Brewin Dolphin Commodores’ Cup: Overnight Driftathon Expected (video)

Here’s an update for those interested in the sailing taking place just off Cowes this week. Ed

Brewin Dolphin race by Rick Tomlinson:At 1000 the 21 competing yachts set off on the Brewin Dolphin Commodores’ Cup 24-36 hour long offshore race, the most highly scoring segment in this series for international three boat teams with amateur crews.

While conditions this year have been mainly blustery, the start today was in the same summery conditions as yesterday, with brilliant sunshine but precious little wind.

Complex course for the offshore race
The race management team has set up a complex course for the offshore race, taking the boats east out of the Solent and through the Forts, before heading south to a virtual mark 17 miles out into the Channel.

Once round this the boats retrace their steps north towards the Outer Nab mark, before taking a long leg east to the CS1 mark, 15 miles south of Brighton and back. In total the proposed race is 154 miles long, but it seems highly likely it will be shortened.

“I think we will drift down on the tide and we’ll drift back up on the tide with some intermittent kedging!” summarised Andrew McIrvine, skipper of La Reponse in RYA Team GBR Blue of how he reckoned the race would pan out. But he also observed that the prescribed route allowed the race management team plenty of scope to shorten course if required.

Having just emerged from the meteo briefing with the Team GBR forecaster Chris Tibbs, McIrvine said that they were expecting possibly as much as 10 knots of wind this afternoon. “If we can get the north-south bit done, then at least if we do kedge we can get up closer into the shore. But kedging round the Owers when the tide is running at 4 knots isn’t much fun.”

Struggling to make headway
Mid-afternoon the boats were still struggling to make headway down to the waypoint out in the English Channel, due south of Bembridge. With the tide due to change from eastbound to westbound at 1430 BST, all the boats were getting their easting in early with La Reponse taking the most extreme easterly route south as the faster Ker 40s, anticipating an earlier rounding, were playing out a braver strategy on a shorter more direct route to the mark.

A small problem is that this virtual mark is described as a ‘port rounding’ and this could prove challenging, as tactician Phil Lawrence on the Hong Kong team’s EFG Bank Mandrake observed: “The big issue is that we’re going to a mark out in the Channel, and we’re on spring tides at the moment, and when we get there the tide will be ebbing very strongly [ie westbound], the wind will be a very light easterly, and we’ve got to get round it to port, which may prove mission impossible. I’m expecting a lot of issues there…”

Forced to kedge
If crews find themselves becalmed down tide of the mark then they will be forced to kedge. On the dock prior to leaving there was much talk of this – first finding the kedge anchor and then determining how much line they should attach to it.

McIrvine reckoned he could rustle up 130m on La Reponse. On CNBC in RYA Team GBR Red, skipper Paul Worswick said they were taking two 100m lengths which would allow them to set the kedge in 50m of water. “We are going to need that,” he advised.

At 1600 BST Magnum III, Andrew Pearce’s Ker 40, in RYA Team GBR White, was closing on ‘Waypoint 1’ with sistership Jonathan Goring’s Keronimo on her hip and the Hong Kong team’s Peninsula Signal 8 a little further behind.

Low rated boats doing well
The two lowest rated boats in the fleet – CNBC and the British Keelboat Academy on David Aisher’s J/109 Yeoman of Wight, overall leaders RYA Team GBR Black – were also doing extremely well for their size and speed.

While the Ker 40s suffered in the 8-10 knot winds yesterday, Andrew Pearce reckoned that in the lighter conditions forecast for tonight the four near one designs competing should come into their own again. “5 knots is fine because we are so light for our sail area. In 8 knots, we can’t get far enough away from the chasing pack.”

Making the best of the tidal gates
Assuming that the boats get around Waypoint 1 successfully, then they will have to sail north with a building easterly tide to get back to the Outer Nab mark before heading east to the CS1 mark.

This will be a case of making the best of the tidal gates and the available zephyrs off the shore. Fortunately while the virtual mark is too far offshore for competitors to experience a sea breeze the legs east and back might be close enough to shore for the crews to see a land breeze tonight.

Spring tides are challenging
McIrvine shared his predictions for this evening: “I think there will be a bit of a land breeze at night, or even some drainage winds from the harbours if you get in close enough. But there are also quite big spring tides at the moment with interesting shallow bits, so I think it’s going to be a challenge.”

CNBC’s Paul Worswick said that the time at which they got back north to the Outer Nab mark would be crucial. “If we can’t get around there to go off to CS1 we’ll be kedging and then I think it will be game over for us. If we get around there with positive tide and some breeze then there’s a possibility. At some stage everyone in the fleet is going to be kedging which is great for us as the second slowest rated boat.”

A tidal race
Phil Lawrence was forecasting that the boats might see 2-5 knots during the night. “It’s going to be more of a tidal race than a weather routing race – you’ve got to stay on top of what you’ve got, so very local. My prediction is that a Ker 40 or Yeoman will win.”

McIrvine pointed out that in such light conditions it is much harder on the crew than when there’s a lot of breeze. “It’s fun to have some sun. We have been out in masses of breeze, so we have almost forgotten how to do this…” But these winds also present their own issues as the crew can start to get a little “ratty and frustrated”, so a skipper has to demonstrate his or her own management skills.

Before leaving Magnum III’s skipper Andrew Pearce agreed: “Tactically it is going to be very crucial getting it right, because in these light conditions a couple of miles apart between different boats you can get different winds and all sorts can happen. So the crew has to be ultra-aware for the complete duration of the race about what is going on around them. Races like this can be more taxing than even the Myth of Malham which was a tough race, but tough for different reasons. So it is going to be an interesting one.”

The boats are expected back into Cowes tomorrow afternoon.

Image: © Rick Tomlinson

Advertisement
Subscribe
Email updates?
0 Comments
oldest
newest most voted
Inline Feedbacks
View all comments
Gordon
21, February 2017 7:35 pm

I’m relatively new to the island but do remember the road as existed prior to the recent landslip.
Can anybody tell me how long the previous road had been in existence and whether there were any issues in that timeline.
Also, were there any studies done prior to the building of the existing road.

Robert Jones
Reply to  Gordon
22, February 2017 5:19 pm

Well, I certainly can’t – but hundreds of years, anyway. It has long been known that this area is prone to movement, this is true of the entire coast. When you say “the existing road”, you’re presumably meaning the original construction – and there was a great deal more land between the route and the sea back then. Googling the Undercliff will probably fill in most of… Read more »

Robert Jones
21, February 2017 7:38 pm

I do like the sting in the tail. “Of course, if you are seeking to be elected in three months time as a Ward Member for Niton it’s easy to get carried away with yourself.” Re-opening Undercliff Drive is not an immediate or even medium-term prospect. Many will wish it was, because of the impact the loss of the road is having on businesses and properties in… Read more »

Philip Hawkins
Reply to  Robert Jones
21, February 2017 9:23 pm

Keeping Undercliff Drive open would have been easier before Island Roads embarked on their grandiose scheme – the “patch when required” philosophy had worked for many decades. The current state has left things both better and worse than they were before. To begin to understand the problem, you have to realise that there are two distinct zones of movement, and that the solutions required are not the… Read more »

Robert Jones
Reply to  Philip Hawkins
22, February 2017 5:09 pm

Big ‘ifs’ there, but thanks for the very useful background information.

Alan Bennett
21, February 2017 10:27 pm

So, 5 years just to evaluate and look at. Why not repair now and have the road open for the next 5 years whilst people earn consultancy fees to top up their pensions. Consultant, Wikipedia should list the job under licence to print money.

wightlad
21, February 2017 10:59 pm

Why is Cllr Jordan referred to as a matey ‘Phil’ yet Cllr Stewart given his full formal title?

I would be happy to be disabused of the view but it looks suspiciously like a cosy-up between Cllr Jordan and the editorial team at OTW if you ask me.

Sally Perry
Admin
Reply to  wightlad
22, February 2017 7:49 am

The suggestion of a cosy-up is ridiculous. Dave Stewart is referred to twice in the article by myself, once as ‘Dave Stewart’ and once as ‘Cllr Stewart’. Had there been more references I probably would have referred to him as ‘Dave’, as I have done in other articles (and been criticised for by ‘electrickery’). It appears that I can’t win. (PS. As can be clearly seen in… Read more »

Robert Jones
Reply to  Sally Perry
22, February 2017 5:21 pm

I wouldn’t worry about it – whatever you do, you’re going to be blamed by someone for doing it: such are the joys of social media.

Mark dunsford
22, February 2017 7:18 am

This sounds like something that could be in the script for yes minister. “We need to set up a feasability study to look into the costs Of setting up a feasability study to investigate the findings of the previous feasability study with a view to setting up a study into the feasibilty of reasearch int….” Sounds more like a career than anything likely to produce actual results.… Read more »

tr
Reply to  Mark dunsford
22, February 2017 8:51 am

when all we needed were the army to rapidly construct a crossing…

John Nash
22, February 2017 1:34 pm

Sorry, but I’m afraid this all calls to mind a radio show where the panel guests had to announce amusing arrivals at a stately ball. The funniest was “Mr Capability Brown and and his partner Feasibility Brown”. None of the proponents are mentioning the constraints. Here is a fairly large one from the Environment Agency’s 2013 Isle of Wight Abstraction Licensing Strategy 2013: Section 4.2 is headed… Read more »

GarageElfinIOW
23, February 2017 11:12 am

Many many years ago in a land that time forgot a road was built so that people could get from A to B. This conveneince enabled the concept of travel between two places and led to trade between those places and allowed the road users to seek employment elsehwere and thereby improve their prospects. The road lasted a very very long time (best part of 80/90 years)… Read more »

ThomasC
23, February 2017 12:20 pm

Those questioning why everyone isn’t just getting on with it would do well to nip down to the end of the old Blackgang Road outside of Niton and have a look across to where the disconnected other end of the road is, which still remains there. When they’re looking across to the other bit of road, they should have a little think about how anyone would build… Read more »