Staplers Road. A one way restriction will be in operation from 0900hrs on Tuesday 12 April until 1700hrs on Thursday 28 April 2016 in a Southwest direction between Coppins Close and A3054 Fairlee Road. The one way restriction is for the re-building of a rebuilding of a British Telecom Manhole chamber at the junction withy Fairlee Road. Diversion Route for traffic: A3054 Fairlee Road, Racecourse, Lushington Hill, High Street (Wootton), Station Road, Whiterails Road and Staplers Road.

A3054 Yarmouth Road, Calbourne, Isle Of Wight
12 April — 14 April
Delays likely Traffic control (multi-way signals)
Works location: Calbourne: At Bartons Corner On Both Sides Of The C/Way: Yarmouth Road-Calbourne
Works description: 28 Day Perm Required Sawcut And Infill Dr – P/H’S X 2 .60 X .50 X 30mm W/B Side 1.3 X .20 X 30mm E/B Side Tm – Stop & Go Boards (Cw: Pothole) Calbourne
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Morton Road, Brading, Isle Of Wight
13 April — 14 April
Delays likely Traffic control (multi-way signals)
Works location: Jnc Morton Rd/New Rd/Sandown Rd
Works description: Replace 1 Existing Pole
Responsibility for works: BT
Current status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
13 April — 15 April
Delays likely Traffic control (two-way signals)
Works location: Newport: O/S No.128: Carisbrooke Road-Newport
Works description: Sawcut And Infill Idr – P/H’S X 2 .60 X .15 X 20mm Nearside .5 X 2 X 50mm .40 X .30 X 35mm P/H In Disintegrating Patch Patch Req’D 1.0 X 1.0 X 50/100mm Tm – Two Way Temp Lights (Cw: Pothole) Dyl’S Will Need Repainting On Completion Of Repair To P/H Please Close Down Further Works Required For Lining To Be Refreshed Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 Park Road, Cowes, Isle Of Wight
12 April — 04 June
Delays likely Road closure
Works location: Cowes: From Place Road 290m East Thereof (Ml 110046): Park Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1 (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 Park Road, Cowes, Isle Of Wight
12 April — 06 June
Delays likely Road closure
Works location: Cowes: 290m East Of Place Road To Reynolds Close (Ml 110047): Park Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H1 Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H1(Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Langbridge, Newchurch, Isle Of Wight
12 April — 12 June
Delays likely Road closure
Works location: Newchurch: From The Shute 200m North (Ml 430126): Langbridge-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Main Road, Alverstone, Isle Of Wight
12 April — 12 June
Delays likely Road closure
Works location: Alverstone: From Youngwoods Way 530m North (Ml430138): Main Road-Alverstone:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3) Alvers
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Car Park High Street Opp The Griffin, Godshill, Isle Of Wight
13 April — 13 June
Delays likely Road closure
Works location: Godshill: The Entire Car Park (Ml Cp074):
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cp-Stren:R/H4 Car Park Strengthening Overlay – 60mm Foambase, 25mm Ac10 Surface) (Kerbed=Inlay/Unkerbed=Overlay) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Chatfield Lodge, Newport, Isle Of Wight
12 April — 12 June
Delays likely Road closure
Works location: Newport: Ml 240304a Between No 4 And No 8: Chatfield Lodge-Newport
Works description: Carriageway Resurfacing Schemeinclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Church Road, Binstead, Isle Of Wight
13 April — 13 June
Delays likely Road closure
Works location: Binstead: From Binstead Hill To Quarr Road (Ml340502) : Church Road-Binstead:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Hollow, Newport, Isle Of Wight
13 April — 15 April
Delays possible Traffic control (two-way signals)
Works location: Newport: Appx 30m Past The Nat Speed Limit Sign On The Rookley Bound Side Of The C/Way: Blackwater Hollow-Newport
Works description: Idr – Edge Of C/Way Wheel Push With Several Areas Of Delam Patch Req’D 17m X .50 X 50/100mm Tm – Two Way Temp Lights (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Esplanade, Ryde, Isle Of Wight
12 April — 14 April
Delays possible Lane closure
Works location: Ryde: Exit From Ryde Bus Station Next To The Pedestrian Crossing: Esplanade-Ryde
Works description: Saw Cut Repair Wheel Push / Pothole 1m Diam X 50mm Depth X2. Further Investigatory Works Required As Discussed . Tm=Lane Closure (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3327 Clarence Road, Wroxall, Isle Of Wight
13 April — 15 April
Delays possible Traffic control (two-way signals)
Works location: Wroxall: From O/S Homelands Towards Wroxall Finishing At The Red Anti Skid By The Jnc To Mountfield Road: Clarence Road-
Works description: Idr – 18 X P/H’S Various Sizes – On Both Sides Of The C/Way Unable To Photograph Due To Nat Speed Limit Road Tm – Stop And Fill Mobile Works Using Stop & Go Boards (Cw: Pothole) Wroxall
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 High Street, Bembridge, Isle Of Wight
13 April — 13 April
Delays possible Traffic control (Stop/Go boards)
Works location: Bembridge: Ml 340154 From Mill Road Through To Woodlands Grove: High Street-Bembridge
Works description: Road Core Excavations Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Kings Road, Bembridge, Isle Of Wight
13 April — 13 April
Delays possible Traffic control (Stop/Go boards)
Works location: Bembridge: Ml 320125 From Church Road To Pump Lane: Kings Road-Bembridge
Works description: Road Core Excavations Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
13 April — 15 April
Delays possible Traffic control (two-way signals)
Works location: 466m East Of Junc Of Dodpits Lane On, Freshwater Road
Works description: Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Hillway Road, Bembridge, Isle Of Wight
13 April — 13 April
Delays possible Traffic control (Stop/Go boards)
Works location: Bembridge: Ml 341325 From Commonwood Lane Through To Sandown Road: Hillway Road-Bembridge
Works description: Road Core Excavations Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Staplers Road, Newport, Isle Of Wight
12 April — 28 April
Delays possible Lane closure
Works location: Jnc Staplers Road On, Staplers Road
Works description: Replace 5m2 Existing Manhole Roof
Responsibility for works: BT
Current status: Advanced planning

Briddlesford Road, Newport, Isle Of Wight
13 April — 15 April
Delays possible Traffic control (multi-way signals)
Works location: Newport: On The Mini Roundabout Briddlesford Road Side And Park Road Side: Briddlesford Road-Newport
Works description: Sawcut And Infill Idr – P/H’S X 8 4 X P/H ‘S On Park Road Side Patch Req’D To Incorporate All P/H’S Appx 3.0 X 1.5 X 50/100mm 4 X P/H’S On The Briddlesford Road Side 1.0 X 1.0 X 40mm .90 X .70 X 40mm .65 X .55 X 40mm .90 X .80 X 35mm Four Way Temp Lights (Cw: Pothole) H1 Rural Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ashey Road, Ryde, Isle Of Wight
13 April — 13 April
Delays possible Traffic control (Stop/Go boards)
Works location: Ryde: Three Cores Equidistant Between Leighwood Close To Upton Road (Ml320225): Ashey Road-Ryde
Works description: Three Road Core Excavations Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Wilver Road, Newport, Isle Of Wight
12 April — 14 April
Delays possible Traffic control (two-way signals)
Works location: Newport: S/B On The Bend O/S No 1 (Opp J/O Alderbury Rd).: Wilver Road-Newport
Works description: Carriageway Repairs, X1 Patch Req 3mx1.9m+1.7mx1.2m Tm Two Way Lights Req (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Avenue Road, Freshwater, Isle Of Wight
12 April — 21 April
Delays unlikely Traffic control (give & take)
Works location: Outside 1 Clarence Buildings
Works description: Lay New Service From Nearside Carriagway To Site
Responsibility for works: SGN
Current status: Advanced planning

A3055 Pier Street, Ventnor, Isle Of Wight
12 April — 02 May
Delays unlikely Some carriageway incursion
Works location: Number 19
Works description: Scaff. App. 19 High Street, Ventnor – 12/04 – 02/05
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Embankment Road, Bembridge, Isle Of Wight
12 April — 14 April
Delays unlikely Some carriageway incursion
Works location: Frm In F/W 43m North East Frm Rear Of 1 Redwing Quay To Across C/W To In F/W 43m North East Frm Opp Rear Of 1 Redwing Qu
Works description: Install 3m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Bannock Road, Whitwell, Isle Of Wight
13 April — 15 April
Delays unlikely No carriageway incursion
Works location: O/S No.17, Bannock Road
Works description: Perform 1 Excavation/S For Installation Activities1
Responsibility for works: BT
Current status: Advanced planning

Heathfield Road, Freshwater, Isle Of Wight
13 April — 18 April
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Heathfields Close To The Shielings, 230m, Ml 630213: Heathfield Road-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alverstone Road, Newchurch, Isle Of Wight
12 April — 14 April
Delays unlikely No carriageway incursion
Works location: O/S Panorama, Alverstone Road
Works description: Incremental Build – 7/7 Base Build And Shell Erection
Responsibility for works: BT
Current status: Advanced planning

Atherley Road, Shanklin, Isle Of Wight
13 April — 15 April
Delays unlikely Some carriageway incursion
Works location: 24 Atherley Road, Shanklin, Isle Of Wight.
Works description: – Install New Water Connections.
Responsibility for works: Southern Water
Current status: Advanced planning

Castle Street, Ryde, Isle Of Wight
12 April — 21 April
Delays unlikely Traffic control (give & take)
Works location: Opposite No 27
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Cliff Road, Totland, Isle Of Wight
12 April — 14 April
Delays unlikely Traffic control (give & take)
Works location: Totland: From Woodlands To Junction With York Lane, 220m, Ml 640348: Cliff Road-Totland
Works description: Footway Re-Construction And Surfacing (Fwr : Bit Partrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Fort Mews, Sandown, Isle Of Wight
12 April — 21 April
Delays unlikely Some carriageway incursion
Works location: Os 14
Works description: Lay New Service From Farside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Kinchington Road, Carisbrooke, Isle Of Wight
13 April — 14 April
Delays unlikely Traffic control (give & take)
Works location: Carisbrooke: From Wellington Road To Purdy Road (Ml 240162): Kinchington Road-Carisbrooke
Works description: Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Fullrecon) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Steephill Court Road, Ventnor, Isle Of Wight
13 April — 21 April
Delays unlikely Some carriageway incursion
Works location: Os 10
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Union Street, Newport, Isle Of Wight
13 April — 19 April
Delays unlikely Some carriageway incursion
Works location: O/S 5
Works description: Scaff. App. 5 Union Street, Newport – 13/04 – 19/04
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning