The weekly list of roadworks has not been received from Island Roads yet, so here are the roadworks and road closures expected to start today or tomorrow.
A3020 Blackwater Road, Newport, Isle Of Wight
02 June — 02 June
Delays likely Traffic control (two-way signals)
Works location: Outside Moorfield On Blackwater Road Newport Isle Of Wight Po30 3bd
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes – Highway Will Be Unaffected. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning
A3021 York Avenue, East Cowes, Isle Of Wight
03 June — 16 June
Delays likely Traffic control (two-way signals)
Works location: East Cowes: From Junction Of Kent Avenue, North To Junction Of Well Road (Ml110021, 110022,110023): :; Sl Cip Scheme Sl
Works description: Install No 23 No Lanterns (20 No 8m Columns) 4 Bus Stops, 2 Parking Restriction Signs, 13 Warning Signs, 2 Lit Vehicle Activation Signs And 1 Communication/Aerial Equipment East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Lake Hill, Lake, Isle Of Wight
02 June — 30 May
Delays likely Road closure
Works location: Lake: From Sandown Road To Ranelagh Road (Ml410044): Lake Hill-Lake:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon225:U/H2, Reconstruction 25mm Ul-M 65psv, 75mm Hdm Binder, 125mm Foambase-Urban:H2) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Lake Hill, Lake, Isle Of Wight
02 June — 03 June
Delays likely Traffic control (two-way signals)
Works location: Lake: Carriageway – Foot Of Wall: Lake Hill—Lake Hill-Lake:; David Edmead
Works description: Vegetation/Traffic Detritus To Be Removed Over 3m Length At East End.(Structures Gang 0.5 Day) (Structures Defect (To Assess)) – 2 Blocks In The Top Course Have Been Displaced At The East End And General Erosion Of Top Course Blocks. Works Required : Rebed 2 Displaced Blocks (Structures Gang 0.5 Day + Tm?) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Newport Road, Freshwater, Isle Of Wight
03 June — 04 June
Delays likely Road closure
Works location: Freshwater: Newport Road, Freshwater , Between Afton Farm And Wilmingham Lane On The East Bound Carriageway .: Newport R
Works description: Edge Of C/W Patch Required 3m X .5m Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pellhurst Road, Ryde, Isle Of Wight
03 June — 03 June
Delays likely Traffic control (multi-way signals)
Works location: Outside 26,28a Pellhurst Road Opposite Junction With Argyll Street.Ryde. Isle Of Wight. Po33 3bw
Works description: Replacement Of Poledepth Of Pole Will Be Approximately 1.6 Metres
Responsibility for works: BT
Current status: Advanced planning
A3054 Queens Road, Ryde, Isle Of Wight
03 June — 03 June
Delays possible Traffic control (two-way signals)
Works location: Junction Of Queens Road And Pellhurst Road.Ryde.Isle Of Wight.Po33 3na
Works description: This Setup As Directed By Mark Williams 01983 828581.Being Provided In Conjunction With The Traffic Management At Pellhurst Road Junction With Argyll Street.Ryde.Isle Of Wight.Po33 3bw
Responsibility for works: BT
Current status: Advanced planning
A3055 Marlborough Road, Ryde, Isle Of Wight
02 June — 31 March 2015
Delays possible
Works location: Full Scope To Follow When Know Or The 3 Month Application Is Submitted
Works description: For Your Awareness This Notice Is To Confirm That As Part Of Sgn’S Mains Replacement Programme We Have Identified Pipes Within This Street That Will Require Replacement During He 14/15 Financial Year (1 April 2014 To 31 March 2015)
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning (from streetworks register)
Pallance Road, Northwood, Isle Of Wight
02 June — 04 June
Delays possible Traffic control (two-way signals)
Works location: Aprox 40 And 70 Meters From Pallance Land On Pallance Road, Pallance Road
Works description: Locate And Excavate 3 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning