Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
B3330 St Johns Road, Ryde, Isle Of Wight
20 August — 21 August
Delays likely Traffic control (multi-way signals)
Works location: Ryde: O/S No. 19: St Johns Road-Ryde:; Ops Hub
Works description: Reset Rocking, Noisy Gully Frame And Cover. Tm=3 Way Temp Lights. Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Bedbury Lane, Freshwater, Isle Of Wight
19 August — 19 September
Delays likely Road closure
Works location: Freshwater: From Queens Road 300m East Thereof (Ml630206): Bedbury Lane-Freshwater:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Car Park Church Place, Chale, Isle Of Wight
20 August — 20 September
Delays likely Road closure
Works location: Chale: Church Place Chale Car Park (Cp015): Car Park Church Place-Chale:; Eric Longworth
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Resu:R/H4, Car Park – Strengthening Overlay – 60mm Foambase, 25mm Ac10 Surface) Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Car Park Wheelers Bay, Ventnor, Isle Of Wight
20 August — 20 September
Delays likely Road closure
Works location: Ventnor: Wheelers Bay Car Park Ventnor (Cp063): Wheelers Bay Road-Ventnor:; Eric Longworth
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Stren:U/H4, Car Park – Strengthening Inlay – 60mm Foambase, 25mm Ac6 Surface) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Cypress Road, Newport, Isle Of Wight
20 August — 14 September
Delays likely Road closure
Works location: Newport: From St Johns Road To Medina Avenue (Ml240309): Cypress Road-Newport:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H4) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning