Roadworks traffic light (Cowleaze)

Isle of Wight roadworks and road closures 8 March 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org.

A3054 Fairlee Road is programmed to be closed from Snooks Hill / Staplers Road to Medina College for carriageway surfacing works on approx. 17 nights {Mondays to Fridays) from 1930hrs until 0600hrs starting on Tuesday 8 March 2016. The works are due to be completed on approx. 5 April(weather permitting). The route for diverted traffic will be: Staplers Road, Whiterails Road, Station Road, A3054 High Street (Wootton), Lushington Hill, Racecourse and Fairlee Road For further details about these works please contact Island Roads on 01983 822440.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure

Lane End Road will be closed between Foreland Farm Road and the end of the highway (at Fisherman’s Walk) from 1030hrs until 1430hrs on Thursday 10 March 2016. The closure is for carriageway repair works by Island Roads. Vehicular access in emergency situations will be maintained. For further details about these works please contact Island Roads on 01983 822440.

Fairway, Lake – One Way Restriction will be in operation in a Northeast direction from A3055 Lake Hill to The Fairway. The restriction is required from 0900 hours on Tuesday 8 March until 1700 hours on Friday 11 March 2016. The route for diverted traffic travelling in a Southwest bound direction will be: Lake Hill and the Eastern side of the traffic Island. For further details about these works please contact the Southern Electric Call Centre on 0845 770 8090

A3055 Appley Road will be closed from 6.30pm until 6am on one further night between Tuesday 8 March and Friday 11 March 2016. The closure is from Marlbourgh Road to Easthill Road for carriageway and footway repairs, resurfacing, and drainage works by Island Roads.

Bedbury Lane will be closed from 6.30am until 6pm on approximately 5 to 10 days between Wednesday 9 and Friday 11 March 2016. The closure is from Victoria Road to a point 400 metres to the Northwest for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. The closure will be closed from Victoria Road to a point 400 metres to the Northwest. The route for diverted traffic will be: Victoria Road, Camp Road and Queens Road

A3055 East Hill Road, Ryde, Isle Of Wight
09 March — 09 May
Delays likely Road closure
Works location: Ryde: From Ampthill Road To The Strand (Ml310058) : East Hill Road-Ryde:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H1, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bedbury Lane, Freshwater, Isle Of Wight
09 March — 09 May
Delays likely Road closure
Works location: Freshwater: From Victoria Road 410m Northwest (Ml 630207): Bedbury Lane-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Lane End Road, Bembridge, Isle Of Wight
09 March — 11 March
Delays likely Road closure
Works location: Bembridge: On The Bend Where Lane End Joins Fishermans Walk On Offside Tyreline: Lane End Road-Bembridge
Works description: P/H’S X 4 .80 X .50 X 45mm .45 X .45 X 40mm (P/H Repair Of Previous Patch That Has Depressed) .45 X .20 X 30mm .50 X .10 X 40mm Surface Crazing So 2 Patches And 1 Infill Req’D 1.80 X 1.10 X 50/100mm 1.80 X 1.60 X 50/100mm Reinstate 4 Broken Centrelines On Completion Of Repairs 4 X 4m X 100mm Tm – Ds Advices Road Closure (Only Access To The Bembridge Coast Hotel So Quite Frequently Used By Coaches And Cars Alike) (Cw: Pothole) Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hazely Combe, Arreton, Isle Of Wight
09 March — 11 March
Delays likely Road closure
Works location: Arreton: 21(2),2(2),4,10(3),16(2),17,19: Hazely Combe-Arreton
Works description: Opposite The Manor (Enquiry 16070847) 0.35×0.2×40 0.35×0.35×40, 0.5×0.35×40 0.4×0.3×40 0.5×0.3×45 0.45×0.3×40 0.4×0.2×45 0.6×0.4×40 0.7×0.5×40 0.65×0.4×45 0.95×0.45×90 0.8×0.4×60 Give & Take Tm – (Cw: Pothole) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 River Road, Yarmouth, Isle Of Wight
09 March — 11 March
Delays possible Traffic control (two-way signals)
Works location: Yarmouth: On Island Just North Of Main Road (Ml 610017): On 2nd Island – Refuge
Works description: Replacement Of N. 1 Refuge Pole Yarmouth
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3322 Alum Bay New Road, Totland, Isle Of Wight
09 March — 22 March
Delays possible Traffic control (two-way signals)
Works location: Totland: From Cliff Road To York Road (Ml630098) : Alum Bay New Road-Totland
Works description: Works To Accesses To Allow For Resurfacing Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Niton Road, Rookley, Isle Of Wight
09 March — 11 March
Delays possible Traffic control (two-way signals)
Works location: Rookley: Ml630241 Dolcroft Road To Harts Lane: Niton Road-Rookley
Works description: Works To Accesses To Allow For Resurfacing Rookley
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Atherley Road, Shanklin, Isle Of Wight
08 March — 17 March
Delays possible Traffic control (two-way signals)
Works location: Os 20 – 22
Works description: Lay New Main From Farside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Ashley Way, Brighstone, Isle Of Wight
09 March — 11 March
Delays unlikely Some carriageway incursion
Works location: Os 29 Ashley Way, Brighstone
Works description: Brighstone – 329974 – Blockages In Footpath – Excavate Onto Bt Ducts For The Clearance Of Duct Blockages In Fw/Verge/Cw To Facilitate Spine Cabling Works.
Responsibility for works: BT
Current status: Advanced planning

