Roadworks lights:

Roadworks and road closures: 27th January

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Coppins Bridge, Newport, Isle Of Wight
27 January — 29 January
Delays likely Traffic control (Stop/Go boards)
Works location: Newport: From Snooks Hill, South Round Roundabout, Back To Snooks Hill (Ml 210005, Ml 210006 And Ml 210007): :; Sl Cip S
Works description: Install N? 15 Lanterns (N? 12 Columns) 2 Warning Signs And 1 No Waiting Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

A3020 St Georges Way, Newport, Isle Of Wight
27 January — 29 January
Delays likely Traffic control (Stop/Go boards)
Works location: Newport: From Column 27, South To Junction Of Shide Road (Ml 210001, Ml 210002, Ml 210003 And Ml 210004): :; Sl Cip Sche
Works description: Install No 23 Lanterns (No 22 Columns) 3 X 40mph Signs, 3 Warning Signs, 1 Public Notice And 1 Lit Vehicle Activation Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

A3055 Marlborough Road, Ryde, Isle Of Wight
27 January — 04 February
Delays likely Traffic control (two-way signals)
Works location: 85 Marlborough Road, Ryde, Isle Of Wight.
Works description: – Repair Collapsed Sewer 2.5 Metres Deep In Carriageway.
Responsibility for works: Southern Water
Current status: Work in progress

Madeira Road, Ventnor, Isle Of Wight
28 January — 10 February
Delays likely Road closure
Works location: From Junc Maderia Vale To O/S 46
Works description: Excavation Of Joint Bay In Road And Cable Trench To Provide New Electrical Supply To New Property Adj 25 Backfill And Reinstate
Responsibility for works: Southern Electric
Current status: Advanced planning

A3055 Church Road, Shanklin, Isle Of Wight
28 January — 30 January
Delays possible Some carriageway incursion
Works location: Old Thatch Tea Shop 4, Church Rd, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
28 January — 03 February
Delays possible Some carriageway incursion
Works location: O/S 32
Works description: Scaffold (B Ashton Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330 Eddington Road, St Helens, Isle Of Wight
27 January — 29 January
Delays possible Traffic control (two-way signals)
Works location: Eddington Road From Upper Green Road To Eddington Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Work in progress

B3330 Upper Green Road, St Helens, Isle Of Wight
27 January — 29 January
Delays possible Traffic control (two-way signals)
Works location: Upper Green Road From Lower Green Road To Eddington Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Work in progress

B3341 St Johns Place, Newport, Isle Of Wight
27 January — 29 January
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: From Trafalgar Road, South To Medina Avenue (Ml 210082): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 2 Lanterns (No 2 Columns) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

B3401 Calbourne Road, Newport, Isle Of Wight
28 January — 30 January
Delays possible Traffic control (two-way signals)
Works location: Various Locations From Its Junc With Sun Hill With Apesdown Corpse.
Works description: Start 08.00. Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Are Required. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. Work Will Take Place During Working Hours . Some Work May Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

Latimer Road, St Helens, Isle Of Wight
27 January — 29 January
Delays possible Traffic control (two-way signals)
Works location: Latimer Road From Embankment Road To Lower Green Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Work in progress

Lower Green Road, St Helens, Isle Of Wight
27 January — 29 January
Delays possible Traffic control (two-way signals)
Works location: Lower Green Road From Latimer Road To Upper Green Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Work in progress

A3020 Victoria Avenue, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 24, Victoria Ave, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 Union Street, Ryde, Isle Of Wight
28 January — 06 March
Delays unlikely Some carriageway incursion
Works location: O/S 44
Works description: Scaffold (B Ashton Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
28 January — 05 February
Delays unlikely Some carriageway incursion
Works location: Opp 73 To Opp 93/95 , School Green Road
Works description: Install 131m Of 1 Way Poly Duct In Footway,Install 3m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Alfred Street, Ryde, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 1
Works description: – Core Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3395 Sherbourne Street, Bembridge, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: China China
Works description: – Core Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Bonchurch Village Road, Ventnor, Isle Of Wight
27 January — 29 January
Delays unlikely Some carriageway incursion
Works location: The Old Smugglers Cottage, Bonchurch Village Road,Ventnor,Iow.
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Brook Road, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 26, Brook Rd, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Brook Road, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 4, Brook Rd, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Alverstone Road, Newchurch, Isle Of Wight
27 January — 29 January
Delays unlikely Some carriageway incursion
Works location: Godden Green, Alverstone Rd, Apse Heath, Sandown, Po360lh
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Upton Road, Ryde, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 74, Upton Rd, Ryde, Po333hx
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Upton Road, Ryde, Isle Of Wight
28 January — 04 February
Delays unlikely Traffic control (give & take)
Works location: Os 6
Works description: Gsmr/Hse Cut Off – So35034
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Cedar Drive, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 9 Cedar Drive, Shanklin, Isle Of Wight .
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Collingwood Road, Newport, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 6, Collingwood Rd, Newport, Po301qs
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Collingwood Road, Newport, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 25, Collingwood Rd, Newport, Po301qs
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Crescent Road, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 16 Crescent Road , Shanklin, Isle Of Wight.
Works description: – Install New Water Connections
Responsibility for works: Southern Water
Current status: Advanced planning

Gordon Road, Newport, Isle Of Wight
27 January — 29 January
Delays unlikely Traffic control (give & take)
Works location: Newport: From Halberry Housr 200 Mtrs West (Ml 261202): Gordon Road-Newport
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Josephs Way, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 32, Josephs Way, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Lind Hill, Ryde, Isle Of Wight
27 January — 27 February
Delays unlikely Some carriageway incursion
Works location: O/S 7-11
Works description: Building Materials (Dn Associates)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newport Footpath 179, Newport, Isle Of Wight
28 January — 29 January
Delays unlikely No carriageway incursion
Works location: In Footway 15m South Frm Jcn With High Street On, Newport Footpath 179
Works description: Locate And Excavate 1 Blockage In Existing Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Perowne Way, Sandown, Isle Of Wight
27 January — 29 January
Delays unlikely Traffic control (give & take)
Works location: Sandown: Link Footway Starting At 16 Perowne Way (Ml F40714): Perowne Way-Sandown
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Princes Way, Shanklin, Isle Of Wight
27 January — 29 January
Delays unlikely Some carriageway incursion
Works location: 3, Princes Way ,Shanklin, Po377dy
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Prior Crescent, Newport, Isle Of Wight
28 January — 30 January
Delays unlikely No carriageway incursion
Works location: Opp 1, Prior Crescent
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S)
Responsibility for works: BT
Current status: Advanced planning

Seagrove Manor Road, Seaview, Isle Of Wight
27 January — 05 February
Delays unlikely Traffic control (give & take)
Works location: Os Ranlagh
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Silver Trees, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 32, Silver Trees, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

St Catherines Road, Niton, Isle Of Wight
27 January — 29 January
Delays unlikely No carriageway incursion
Works location: Jnc Undercliff Drive On, St Catherines Road
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 2m Of 3 Poly Ducts In Footway
Responsibility for works: BT
Current status: Advanced planning

Youngwoods Copse, Newchurch, Isle Of Wight
28 January — 30 January
Delays unlikely Traffic control (give & take)
Works location: Newchurch: Whole Length Of Road From Hoolwood Road (Ml 440441): Youngwoods Copse-Newchurch
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: svensson under CC BY 2.0