East Cowes Esplanade Landslip by Allan Marsh

Roadworks and road closures: 22nd October 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Fairlee Road, Newport, Isle Of Wight
23 October — 27 October
Delays likely Traffic control (two-way signals)
Works location: 303 Fairlee Road , Newport, Isle Of Wight.
Works description: – Replace F/H Frame & Cover
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 Quarr Hill, Binstead, Isle Of Wight
23 October — 24 October
Delays likely Traffic control (two-way signals)
Works location: Binstead: : Above Woodstock 30/40:; Scheduler Ops Hub
Works description: Supply/ Install New Illuminated 30/40 Signs (Column May Be Required) Tm 2 Way T/L’S Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Afton Road, Freshwater, Isle Of Wight
22 October — 01 December
Delays likely Road closure
Works location: Freshwater: From 170m North Of Newport Road To 420m North Of Newport Road (Ml620057) : Afton Road-Freshwater:; Stacey
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alverstone Road, East Cowes, Isle Of Wight
23 October — 01 December
Delays likely Road closure
Works location: East Cowes: From Whippingham Road (Southern Junction) 500m North East (Ml240147) : Alverstone Road-East Cowes:; Stace
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Southview, Rookley, Isle Of Wight
23 October — 21 November
Delays likely Road closure
Works location: Rookley: From Bagwich Lane To Chequers Inn Road (Ml 640586): Southview-Rookley:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Rookle
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Alpine Road, Ventnor, Isle Of Wight
22 October — 24 October
Delays possible Traffic control (two-way signals)
Works location: From Church St To Zig Zag Road
Works description: Cable Recovery Using Rolling Traffic Lights
Responsibility for works: BT
Current status: Advanced planning

B3323 Pyle Street, Newport, Isle Of Wight
22 October — 04 November
Delays possible Some carriageway incursion
Works location: O/S67
Works description: Scaffold (Island Scaffold)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 Medina Avenue, Newport, Isle Of Wight
22 October — 04 November
Delays possible Traffic control (two-way signals)
Works location: Newport: From Terrace Road, East, Then South To Shide Road (Ml 210082, Ml 210083, Ml 240140 And Ml 240141): :; Sl Cip Sc
Works description: Install No 28 Lanterns (No 25 Columns) 2 Bus Stops, 1 Neighbourhood Watch Sign, 3 No Waiting Signs, 6 Route/Direction Signs, 5 Warning Signs, 1 Cctv Related Sign And 1 Traffic Sign Head Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 St Johns Place, Newport, Isle Of Wight
22 October — 04 November
Delays possible Traffic control (two-way signals)
Works location: Newport: From Trafalgar Road, South To Medina Avenue (Ml 210082): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 2 Lanterns (No 2 Columns) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 Trafalgar Road, Newport, Isle Of Wight
22 October — 04 November
Delays possible Traffic control (two-way signals)
Works location: Newport: From St James Street Upper, West To Carisbrooke Road (Ml 230090 And Ml 230089): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 16 Lanterns (No 11columns) 3 Lit Warning Signs, 1 Power Supply Socket, 1 Lit Amber Flashing Sign And 1 Lit Vehicle Speed Activated Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: © With kind permission of Allan Marsh