Road cones:

Roadworks and road closures: 1st April 2014

See our weekly list of all roadworks taking place this week.

Long term closures (non flooding):

Cliff Path, Lake – closed to vehicles due to safety reasons
Cliff Path, Lake – closed to pedestrians from Winchester house car park to Skew Bridge path / Lake Cliff Gardens due to safety reasons
Cliff Path, Shanklin – closed to pedestrians between Delphi Road and St Boniface Cliff Road due to safety reasons
Hill Place Lane – closed to vehicles due to safety reasons
Knighton Lane & Knighton Shute, Newchurch – closed due to a poor surface (these roads will remain closed until the area dries out as the proposed surface treatment cannot be applied while the roads are wet)
Rew Lane, Ventnor – closed due to a poor surface
Undercliff Drive, Niton – between Mirables (in the west) and Seven Sisters Road (in the east) – closed for safety reasons

Roadworks or road closures starting today or tomorrow.

B3323 St James Street, Newport, Isle Of Wight
01 April — 14 April
Delays likely Lane closure
Works location: From O/S 13 – O/S 18
Works description: Excavation Of Joint Hole For Installation Of A New Electrical Service To New Wetherspoons Pub At Site Of Old Newport Congregational Church Backfill And Reinstate
Responsibility for works: Southern Electric

B3329/A3055 Avenue Road, Sandown, Isle Of Wight
01 April — 02 April
Delays likely Road closure
Works location: Bridge (Rail Over Road) – No: Ew1/32
Works description: Detailed Examination Of Rail Over Road Bridge. Between The Hours 22.00 – 06.00hrs
Responsibility for works: Network Rail Infrastructure Ltd

B3401 High Street, Carisbrooke, Isle Of Wight
01 April — 03 April
Delays possible Traffic control (two-way signals)
Works location: Noahs Ark, Carisbrooke High Street, Newport,Iow.
Works description: – Install New Water Connection
Responsibility for works: Southern Water

Image: Hills_Alive under CC BY 2.0