A3054 Bouldnor Road, Yarmouth, Shalfleet, Isle Of Wight
25 March — 09 April
Delays likely Traffic control (two-way signals)
Works location: (Pcp1) Bduk. Opposite Side Of Pine Cottage Crossing Carriageway To Side Of Pine Cottage On Bouldnor Road.
Works description: Install 2m Of 1 Way Poly Duct In Verge,Install 9m Of 1 Way Poly Duct In Carriageway,Provide 1 Cabinet And Base (Nga Cabinets).
Responsibility for works: BT
Current status: Advanced planning

A3056 Newport Road, Lake, Isle Of Wight
25 March — 02 May
Delays likely Road closure
Works location: Lake: From Sandown Road To Lamorbey Road (Ml 410087): Newport Road-Lake:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Blackgang Road, Niton, Isle Of Wight
24 March — 26 March
Delays possible Traffic control (Stop/Go boards)
Works location: 227m East Of Roundabout To Black Gang Chine Amusement Car Park, Blackgang Rd, Blackgang Road
Works description: Replace 1 Existing Pole
Responsibility for works: BT
Current status: Advanced planning

A3055 Blackgang Road, Niton, Isle Of Wight
24 March — 26 March
Delays possible Traffic control (Stop/Go boards)
Works location: 449098 076889 Blythe Shute Adj Cab 3 A/C Route Toblackgang Chine Amusement Park, Blackgang Road
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Advanced planning

A3055 High Street, Shanklin, Isle Of Wight
24 March — 26 March
Delays possible Some carriageway incursion
Works location: Paramount Fish Bar 74, High St, Shanklin, Po376nj
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
25 March — 27 March
Delays possible Some carriageway incursion
Works location: 11, High St, Newport, Po301ss
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3327 Newport Road, Ventnor, Isle Of Wight
24 March — 26 March
Delays possible Traffic control (two-way signals)
Works location: Newport Road From Clarence Road To Junction With Ocean View Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

Chequers Inn Road, Rookley, Isle Of Wight
24 March — 26 March
Delays possible Traffic control (multi-way signals)
Works location: F/W Cover Approx 139m West Of Bohemia Farm House , Chequers Inn Road
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

New Street, Newport, Isle Of Wight
24 March — 06 April
Delays possible Traffic control (multi-way signals)
Works location: Newport: From Chapel Street Car Park, North To Pyle Street (Ml 240168):
Works description: Install N? 2 Lanterns (N? 2 Columns) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
24 March — 25 March
Delays unlikely No carriageway incursion
Works location: Sd6yef58, Clear 2 Blockages In Soft Opp No 37/41 And Opp No 41, School Green Road
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

Ash Lane, Carisbrooke, Isle Of Wight
25 March — 27 March
Delays unlikely Some carriageway incursion
Works location: 3, Ash Lnae, Newport, Po305lt
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3399 Presford Shute, Shorwell, Isle Of Wight
24 March — 26 March
Delays unlikely No carriageway incursion
Works location: Opp To Adj Preston Farm, Presford Shute
Works description: Provide 1 New Pole,Replace 1 Existing Pole
Responsibility for works: BT
Current status: Advanced planning

B3401 Main Road, Newbridge, Isle Of Wight
25 March — 31 March
Delays unlikely Some carriageway incursion
Works location: Adjacent To Bank Farm Cottage
Works description: Sewer Connection By Dares. Temporary Traffic Lights
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
24 March — 26 March
Delays unlikely Some carriageway incursion
Works location: Northwood: From Rew Street To Three Gates Road (Ml 130053/54/55/56/57/58): Pallance Road-Northwood
Works description: Surfacing Preparatory Works, Replacing And Relaying Kerbs. Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Atherley Road, Shanklin, Isle Of Wight
24 March — 26 March
Delays unlikely Some carriageway incursion
Works location: 1, Atherley Road, Shanklin,Iow.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Victoria Road, Freshwater, Isle Of Wight
25 March — 02 April
Delays unlikely Traffic control (give & take)
Works location: Os Eventide
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Cross Lane, Newport, Isle Of Wight
25 March — 27 March
Delays unlikely Some carriageway incursion
Works location: 25 Cross Lane, Newport, Isle Of Wight.
Works description: – Install New Water Connections
Responsibility for works: Southern Water
Current status: Advanced planning

King Arthur Close, Ryde, Isle Of Wight
24 March — 06 April
Delays unlikely Traffic control (give & take)
Works location: Ryde: From Arthur Street, South To Dead End (Ml 340450):
Works description: Install N? 3 Lanterns (N? 3 Columns) 3 Warning Signs Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Leighwood Close, Ryde, Isle Of Wight
24 March — 06 April
Delays unlikely Traffic control (give & take)
Works location: Ryde: From Ashey Road, East To Dead End (Ml 343453):
Works description: Install N? 4 Lanterns (N? 4 Columns) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ryde Footpath 64, Seaview, Isle Of Wight
25 March — 27 March
Delays unlikely No carriageway incursion
Works location: Opp Sandscape, Ryde Footpath 64
Works description: Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

West Street, Ventnor, Isle Of Wight
24 March — 26 March
Delays unlikely Some carriageway incursion
Works location: 45, West St, Wroxall, Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning