Bath Road roadworks signage

Roadworks and road closures: 4th July 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow.

A3054 Kite Hill, Wootton, Isle Of Wight
05 July — 08 July
Delays likely Traffic control (two-way signals)
Works location: Dp25 Outside The Sloop Inn Kite Hill Wootton Bridge I
Works description: Replacement Of Telegraph Pole To Restore Customer Service. Depth Of Pole Will Be Approximately 1.6 Mtrs.
Responsibility for works: BT
Current status: Advanced planning

Highfield Road, Shanklin, Isle Of Wight
04 July — 04 August
Delays likely Road closure
Works location: Shanklin: From Victoria Avenue To Westhill Road (Ml 440261): Highfield Road-Shanklin:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
04 July — 08 July
Delays possible Some carriageway incursion
Works location: 91 St James St
Works description: Perm Reinstatement Of F/Way
Responsibility for works: Southern Water
Current status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
04 July — 25 July
Delays possible Some carriageway incursion
Works location: O/S 100
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Beacon Alley, Godshill, Isle Of Wight
04 July — 05 July
Delays possible Traffic control (two-way signals)
Works location: Godshill: On W/B Side Of C/Way As You Come Out Of The Wooded Section Just Past The Single File Traffic Sign And On E/B S
Works description: Idr – Edge Of C/Way P/H 1.0 M X .30 X 70mm On W/B Side Edge Of C/Way P/H 1.10 X .25 X 60mm On E/B Side Tm – Stop And Go Boards Or Two Way Temp Lights (Cw: Pothole) Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning