roadworks on the Isle of Wight

Isle of Wight roadworks and road closures 15th November 2016

Isle of Wight roadworks or road closures starting today or tomorrow.

Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.

Streetworks / Licence, Streetworks
Carriageway reconstruction, planing and resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Castle Lane
Location: at Newport Footpath 192, Newport, Isle of Wight (Castle Lane)
16 November — 17 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Streetworks / Licence, Streetworks
REPLACE MANHOLE FRAME AND COVER IN THE CARRIAGEWAY
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Diversion route
Name: Diversion
Location: at A3055 Church Road, Shanklin, Isle of Wight (Diversion)
15 November — 17 November
Road closure
Name: Church Road
Location: at A3055 Church Road, Shanklin, Isle of Wight (Church Road)
15 November — 17 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Quartering and hedge cutting
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Sandy Lane
Location: at Sandy Lane, Newport, Isle of Wight (Sandy Lane)
16 November — 17 November
Diversion route
Name: Diversion A
Location: at Sandy Lane, Newport, Isle of Wight (Diversion A)
16 November — 17 November
Diversion route
Name: Diversion B
Location: at Sandy Lane, Newport, Isle of Wight (Diversion B)
16 November — 17 November
Diversion route
Name: Diversion C
Location: at Sandy Lane, Newport, Isle of Wight (Diversion C)
16 November — 17 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Streetworks / Licence, Streetworks
Vehicle crossing construction by Dial-A -Rod Engineering Services
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Footway closure
Name: Rogerson Close, Cowes
Location: at Rogerson Close, Cowes, Isle of Wight (Rogerson Close, Cowes)
15 November — 18 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Church Road, Shanklin, Isle Of Wight
15 November — 17 November
Delays likely Road closure
Works location: Outside 11 Church Road, Shanklin, Po37 6nu
Works description: Replace Manhole Frame And Cover In The Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning

Sandy Lane, Newport, Isle Of Wight
16 November — 17 November
Delays likely Road closure
Works location: Newport: Whole Length Of Lane, Mls 240299, 240300/1/3: Sandy Lane-Newport
Works description: Quartering And Hedge Cutting 2.5m As Required For 800m Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Spring Lane, Carisbrooke, Isle Of Wight
16 November — 25 November
Delays likely Road closure
Works location: Carisbrooke: Whole Length Of Road From Junction With Castle Hill, 180m, Ml 240257: Spring Lane-Carisbrooke
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. (Ff-Stren100:U/H4 F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4 Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Newport, Isle Of Wight
15 November — 12 December
Delays possible Some carriageway incursion
Works location: O/S Hose Rhodes Dickson,138 High Street, Newport
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Horsebridge Hill, Newport, Isle Of Wight
16 November — 24 November
Delays possible Some carriageway incursion
Works location: Os 83
Works description: Lay New Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Baring Road, Cowes, Isle Of Wight
15 November — 28 November
Delays unlikely Some carriageway incursion
Works location: The Studio Trinity, Church Lane, Cowes , Iow.
Works description: Install New Water Service Connection,
Responsibility for works: Southern Water
Current status: Advanced planning

Bullen Road, Nettlestone, Isle Of Wight
15 November — 17 November
Delays unlikely Some carriageway incursion
Works location: The Yard,Bullen Road,Ryde
Works description: Water Main Connection To New Site. Work Is Within Sgn Site
Responsibility for works: Southern Water
Current status: Advanced planning

Court Road, Totland, Isle Of Wight
15 November — 28 November
Delays unlikely Traffic control (give & take)
Works location: Totland: From Junction With Summers Lane, 250m North, Ml 640354: Court Road-Totland
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Daniel Street, Ryde, Isle Of Wight
16 November — 22 November
Delays unlikely Some carriageway incursion
Works location: O/S 5 Daniel Street, Ryde
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Yarmouth, Isle Of Wight
15 November — 23 November
Delays unlikely Some carriageway incursion
Works location: Os Florins
Works description: Disconnect Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Pier Road, Seaview, Isle Of Wight
15 November — 28 November
Delays unlikely Some carriageway incursion
Works location: O/S Sancove Opposite Lampost
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Shorwell Bridleway 24, Shorwell, Isle Of Wight
15 November — 17 November
Delays unlikely No carriageway incursion
Works location: 330m West From Junc Of Atherfield Road , Shorwell Bridleway 24
Works description: Install 3m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Summers Court, Totland, Isle Of Wight
15 November — 28 November
Delays unlikely Traffic control (give & take)
Works location: Totland: From Junction With Summers Lane, 250m North, Ml 640354: Summers Court-Totland
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Fullrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning