Road closed road works shanklin

Roadworks and road closures: 25th March

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Bouldnor Road, Yarmouth, Shalfleet, Isle Of Wight
25 March — 09 April
Delays likely Traffic control (two-way signals)
Works location: (Pcp1) Bduk. Opposite Side Of Pine Cottage Crossing Carriageway To Side Of Pine Cottage On Bouldnor Road.
Works description: Install 2m Of 1 Way Poly Duct In Verge,Install 9m Of 1 Way Poly Duct In Carriageway,Provide 1 Cabinet And Base (Nga Cabinets).
Responsibility for works: BT
Current status: Advanced planning

A3056 Newport Road, Lake, Isle Of Wight
25 March — 02 May
Delays likely Road closure
Works location: Lake: From Sandown Road To Lamorbey Road (Ml 410087): Newport Road-Lake:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Sandown Road, Arreton, Isle Of Wight
26 March — 26 March
Delays likely Traffic control (two-way signals)
Works location: Arreton: N/W C/W Opp New Barn Retail Estate – Marked With A Cone On The Verge: Sandown Road-Arreton
Works description: Idr – Carriageway, Ironwork Repairs. Gully Broken Out 0.7mx0,2mx100mm – Temp Repair Has Been Made With Viafix, Gully Needs To Be Rebeded And Emptied Of Mud. Tm Two Way Lights Req Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Hollow, Newport, Isle Of Wight
26 March — 27 March
Delays possible Traffic control (two-way signals)
Works location: Newport: Outside Pidford Manor: Blackwater Hollow-Newport – 7116
Works description: Empty Gulley And Jet Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
25 March — 27 March
Delays possible Some carriageway incursion
Works location: 11 High St Newport Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
26 March — 30 March
Delays possible Some carriageway incursion
Works location: 114-116 High St Newport Isle Of Wight
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
25 March — 31 March
Delays unlikely Some carriageway incursion
Works location: O/S 10
Works description: Scaffold (1st Choice Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 66 High St Ventnor Isle Of Wight Iw
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Ash Lane, Carisbrooke, Isle Of Wight
25 March — 27 March
Delays unlikely Some carriageway incursion
Works location: 3 Ash Lane Newport Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3325 Carvel Lane, Cowes, Isle Of Wight
26 March — 08 April
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Carvel Lane, West, Then North To Terminus Road (Ml 110051, Ml 110052 & Ml 142206):
Works description: Install N? 3 Lanterns (N? 3 Columns) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 Place Road, Cowes, Isle Of Wight
26 March — 10 April
Delays unlikely Traffic control (give & take)
Works location: Cowes: Link Footway From Three Gates Road 150mtrs Along Place Road (Ml F10221): Place Road-Cowes
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330 Eddington Road, Seaview, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 24 Eddington Rd Seaview Isle Of Wight
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3330 Pondwell Hill, Nettlestone, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: Walden House Pondwell Hill Ryde Isle O
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3401 Main Road, Newbridge, Isle Of Wight
25 March — 31 March
Delays unlikely Some carriageway incursion
Works location: Adjacent To Bank Farm Cottage
Works description: Sewer Connection By Dares. Temporary Traffic Lights
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bay Road, Freshwater, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: O/S Bella Vista , Bay Road
Works description: Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway
Responsibility for works: BT
Current status: Advanced planning

Birmingham Road, Cowes, Isle Of Wight
26 March — 08 April
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Medina Road, North To Shooters Hill (Ml 110009 & Ml 140010):
Works description: Install N? 7 Lanterns (N? 7 Columns) 1 Cctv Sign, 5 Route/Direction Signs, 3 Parking Restriction Signs, 2 Warning Signs, 1 Lit Warning Sign, 1 Cctv Camera & 6 Festrive Decorations Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Victoria Road, Freshwater, Isle Of Wight
25 March — 02 April
Delays unlikely Traffic control (give & take)
Works location: Os Eventide
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Staplers Road, Newport, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: St. Pauls Vicarage Staplers Rd Newport
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Ward Avenue, Cowes, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 4 Ward Ave Cowes Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Church Path, East Cowes, Isle Of Wight
26 March — 30 March
Delays unlikely Traffic control (give & take)
Works location: Opp 146
Works description: Excavate Connection Hole And Trench To Lay And Connect New Gas Main To Supply Development Site Approx 2m F/W
Responsibility for works: Southern Electric
Current status: Advanced planning

Cotton Close, Cowes, Isle Of Wight
26 March — 08 April
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Seaview Road, North To Dead End (Ml 140183):
Works description: Install N? 2 Lanterns (N? 1 Column) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Cranleigh Gardens, Northwood, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 11 Cranleigh Gdns Cowes Isle Of Wight
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Cross Lane, Newport, Isle Of Wight
25 March — 27 March
Delays unlikely Some carriageway incursion
Works location: 25 Cross Lane, Newport, Isle Of Wight.
Works description: – Install New Water Connections
Responsibility for works: Southern Water
Current status: Advanced planning

Denness Road, Lake, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 50 Denness Rd Sandown Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Ensign Close, Cowes, Isle Of Wight
26 March — 08 April
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Seaview Road, North To Dead End (Ml 140183):
Works description: Install N? 3 Lanterns (N? 3 Columns) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Grenville Drive, Ryde, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 63 Upton Rd Ryde Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Kingates Lane, Niton, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: In Soft And C/W 162m East Of Junc Of Newport Road On, Kingates Lane
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Install 2m Of 1 Way Poly Duct In Verge,Install 6m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Mountfield Road, Wroxall, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 25a Mountfield Rd Wroxall Ventnor Isle
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Pelham Road, Cowes, Isle Of Wight
25 March — 01 April
Delays unlikely Some carriageway incursion
Works location: Os 128
Works description: Remedial Works To Be Carried Out
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Pier Street, Sandown, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 10 Pier St Sandown Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Prince Street, Ryde, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 39 Prince St Ryde Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Riboleau Street, Ryde, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 29 Riboleau St Ryde Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Ryde Footpath 64, Seaview, Isle Of Wight
25 March — 27 March
Delays unlikely No carriageway incursion
Works location: Opp Sandscape, Ryde Footpath 64
Works description: Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

The Fairway, Lake, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 5 The Fairway Sandown Isle Of Wight Iw
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Trinity Street, Ryde, Isle Of Wight
26 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 14 Wood St Ryde Isle Of Wight Iw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Worsley Road, Yarmouth, Isle Of Wight
26 March — 30 March
Delays unlikely Traffic control (give & take)
Works location: Yarmouth: Second Right Hand Spur Along Graeme Road (Ml 642357b): Worsley Road-Yarmouth
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Yarmouth
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning