Bath Road roadworks signage

Roadworks and road closures: 6th March

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

B3329 Beachfield Road, Sandown, Isle Of Wight
06 March — 09 May
Delays likely Road closure
Works location: Sandown: From Royal Street To Broadway (Ml420094) : Beachfield Road-Sandown:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Sandow
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
06 March — 10 March
Delays possible Some carriageway incursion
Works location: 173, Carisbrooke Rd, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 West Street, Ryde, Isle Of Wight
06 March — 10 March
Delays unlikely Traffic control (give & take)
Works location: (Pcp38) Bduk. Opposite 4 To 6 Dairy Court, West Street.
Works description: Install 4m Of 1 Way Power Duct In Footway.
Responsibility for works: BT
Current status: Advanced planning

A3055 Avenue Road, Freshwater, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: Os Toby Jug Cafe
Works description: Remedial Works To Be Carried Out – Self Core Failure
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
06 March — 19 March
Delays unlikely No carriageway incursion
Works location: (Pcp22) Bduk. Outside 106 Marlborough Road.
Works description: Install 5m Of 1 Way Power Duct In Footway,Performing An 1excavation To Expose Existing Power Cable In Footway.
Responsibility for works: BT
Current status: Advanced planning

A3056 Arreton Street, Arreton, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: Greystones, Main Rd, Arreton, Newport, Po303al
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Adelaide Place, Ryde, Isle Of Wight
06 March — 19 March
Delays unlikely Traffic control (give & take)
Works location: (Pcp38) Bduk. Opposite 4 To 6 Dairy Court Across Carriageway To Side Of 62 West Street On, Adelaide Place.
Works description: Install 4m Of 1 Way Power Duct In Footway,Install 8m Of 1 Way Power Duct In Carriageway,Performing An 1excavation To Expose Existing Power Cable In Footway.
Responsibility for works: BT
Current status: Advanced planning

B3327 Newport Road, Ventnor, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 79, Newport Rd, Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3395 Sherbourne Street, Bembridge, Isle Of Wight
06 March — 10 March
Delays unlikely No carriageway incursion
Works location: Junction Of Church Road & Sherbourne Street Crosing Sherbourne Street
Works description: Main Laying Of Hv 150mm 3c Polymetric Cable And Hv Jointbay For Final Connection In The Footway.
Responsibility for works: Gas Transportation Co Ltd
Current status: Advanced planning

B3395 Steyne Road, Bembridge, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: Os 8a
Works description: Remedial Works To Be Carried Out – Self Core Failure
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Bluett Avenue, Seaview, Isle Of Wight
06 March — 19 March
Delays unlikely Traffic control (give & take)
Works location: Outside Crown Slip Crossing Carriageway To Opposite Crown Slip, Bluett Avenue.
Works description: Install 2m Of 1 Way Power Duct In Footway,Install 7m Of 1 Way Power Duct In Carriageway,Performing An 1excavation To Expose Existing Power Cable In Footway
Responsibility for works: BT
Current status: Advanced planning

Bowdens Mead Close, Newport, Isle Of Wight
06 March — 19 March
Delays unlikely Traffic control (give & take)
Works location: Newport: From Westminster Lane, West, Then North To Dead End (Ml 240159):
Works description: Install N? 4 Lanterns (N? 4 Columns) 1 Neighbourhood Watch Sign Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Gills Cliff Road, Ventnor, Isle Of Wight
06 March — 19 March
Delays unlikely Some carriageway incursion
Works location: Os 24
Works description: Gsmr/Hse Cut Off 37398
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 154, Gunville Rd, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Victoria Road, Cowes, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 33, Vitoria Rd , Cowes
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Ward Avenue, Cowes, Isle Of Wight
06 March — 10 March
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Park Road 200mtrs North (Ml130088): Ward Avenue-Cowes
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr:Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Churchill Road, Cowes, Isle Of Wight
06 March — 10 March
Delays unlikely No carriageway incursion
Works location: O/S 18, Churchill Road
Works description: Build 1 Precast Chamber 725mm X 255mm X 665mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway,Install 8m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

Clarence Road, Newport, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 11, Clarence Rd, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Crocker Street, Newport, Isle Of Wight
06 March — 12 March
Delays unlikely No carriageway incursion
Works location: 55m North East From Jcn Of Mill Street On , Crocker Street
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 2m Of 4 Poly Ducts In Footway,Install 2m Of 5 Poly Ducts In Footway
Responsibility for works: BT
Current status: Advanced planning

Cross Lane, Newport, Isle Of Wight
06 March — 10 March
Delays unlikely No carriageway incursion
Works location: S/O 39 Staplers Road, Cross Lane.
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 3 Poly Ducts In Footway.
Responsibility for works: BT
Current status: Advanced planning

Dudley Road, Ventnor, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 45, Dudley Rd, Ventnor, Po381eq
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Fitzroy Street, Sandown, Isle Of Wight
06 March — 17 March
Delays unlikely Traffic control (give & take)
Works location: Opposite Number 9 Upper Flat
Works description: Alteration Of Gas Supply From Farside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Garfield Road, Shanklin, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 6, Garfield Rd, Shanklin
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Hillcrest Road, Rookley, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 6, Hillcrest Rd, Rookley, Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Hope Road, Shanklin, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: New House At 11 Beatrice Avenue, Shanklin, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Lower Highland Road, Ryde, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 26
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Madeira Road, Ventnor, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 44a, Madeira Rd, Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Marlborough Close, Ryde, Isle Of Wight
06 March — 19 March
Delays unlikely No carriageway incursion
Works location: (Pcp22) Bduk. Side Of 106 Marlborough Road On, Marlborough Close.
Works description: Install 1m Of 1 Way Power Duct In Footway,Install 7 Of 1 Way Power Duct In Verge.
Responsibility for works: BT
Current status: Advanced planning

Maybrick Road, Binstead, Isle Of Wight
06 March — 19 March
Delays unlikely Traffic control (give & take)
Works location: Side Of 22 Crossing Carriageway To Side Of 20 Sherborne Avenue On Maybrick Road.
Works description: Install 4 Of 1 Way Power Duct In Verge,Install 7m Of 1 Way Power Duct In Carriageway,Performing An 1excavation To Expose Existing Power Cable In Footway.
Responsibility for works: BT
Current status: Advanced planning

Mountbatten Avenue, Cowes, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 2 Mountbatten Avenue, Cowes, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Newport Street, Ryde, Isle Of Wight
06 March — 16 March
Delays unlikely Some carriageway incursion
Works location: O/S 7
Works description: Scaffold (Island Scaffold)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Paddock Close, Shorwell, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 8, Paddock Cl, Shorwell Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Queens Court, East Cowes, Isle Of Wight
06 March — 19 March
Delays unlikely Traffic control (give & take)
Works location: East Cowes: From Victoria Grove, North To Dead End (Ml 130033):
Works description: Install N? 4 Lanterns (N? 4 Columns) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St Davids Road, East Cowes, Isle Of Wight
06 March — 10 March
Delays unlikely No carriageway incursion
Works location: S/O 92 Upper Yarborough Road On, St Davids Road
Works description: Install 14m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

St Margarets Glade, Ventnor, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 12, St. Margarets Glde, Ventnor
Works description: – Interimt To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Venner Avenue, Northwood, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 31, Venner Ave, Cowes
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

West Street, Seaview, Isle Of Wight
06 March — 19 March
Delays unlikely Some carriageway incursion
Works location: O/S 23
Works description: Scaffold (Thf Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Windsor Drive, Shanklin, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 31, Windsor Drv, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Worsley Road, Newport, Isle Of Wight
06 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 11, Worsley Rrd, Newport
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning