Road works road closed signs

Isle of Wight roadworks and road closures 15th October 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

Atherley Road, Shanklin, Isle Of Wight
16 October — 16 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H2, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Shankl at Shanklin: From Wilton Park Road To North Road (Ml420165) : Atherley Road-Shanklin:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

East Street, Ryde, Isle Of Wight
15 October — 30 October Road closure
Delays likely due to Streetworks
– Flood Alleviation Scheme – Connect Sewer Pipe Line From The Strand Into Chamber In East Street. at East Street Jct The Strand,Ryde,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

Watery Lane, Newchurch, Isle Of Wight
16 October — 29 October Traffic control (two-way signals)
Delays possible due to Streetworks
Shanklin 11 Power Connection Following Street Cabinet Installation: 10 Days Notice Required To: Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 150m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at Os Garden Centre, Watery Lane,
Responsibility: BT
EToN status: Advanced planning

Deacons Lane, Ryde, Isle Of Wight
16 October — 19 October No carriageway incursion
Delays unlikely due to Streetworks
Blocked Tee – Footway at Outside 35 – 45
Responsibility: Virgin Media
EToN status: Advanced planning

Heath Road, Lake, Isle Of Wight
15 October — 19 October Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Connection at 21 Heath Road, Sandown ,Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Station Road, Sandown, Isle Of Wight
15 October — 22 October Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (B Ashton Scaffolding) at O/S 4c
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Image: Stew Dean under CC BY 2.0