Road closed block

Roadworks and road closures: 7th May 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow.

A3055 Sandown Road, Lake, Isle Of Wight
08 May — 08 May
Delays likely Traffic control (two-way signals)
Works location: Opposite 8and Outside 3 Sandown Rd Sandown
Works description: Access To Underground Structure – Cabling For New Customer Connection
Responsibility for works: BT

Copse Lane, Freshwater, Isle Of Wight
07 May — 21 May
Delays likely Road closure
Works location: Freshwater: From Regina Road 390m North (Ml630278): Copse Lane-Freshwater:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 23mm Ul-M 65psv And 85mm Foambase-Rural:H3) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Copse Lane, Freshwater, Isle Of Wight
07 May — 21 May
Delays likely Road closure
Works location: Freshwater: From Hookes Hill To Regina Road (Ml630277): Copse Lane-Freshwater:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Newnham Road, Binstead, Isle Of Wight
07 May — 06 June
Delays likely Road closure
Works location: Binstead: From Stroudwood Lane 260m North East (Ml330200): Newnham Road-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Binstead Hill, Binstead, Isle Of Wight
07 May — 09 May
Delays possible
Works location: 457486 92279 457536 92282 Clr 2 Blkgs, 1 In C.W O/S 5 Binstead Hill And 1 Opp Farriers Binstead Hil
Works description: Remedial To Rectify Reinstatement
Responsibility for works: BT

A3055 High Street, Shanklin, Isle Of Wight
08 May — 12 May
Delays possible
Works location: Shanklin: From Steephill Road To Landguard Road (Ml410033): High Street-Shanklin:; Cw Cip Scheme Cw Cip Scheme
Works description: Surfacing Preparatory Works, Replacing And Relaying Kerbs Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Image: Ell R Brown under CC BY 2.0