Broadway Crescent, Binstead, Isle Of Wight
09 March — 22 March
Delays unlikely Traffic control (give & take)
Works location: Adj 104
Works description: Excavate In Carriageway And Footway For New Electrical Supply Backfill And Reinstate
Responsibility for works: Southern Electric
Current status: Advanced planning

Cliff Road, Cowes, Isle Of Wight
08 March — 10 March
Delays unlikely Some carriageway incursion
Works location: 15 – 25 Cliff Road, Cowes
Works description: – No Dig Access Required To Manhole To Carry Out Sewer Lining Works
Responsibility for works: Southern Water
Current status: Advanced planning

Fellows Road, Cowes, Isle Of Wight
09 March — 16 March
Delays unlikely Some carriageway incursion
Works location: O/S 20
Works description: Skip App. 20 Fellows Road, 09/03 – 16/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Golden Ridge, Freshwater, Isle Of Wight
09 March — 10 March
Delays unlikely Traffic control (give & take)
Works location: Freshwater: Left Hand Spur Off Golden Ridge, 37m, Ml 640370b: Golden Ridge-Freshwater
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Park Square, Ryde, Isle Of Wight
09 March — 16 March
Delays unlikely Some carriageway incursion
Works location: Os 4
Works description: Gsmr/Hse Cut Off – So53306
Responsibility for works: SGN
Current status: Advanced planning

Shippards Road, Brighstone, Isle Of Wight
09 March — 11 March
Delays unlikely Some carriageway incursion
Works location: Os 13 Shippard Road Until The Junction Of Ashley Way , Brighstone
Works description: Brighstone – 329974 – Blockages In Footpath – Excavate Onto Bt Ducts For The Clearance Of Duct Blockages In Fw/Verge/Cw To Facilitate Spine Cabling Works.
Responsibility for works: BT
Current status: Advanced planning

The Fairway, Lake, Isle Of Wight
08 March — 21 March
Delays unlikely Some carriageway incursion
Works location: O/S Tesco Express (Former Old Manor House Pub)
Works description: Excavate In Footway For New Electric Supply. Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Advanced planning

Wilberforce Road, Brighstone, Isle Of Wight
09 March — 11 March
Delays unlikely Some carriageway incursion
Works location: Os 21-27 Wilberforce Road Brighstone Po30 4be
Works description: Brighstone – 329974 – Fiber Path Clearance, Blockages And Jf4 Lid Change
Responsibility for works: BT
Current status: Advanced planning