Road closed roadworks

Roadworks and road closures: 8th July 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow.

A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
08 July — 21 July
Delays likely Traffic control (two-way signals)
Works location: A3054 Jnc Corf Rd, Shalfleet, Iow, Main Road
Works description: Recover 8x 100m Of Existing Cable
Responsibility for works: BT
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
08 July — 08 August
Delays likely Road closure
Works location: Freshwater: From 350m North West Of Brook Village A Further 500m North West (Ml 620070): Military Road-Freshwater:; Stac
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Military Road, Freshwater, Isle Of Wight
08 July — 31 August
Delays likely Road closure
Works location: Freshwater: From Brook Village Road 350m North West Thereof (Ml620071): Military Road-Freshwater:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3327/A3055 St Boniface Road, Ventnor, Isle Of Wight
09 July — 29 August
Delays likely Road closure
Works location: Ventnor: From Leeson road To Spring Hill (Ml 520065): St Boniface Road-Ventnor:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:R/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Rural:H2) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Paddock Road, Shanklin, Isle Of Wight
08 July — 11 August
Delays likely Road closure
Works location: Shanklin: From Salem Road To Florence Road (Ml440280a): Paddock Road-Shanklin:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Vernon Square, Ryde, Isle Of Wight
08 July — 29 August
Delays likely Road closure
Works location: Ryde: From Melville Street To Barfield West Side Only (Ml342461): Vernon Square-Ryde:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Western Road, Shanklin, Isle Of Wight
09 July — 29 August
Delays likely Road closure
Works location: Shanklin: From High Street To Languard Road (Ml 440306): Western Road-Shanklin:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Camvbered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3021 York Avenue, East Cowes, Isle Of Wight
09 July — 11 July
Delays possible Some carriageway incursion
Works location: Flat 2 4-6 Your Ave
Works description: Perm Reinstatement Of F/Way
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 Forest Road, Newport, Isle Of Wight
08 July — 14 July
Delays possible Traffic control (two-way signals)
Works location: A3054, 400 Metres West Of Whitehouse Rd Junction Sections., Forest Road
Works description: Install 10x 100m Of Fibre Cable And Sub-Duct Into Duct
Responsibility for works: BT

Image: Craig Sunter under CC BY 2.0