A3055 Morton Road, Brading, Isle Of Wight
27 May — 29 May Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway at Section 81/Cch Ref 1629466,- Renew C/W Cover O/S Southfields , Morton Road
Responsibility: BT
EToN status: Advanced planning

B3401 Shide Road, Newport, Isle Of Wight
27 May — 29 May Road closure
Delays likely due to Streetworks
Carriageway Repairs, Rebed Manhole Cover And Frame Due To Failed Carriageway Surround Tm Two Way Lights Req Newport at Newport: E/B O/S 40 Between J/O Queens Rd & College Rd: Shide Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Cowes at Cowes: From Brambles Lane To Pine Tree Close (Ml130099) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Cowes at Cowes: From Pine Tree Close To Egypt Hill (Ml130100) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:U/H3, Reconstruction 25mm Ul-M 65psv And 135mm Foambase-Urban:H3) Cowes at Cowes: From Egypt Hill To 200m East Thereof (Ml130101) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) Cowes at Cowes: From Brambles Lane To Woodvale Road (Ml130098) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Baring Road, Cowes, Isle Of Wight
27 May — 03 July Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H3, Resurface 25mm Ul-M 65psv Channel Plane-Urban: H3) Cowes at Cowes: From 200m East Of Egypt Hill To Ward Avenue (Ml130102) : Baring Road-Cowes:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Elenors Grove, Binstead, Isle Of Wight
27 May — 29 May Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at In C/W Os The Finches , Elenors Grove
Responsibility: BT
EToN status: Advanced planning

Appleford Road, Chale, Isle Of Wight
28 May — 01 June Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway,Replace 3 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway at 157m East, At The Jnc, 82m West, 251m West Of Jnc Appleford Lane On, Appleford Road
Responsibility: BT
EToN status: Advanced planning

A3054/B3330 High Street, Ryde, Isle Of Wight
27 May — 29 May No carriageway incursion
Delays unlikely due to Streetworks
Install 7m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at O/S 15/17, High Street
Responsibility: BT
EToN status: Advanced planning

A3054/B3330 High Street, Ryde, Isle Of Wight
28 May — 10 June Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 42098 at Os 177a
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

A3054 Elenors Grove, Binstead, Isle Of Wight
27 May — 09 June No carriageway incursion
Delays unlikely due to Streetworks
Excavation Of Joint Bay & Cable Trench In Footway To Provide New Electrical Supply To Site Adj Elenors at From O/S Elenors To Point 50m To The West
Responsibility: Southern Electric
EToN status: Advanced planning

A3055 Albert Street, Ventnor, Isle Of Wight
27 May — 09 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 9 Lanterns (N? 8 Columns) 2 Bus Stops, 1 No Waiting Sign, 1 Route/Direction Sign & 1 Parking Restriction Sign (Ml 530058) Ventnor at Ventnor: From Victoria Street, West To Pier Street (Ml 530058):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3320 Arctic Road, Cowes, Isle Of Wight
27 May — 09 June Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay & Cable Trench In Footway To Provide New Electrical Supply To 225 Arctic Road at From O/S 222 To O/S 231 Arctic Road
Responsibility: Southern Electric
EToN status: Advanced planning

Bath Road, Ventnor, Isle Of Wight
27 May — 09 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 4 Lanterns (N? 4 Columns) Ventnor at Ventnor: From Esplanade, North To Belgrave Road (Ml 540173):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Queens Road, Freshwater, Isle Of Wight
28 May — 01 June No carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at 10m South Of Jnc Lime Tree Court On, Queens Road
Responsibility: BT
EToN status: Advanced planning

Egypt Esplanade, Cowes, Isle Of Wight
27 May — 29 May No carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct at Both Blockages F/W O/S 1 To 6 Hawkins, Egypt Esplanade
Responsibility: BT
EToN status: Advanced planning

Leed Street, Sandown, Isle Of Wight
27 May — 29 May No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Driveway at Os Telephone Exchange, Leed Street
Responsibility: BT
EToN status: Advanced planning