Road cones:

Isle of Wight roadworks and road closures 1st April 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Fairlee Road, Newport, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Newport: From 250m North Of Halberry Lane To Mews Lane (Ml 210051): Fairlee Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H/1(Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Newport: From Mews Lane 450m North Thereof (Ml 210052): Fairlee Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban-:H/1(Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Newport: 770m From Mews Lane To Mill Lane (Ml 210054): Fairlee Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H/1(Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Newport: From 450m North Of Mews Lane To 770m North Of Mews Lane (Ml 210053): Fairlee Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H/1(Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Racecourse, Newport, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Newport: Racecourse Roundabout, For Its Entire Length (Ml 210057): Racecourse-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1 Resurface 25mm Ul-M 65psv Plus Regulating Rural-:H/1(Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Racecourse, Newport, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Newport: From Mill Lane To 520m Northeast Thereof (Ml 210055): Racecourse-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1 Resurface 25mm Ul-M 65psv Plus Regulatingurban-:H/1(Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Racecourse, Newport, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Newport: 520 Northeast Of Mill Lane To Racecourse Roundabout (Ml 210056): Racecourse-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1 Resurface 25mm Ul-M 65psv Plus Regulating Rural-:H/1(Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Arnold Road, Binstead, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Binstead: From Chapel Road To Hawthorn Close (Ml340449): Arnold Road-Binstead:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 Park Road, Cowes, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Cowes: From Union Road To Victoria Road (Ml110050): Park Road-Cowes:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H1, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H1) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Beckford Road, Cowes, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Cowes: Ml 141312 Between The Junctions Of Westhill Road And Birmingham Road: Beckford Road-Cowes
Works description: Carriageway Reconstruction , Planing And Resurfacing. (Ff-Stren100:U/H4 F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban;H4) (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Cadets Walk, East Cowes, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: East Cowes: Ml 140244 From Vectis Road To A Point 177m West Thereof: Cadets Walk-East Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon20%:U/H4 20% Concrete Reconstruction And Seal Joints-Urban:H4) (Kerbed=Inlay/Unkerbed=Overlay) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Castle Street, Carisbrooke, Isle Of Wight
01 April — 01 June
Delays likely Road closure
Works location: Carisbrooke: From Carriisbrooke High Street 177m South(Ml240246): Castle Street-Carisbrooke:; Cw Cip Scheme Cw Cip Schem
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Carisb
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Lower Road, Brading, Isle Of Wight
01 April — 05 April
Delays likely Road closure
Works location: Brading: Just Past The Pinch Point Towards Alverstone: Lower Road-Brading
Works description: 28 Day Perm Required Sawcut And Infill Idr – P/H’S X 13 1 Is A Cat 1 With A 28 Day Follow Up – Andrew Aware .70 X .40 X 50mm Temp Repair Made By Dss – Rr On 10/03/16 Tm – For Follow Up Repair – Give & Take Plus 12 X Smaller P/H’S On A 28 Day Repair .30 X .30 X 30mm Patch Req’D To Cover P/H And A Small One Next To It 1.0 X .50 X 50mm .30 X .30 X 30mm .20 X .20 X 20mm .60 X .30 X 30mm .40 X .40 X 30mm .40 X .20 X 30mm .50 X .50 X 20mm .30 X .30 X 20mm .50 X .30 X 40mm .50
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Upper Road, Brading, Isle Of Wight
01 April — 05 April
Delays likely Road closure
Works location: Brading: Appx 200m Past Adgestone Vineyard Heading Towards Alverstone: Upper Road-Brading
Works description: Sawcut And Infill Idr – P/H .60 X .50 X 45mm Tm – Stop And Fill On Mobile Works On Give & Take (Cw: Pothole) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
01 April — 05 April
Delays unlikely Some carriageway incursion
Works location: Jcn The Avenue And O/S 9 And Opp 10 , Worsley Road
Works description: Locate And Excavate 1 Subsequent Blockage In Existing Duct,Locate And Excavate 2 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

Church Path, East Cowes, Isle Of Wight
01 April — 05 April
Delays unlikely No carriageway incursion
Works location: Opp 23 On, Church Path
Works description: Install 1m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Gordon Road, Cowes, Isle Of Wight
01 April — 05 April
Delays unlikely No carriageway incursion
Works location: Cowes: At The Junction Of St Marys Road & Gordon Road (Ml 140207):
Works description: Replacement Of N 1 Sign (1 X Give Way) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Cut, Cowes, Isle Of Wight
01 April — 05 April
Delays unlikely No carriageway incursion
Works location: Cowes: At The Junction Of The High Street & The Cut (Ml 141206):
Works description: Replacement Of N 2 Signs (1 X No Left Turn & 1 X Pedestrian Area) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Hills_Alive under CC BY 2.0