hill From Junction With High Street To St John’S Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

B3330 St Johns Road, Ryde, Isle Of Wight
02 December — 04 December
Delays possible Some carriageway incursion
Works location: St John’S Road From St John’S Hill To Junction With Monkton Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

B3341 St Johns Place, Newport, Isle Of Wight
03 December — 05 December
Delays possible Traffic control (two-way signals)
Works location: From Its Junc With Shide Road To Its Junc With Medina Ave
Works description: Openreach Cable Recovery With 2 Way Rolling Traffic Lights With Correct Signing And Guarding With A View To Causing The Minimum Intrusion Or Disruption On The Road And Due Consideration Given To Safety And Welfare Of All Road Users And Pedestrians. Adhering To The Conditions Within Chapter 8 Of The Street Works Code Of Practice. Works Duration Should Take No More Than 2 Hours Per Location. All Works Off Peak And None At Roundabouts Junctions Or Crossings/Bus Stops
Responsibility for works: BT
Current status: Advanced planning

B3401 Shide Road, Newport, Isle Of Wight
03 December — 05 December
Delays possible Traffic control (two-way signals)
Works location: From Its Junc With Blackwater Road To Its Junc With St Johns Rd
Works description: Openreach Cable Recovery With 2 Way Rolling Traffic Lights With Correct Signing And Guarding With A View To Causing The Minimum Intrusion Or Disruption On The Road And Due Consideration Given To Safety And Welfare Of All Road Users And Pedestrians. Adhering To The Conditions Within Chapter 8 Of The Street Works Code Of Practice. Works Duration Should Take No More Than 2 Hours Per Location. All Works Off Peak And None At Roundabouts Junctions Or Crossings/Bus Stops
Responsibility for works: BT
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
03 December — 03 December
Delays possible Traffic control (two-way signals)
Works location: Arreton: : Duxmore Weather Station (Highway) Findlay Irvine Ice 2000—Air Temp, Road Surface Temp, Residual Salinity, W
Works description: Sub Con – Findley Irvine Weather Station Works Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054/B3330 High Street, Ryde, Isle Of Wight
02 December — 09 December
Delays unlikely Traffic control (give & take)
Works location: Os 114
Works description: Gsmr/Hse Cut Off So33296
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

A3054/B3330 High Street, Ryde, Isle Of Wight
02 December — 15 December
Delays unlikely Some carriageway incursion
Works location: O/S 75
Works description: Skip (Weaver Brothers Ltd)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Lind Street, Ryde, Isle Of Wight
02 December — 04 December
Delays unlikely Some carriageway incursion
Works location: Lind Street From Cross Street To Junction With St James Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

A3054 River Road, Yarmouth, Isle Of Wight
02 December — 15 December
Delays unlikely Traffic control (give & take)
Works location: Yarmouth: From River Road, West Into Car Park (Ml 610017): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 4 Lanterns (N? 2 Columns) 1 Warning Sign Yarmou
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Church Street, Ventnor, Isle Of Wight
02 December — 08 December
Delays unlikely Some carriageway incursion
Works location: O/S 21
Works description: Scaffold (Upright Scaffold Services)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Cross Street, Ryde, Isle Of Wight
02 December — 04 December
Delays unlikely Some carriageway incursion
Works location: Cross Street From Melville Street To Lind Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
02 December — 06 December
Delays unlikely Some carriageway incursion
Works location: O/S 40
Works description: Scaffold (B Ashton Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Steephill Road, Ventnor, Isle Of Wight
03 December — 05 December
Delays unlikely Some carriageway incursion
Works location: Ventnor: F/Way O/S The Entrance To The Botanic Gdns: Steephill Road-Ventnor:; Scheduler Ops Hub
Works description: Reinstate Footway Where Water Is Pooling Section 7m X 1.5m Needs Relaying Tm – Give And Take + F/Way Corridor In C/Way Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Newport Road, Lake, Isle Of Wight
03 December — 04 December
Delays unlikely No carriageway incursion
Works location: Clr Blk In F/W At Jnc With Lamorbey Road O/S 72, Newport Road
Works description: Rectify Ha Defect Remedial Reinstatement To Be Carried Out On Site In Footway/Soft
Responsibility for works: BT
Current status: Advanced planning

Albert Road, Shanklin, Isle Of Wight
02 December — 16 December
Delays unlikely Some carriageway incursion
Works location: Opposite 22
Works description: Skip (Weavers Brothers Ltd)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3321 Adelaide Grove, East Cowes, Isle Of Wight
02 December — 04 December
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Junction Of Yarborough Road To Minerva Road (Ml 130076) : Adelaide Grove-East Cowes:; Fw Cip Scheme Fw Cip S
Works description: Footway Re Construction And Surfacing (Fwl Bit Fullrecon/Fwr Bit Partrecon) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3326 Melville Street, Ryde, Isle Of Wight
02 December — 04 December
Delays unlikely Some carriageway incursion
Works location: Melville Street From Junction With Monkton Street To Cross Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

B3326 Monkton Street, Ryde, Isle Of Wight
02 December — 04 December
Delays unlikely Some carriageway incursion
Works location: Monkton Street From Junction With St John’S Road To Junction With Melville Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

B3327 Mitchell Avenue, Ventnor, Isle Of Wight
03 December — 05 December
Delays unlikely No carriageway incursion
Works location: Outside 22 Mitchell Ave,,29,Mitchell Ave ,Ventnor,,Po381dl,
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 2m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

B3341 St Georges Approach, Newport, Isle Of Wight
03 December — 05 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From St Georges Way, West To Junction Of Medina Avenue (Ml 210003 And Ml 210083): :; Sl Cip Scheme Sl Cip Schem
Works description: Install N? 6 Lanterns (N? 5 Columns) 1 Warning Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
03 December — 03 December
Delays unlikely Some carriageway incursion
Works location: Newport: : Calbourne Road-Newport
Works description: Sub Con – Findley Irvine Weather Station Works Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Brannon Way, Wootton, Isle Of Wight
03 December — 04 December
Delays unlikely No carriageway incursion
Works location: In F/W Tarmac Opp 4 To Opp Community Centre, Brannon Way
Works description: Remedial Reinstatement To Be Carried Out On Site In Footway In Footway
Responsibility for works: BT
Current status: Advanced planning

Pixley Hill, Freshwater, Isle Of Wight
03 December — 05 December
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Copse Lane, North To Single Light (Ml 630280): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 1 Lantern (N? 1 Column) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Church Litten, Newport, Isle Of Wight
03 December — 05 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From South Street, South To Medina Avenue (Ml 210142): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 8 Lanterns (N? 8 Columns) 1 Cctv Sign, 7 No Waiting/Loading Sign, 1 Route/Direction, 3 Warning Signs And 4 Lit Warning Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Great Preston Road, Ryde, Isle Of Wight
02 December — 04 December
Delays unlikely Some carriageway incursion
Works location: Great Preston Road From Junction With Brading Road To Great Preston Road Junction With Harding Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

Harding Road, Ryde, Isle Of Wight
02 December — 04 December
Delays unlikely Some carriageway incursion
Works location: Harding Road From Junction With Great Preston Road To Junction With High Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

High Street, Oakfield, Ryde, Isle Of Wight
02 December — 04 December
Delays unlikely Some carriageway incursion
Works location: High Street From Junction With Harding Road To Junction With St John’S Hill
Works description: Access To Bt Boxes Required To Recover Redundant Cable. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Out Of Hours. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

Churchill Road, Cowes, Isle Of Wight
02 December — 04 December
Delays unlikely No carriageway incursion
Works location: O/S 18, Churchill Road
Works description: Build 1 Precast Chamber 725mm X 255mm X 665mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Crossfield Avenue, Cowes, Isle Of Wight
02 December — 04 December
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Guppy Close To Partlands Avenue (Ml 140147): Crossfield Avenue-Cowes:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re-Construction Fwl/Fwr Bit Part Recon Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Downs View Road, Newport, Isle Of Wight
03 December — 05 December
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Footway Downs View Road (Ml F20387): Downs View Road-Newport:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re-Construction And Surfacing (Bit Part Recon) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Elizabeth Gardens, Havenstreet, Isle Of Wight
03 December — 05 December
Delays unlikely Traffic control (give & take)
Works location: Havenstreet: Whole Length Of Footway From Church Lane (Ml 361348): Elizabeth Gardens-Havenstreet:; Fw Cip Scheme Fw Cip
Works description: Footway Re-Construction And Surfacing( Bit Part Recon ) Havens
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Fleet Way, Shalfleet, Isle Of Wight
03 December — 05 December
Delays unlikely Traffic control (give & take)
Works location: Shalfleet: Whole Length Of Footway Fleetway, Shalfleet ( Ml F60385): Fleet Way-Shalfleet:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re-Construction And Surfacing (Bit Part Recon) Shalfl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Greenway, Binstead, Isle Of Wight
02 December — 15 December
Delays unlikely Traffic control (give & take)
Works location: Binstead: From The Mall, South To Verwood Drive (Ml 340534): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 8 Lanterns (No 6 Columns) 2 Warning Signs Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hinton Road, Newport, Isle Of Wight
02 December — 04 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From Junction With Wellington Road To Wolfe Close (Ml 240251): Hinton Road-Newport:; Fw Cip Scheme Fw Cip Schem
Works description: Footway Re-Construction And Surfacing (Bit Part Recon) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hollow Glade, Godshill, Isle Of Wight
03 December — 05 December
Delays unlikely Traffic control (give & take)
Works location: Godshill: Whole Length Of Hollow Glade (Ml 561195): Hollow Glade-Godshill:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re-Construction And Surfacing (Bit Part Recon 50%) Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Marlborough Road, Newport, Isle Of Wight
02 December — 04 December
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Road From Hinton Road (Ml 240253): Marlborough Road-Newport:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re-Construction And Surfacing (Fwl-Fw02 Fwr-Fw01) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Milton Path, Cowes, Isle Of Wight
02 December — 04 December
Delays unlikely Traffic control (give & take)
Works location: Cowes: Footway Between Milton Road Andstanley Road (F10110): Milton Path-Cowes:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Construction And Surfacing(Bit Full Recon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Oaklyn Gardens, Shanklin, Isle Of Wight
03 December — 05 December
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Green Lane, South East To Column 11: :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 2 Lanterns ( No 1 Column) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Osborne Road, East Cowes, Isle Of Wight
02 December — 04 December
Delays unlikely Traffic control (give & take)
Works location: East Cowes: From Ferry Road To Clarence Road (Ml 140224): Osborne Road-East Cowes:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re-Construction And Surfacing (Bit Part Re-Con) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Puckpool Hill, Seaview, Isle Of Wight
02 December — 15 December
Delays unlikely Traffic control (give & take)
Works location: Seaview: From Appley Road, North To Springvale Road (Ml 320090, Ml330376, Ml 330377 And Ml Ml 330378): :; Sl Cip Scheme
Works description: Install No 10 Lanterns (No 10 Columns) 1 Bus Stop, 1 No Ball Game Sign, 4 No Waiting Sign, 1 Route/Direction Sign, 3 Warning Signs And 1 Advert Banner Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Ell R Brown under CC BY 2.0