Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3054 Binstead Road, Ryde, Isle Of Wight
15 July — 28 July
Delays likely Traffic control (give & take)
Works location: Ryde: From Cemetary Road, East To The Junction Of Queens Road, And Pellhurst Road (Ml 310018, 310019, 310020,310021, 310
Works description: Install No 32 Lanterns (No 17 Columns) 3 Direction/Route Signs, 6 Warning Signs, 1 No Waiting Sign, 1 Lit Vehicle Activation Sign, 1 Public Notice And 1 Advert Board Chained To Column Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Argyll Street, Ryde, Isle Of Wight
16 July — 29 July
Delays likely Traffic control (multi-way signals)
Works location: Ryde: From West Street, West To Pellhurst Road (Ml 310542 And Ml 310543): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 13 Lanterns (No 7 Columns) 2 Warning Signs Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 Carisbrooke Road, Newport, Isle Of Wight
15 July — 15 August
Delays likely Road closure
Works location: Newport: From Wellington Road To Trafalgar Road Ml210073: Carisbrooke Road-Newport:; Cw Cip Scheme Cw Cip Scheme
Works description: Surfacing Preparatory Works, Replacing And Relaying Kerbs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Whitcombe Road, Newport, Isle Of Wight
15 July — 31 August
Delays likely Road closure
Works location: Newport: From 500m North Of Sandy Lane A Further 500m North (Ml 230119): Whitcombe Road-Newport:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv, Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3 Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Whitcombe Road, Newport, Isle Of Wight
15 July — 31 August
Delays likely Road closure
Works location: Newport: From Froglands Lane 570m South (Ml 230120): Whitcombe Road-Newport:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv, And 85mm Foambase-Rural:H3 Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Binstead, Isle Of Wight
16 July — 11 August
Delays likely Road closure
Works location: Binstead: From Pitts Lane To Quarr Road (Ml340503): Church Road-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pellhurst Road, Ryde, Isle Of Wight
15 July — 28 July
Delays likely Traffic control (multi-way signals)
Works location: Ryde: From Binstead Road, South To Upton Road (Ml 330255, Ml 310542, Ml 33056 And Ml 330257: :; Sl Cip Scheme Sl Cip Sch
Works description: Install No 24 Lanterns (No 16 Columns) 3 Route/Direction Signs, 8 Warning Signs, 1 No Waiting Sign, 3 Neighbourhood Watch Signs, 2 Amber Flashing Signs And 2 Lit Vehicle Activated Signs Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Godshill, Isle Of Wight
16 July — 18 July
Delays possible Traffic control (two-way signals)
Works location: 77m Towards Rookley From Dubbers,Newport Road,Godshill,Iow.
Works description: – Replace Sewer M/H Frame & Cover In Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning
A3054 Queens Road, Ryde, Isle Of Wight
15 July — 28 July
Delays possible Traffic control (multi-way signals)
Works location: Ryde: From Binstead Road, East To Column 9 (Ml 310022): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 4 Lanterns (No Columns) 1 Route/Direction Sign, 1 Warning Sign And 2 Bus Stops Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 High Street, Brading, Isle Of Wight
16 July — 18 July
Delays possible Some carriageway incursion
Works location: 8 High Street
Works description: Perm Reinstatement Of F/Way
Responsibility for works: Southern Water
Current status: Advanced planning
A3055 Sandown Road, Lake, Isle Of Wight
16 July — 18 July
Delays possible Some carriageway incursion
Works location: 35 Sandown Rd
Works description: Perm Reinstatement Of F/Way
Responsibility for works: Southern Water
Current status: Advanced planning
B3323 Pyle Street, Newport, Isle Of Wight
16 July — 22 July
Delays possible Some carriageway incursion
Works location: O/S 68
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3325 Nodes Road, Northwood, Isle Of Wight
16 July — 18 July
Delays possible Traffic control (two-way signals)
Works location: 66 Nodes Road , Cowes, Isle Of Wight.
Works description: Install New Water Service Connection
Responsibility for works: Southern Water
Current status: Advanced planning
Long Lane, Newport, Isle Of Wight
16 July — 29 July
Delays possible Traffic control (two-way signals)
Works location: Newport: From Staplers Road, South East To Junction Of Buckbury Lane (Ml 240209 And Ml 240107): :; Sl Cip Scheme Sl Cip
Works description: Install No 15 Lanterns (No 12 Columns And 2 Pb’S) 3 Bus Stops, 1 Warning Sign And 1 Lit Vehicle Activation Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Elm Lane, Calbourne, Isle Of Wight
15 July — 17 July
Delays possible Traffic control (two-way signals)
Works location: Elm Lane Jnc B3401 , Calbourne, Isle Of Wight Elm Lane, Jnc A3054, Shalfleet Iow, Elm Lane
Works description: Install 8x 100m Of Fibre Cable And Sub-Duct Into Duct
Responsibility for works: BT
Current status: Advanced planning
Image: © With kind permission of Allan Marsh