"It's not about now or tomorrow, or next week - it's about the long term future and that will be Future Coast", the man now responsible for the land tells OnTheWight.
29 roads removed and two routes added (because of St Mary's roadworks), but Cllr Ward says, “Please take extra care when driving in dangerous conditions, especially if the roads are icy or frosty, or if it’s snowing"
Island Roads say the challenge of the scheme has been to devise an engineering solution that prolongs the life of this important section of the Island’s infrastructure, but does so in a way that respects the unique environmental and geological characteristics of the site