Road closed sign

Isle of Wight roadworks and road closures 23rd October 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Whiteley Bank, Ventnor, Isle of Wight
23 October — 23 October
Delays likely due to Obstruction
Two-way traffic signals at A3020 Whiteley Bank, Ventnor, Isle of Wight (Godshill Road, Shanklin) 23 October — 23 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

A3020 Medina Way, Newport, Isle Of Wight
23 October — 05 November Traffic control (give & take)
Delays likely due to Streetworks
Replacement Of N? 31 Signs (2 X Clearway, 2 X Cyclists On Roundabout, 4 X Derestriction, 1 X Junction Ahead, 2 X No Entry, 9 X Speed Restriction, 2 X Traffic Lights Ahead, 8 X Turn Left & 1 X Turn Right Sign) Newport at Newport: From Coppins Bridge Roundabout, North To St Marys Hospital (Ml 210015, Ml 210014, Ml 210013, Ml 210012, Ml 2100
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
23 October — 05 November Traffic control (give & take)
Delays likely due to Streetworks
Excavation Of Joint Bay In Footway And Cable Trench To New Supplies To New Property Adj 27 Salisbury Road. at S/O 27 To 30 Salisbury Roiad
Responsibility: Southern Electric
EToN status: Advanced planning

B3330/A3055 Appley Road, Ryde, Isle Of Wight
24 October — 28 October Traffic control (multi-way signals)
Delays likely due to Streetworks
Surfacing Preparatory Works – Replacing And Relaying Kerbs Ryde at Ryde: From Marlborough Road To Alexandra Road (Ml310055) : Appley Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3399 Limerstone Road, Brighstone, Isle Of Wight
23 October — 29 October Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Brighstone – 318980 – Bduk – Lay Approx 5m Of Duct 54 In Cw And 3m Of Soft To Link Existing Bt Boxes To Facilitate Spine Cabling Works. (Could Also Required To Build A New Joint Box Jf6) at From In The Carriageway At The Junction Of Brighstone Footpath 90 To Opposite The Junction Of Brighstone Footpath 90 On
Responsibility: BT
EToN status: Advanced planning

Staplers Road, Newport, Isle Of Wight
23 October — 23 October Traffic control (two-way signals)
Delays possible due to Streetworks
Access Required To Underground Bt Structure To Restore Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant at Os 18 Staplers Rd Isle Of Wight Po30 2rd
Responsibility: BT
EToN status: Advanced planning

A3056 Arreton Street, Arreton, Isle Of Wight
23 October — 27 October No carriageway incursion
Delays unlikely due to Streetworks
Install 1m Of 1 Way Poly Duct In Verge at In Verge Os Beresford, Arreton Street
Responsibility: BT
EToN status: Advanced planning

B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
23 October — 27 October No carriageway incursion
Delays unlikely due to Streetworks
Interim To Perm Works at S58 Only Affects C/W. Jnc Of Brook Road On , Freshwater Road
Responsibility: BT
EToN status: Advanced planning

Salisbury Road, Ryde, Isle Of Wight
23 October — 05 November Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway And Cable Trench To New Supplies To New Property Adj 27 Salisbury Road. at From Junc Of Marlborough Rd To O/S 27 Salisbury Road
Responsibility: Southern Electric
EToN status: Advanced planning

St Margarets Glade, Ventnor, Isle Of Wight
23 October — 27 October No carriageway incursion
Delays unlikely due to Streetworks
Provide 1 Core Drill(S) Into Jointbox Or Building at R/O 17, St Margarets Glade
Responsibility: BT
EToN status: Advanced planning