Harding Shute, Ryde
29 January — 02 February
Delays likely due to Streetworks
Road closure at Harding Shute, Brading, Isle of Wight (Harding Shute, Ryde) 29 January — 02 February
Diversion route at Isle of Wight, Isle of Wight (Harding Shute, Ryde) 29 January — 02 February
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

C46 Spring Hill, Ventnor, Isle of Wight
29 January — 29 January
Delays likely due to Streetworks
Road closure at C46 Spring Hill, Ventnor, Isle of Wight (Spring Hill, Ventnor) 29 January — 29 January
Diversion route at C46 Spring Hill, Ventnor, Isle of Wight (Spring Hill, Ventnor) 29 January — 29 January
Diversion route at A3055 High Street, Ventnor, Isle of Wight (Spring Hill, Ventnor) 29 January — 29 January
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

A3054 Fairlee Road, Newport, Isle Of Wight
29 January — 29 January Traffic control (two-way signals)
Delays likely due to Streetworks
Access Required To Underground Bt Structure To Restore Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant at Opp North Fairlee Farm Fairlee Road Newport Po30 2ju
Responsibility: BT
EToN status: Advanced planning

Spring Hill, Ventnor, Isle Of Wight
29 January — 02 February Road closure
Delays likely due to Streetworks
Sawcut And Infill Idr – C/Way Surface Breaking Up Patching Req’D 3.1 X .65 X 100/150mm 2.4 X 1.1 X 100/150mm 1.1 X .95 X 100/150mm Close Further Works Required To Reinstate Dyl’S As Req’D Tm – Road Closure (Cw: Pothole) H3 Urban Ventnor at Ventnor: O/S No.23: Spring Hill-Ventnor
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Harding Shute, Brading, Isle Of Wight
29 January — 02 February Road closure
Delays likely due to Streetworks
28 Day Perm Saw Cut And Infill 4 X C/W Potholes Edge Of Cw. 2 M X .600 X 75 Mm .900 X .600 X 75 Mm .700 X .500 X 50 Mm .900 X .500 X 50 Mm Tm- Ds Advices Road Closure Or Long Delay Boards Required. (Cw: Pothole) H4 Rural Brading at Brading: Approx 400 Meters Past The Bridge Heading Towards Ashey.Edge Of C/W: Harding Shute-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Main Road, Rookley, Isle Of Wight
28 January — 02 February Traffic control (two-way signals)
Delays possible due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit 50% Partrecon) Rookley at Rookley: From Junction With Niton Road To Entrance To Industrial Estate, 370m Ml 510022: Main Road-Rookley
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
28 January — 30 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Arreton at Arreton: From Lime Kiln Shute To Knighton Shute (Ml 410117): Mersley Downs Road-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
28 January — 30 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Arreton at Arreton: Ml 410114 From The Junction Of Newport Shute To A Point 541 Metres East: Mersley Downs Road-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
28 January — 30 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Arreton at Arreton: From 540m East Of Newport Shute A Further 500m East (Ml 410115): Mersley Downs Road-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
28 January — 30 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Arreton at Arreton: From Knighton Shute To Brading Down Road (Ml 410118): Mersley Downs Road-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
28 January — 30 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Arreton at Arreton: From 1040m East Of Newport Shute To Lime Kiln Shute (Ml 410116): Mersley Downs Road-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
29 January — 02 February Traffic control (Stop/Go boards)
Delays possible due to Streetworks
1 ,Build 1 Precast Chamber In 915mm X 445mm X 965mm Deep In Footway,Install 2m Of 1 Way Poly Duct In Footway,Install 3m Of 1 Way Poly Duct In Verge,Install 7m Of 1 Way Poly Duct In Carriageway at O/S 17 Across C/W To Opp 17, Worsley Road
Responsibility: BT
EToN status: Advanced planning

A3055 Military Road, Brighstone, Isle Of Wight
28 January — 01 February No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Precast Jointing Chamber(S) (350mm X 200mm) 300mm at Opp Brightstone Footpath On, Military Road
Responsibility: BT
EToN status: Advanced planning

Albert Road, Gurnard, Isle Of Wight
29 January — 02 February Some carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at , Jnc Wtih Worsley Rd In , Albert Road
Responsibility: BT
EToN status: Advanced planning

Marsh Road, Gurnard, Isle Of Wight
29 January — 02 February No carriageway incursion
Delays unlikely due to Streetworks
Install 1m Of 1 Way Poly Duct In Footway,Install 2m Of 1 Way Poly Duct In Carriageway at Tyr378, S58 Permissions Given By Mark William – Os 34, Marsh Road
Responsibility: BT
EToN status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
29 January — 02 February Some carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at O/S 41/43 , Worsley Road
Responsibility: BT
EToN status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
29 January — 02 February Some carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Subsequent Blockage In Existing Duct,Locate And Excavate 2 Blockage In Existing Duct at Jcn The Avenue And O/S 9 And Opp 10 , Worsley Road
Responsibility: BT
EToN status: Advanced planning

Esplanade, Shanklin, Isle Of Wight
28 January — 10 February Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway For Increased Electrical Connection To No. 19. Backfill And Reinstate. at From O/S 17 To O/S 20
Responsibility: Southern Electric
EToN status: Advanced planning

Gotten Lane, Chale, Isle Of Wight
28 January — 01 February No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole at Gotten Lane, 140m East Of Little Bramstone Farm, Gotten Lane
Responsibility: BT
EToN status: Advanced planning

Luccombe Road, Shanklin, Isle Of Wight
28 January — 01 February No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S) at Adj To Bourne Hall Country Hotel On, Luccombe Road
Responsibility: BT
EToN status: Advanced planning

Lugley Street, Newport, Isle Of Wight
29 January — 02 February Some carriageway incursion
Delays unlikely due to Streetworks
Interim To Perm Reinstatement at 99, High St, Newport
Responsibility: Southern Water
EToN status: Advanced planning

Maxted Close, Cowes, Isle Of Wight
28 January — 01 February Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit 50% Partrecon) Cowes at Cowes: Whole Length Of Close, 158m Ml 140184: Maxted Close-Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

South Street, Ryde, Isle Of Wight
28 January — 17 February Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold Application: 28/01/16-17/02/16 at 4 South Street
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Ward Close, Carisbrooke, Isle Of Wight
28 January — 01 February Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Fullrecon ) Carisbrooke at Carisbrooke: From Junction With Westmill Road, Whole Length Of Road, 69m, Ml 240156: Ward Close-Carisbrooke
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning