Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
It covers work carried out by BT, utility companies and Island roads.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3020 Newport Road, Cowes, Isle Of Wight
24 May — 26 May
Delays likely Traffic control (two-way signals)
Works location: 218 Newport Road , Cowes, Isle Of Wight.
Works description: Remedial Reinstatement Of Sunken Patch In Trench Line, Defect No 1668
Responsibility for works: Southern Water
Current status: Advanced planning
A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
24 May — 24 July
Delays likely Road closure
Works location: Shalfleet: From Hamstead Drive 340m East (Ml610034): Main Road-Shalfleet
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) Shalfleet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Beechcroft Drive, Wootton, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Wootton: Ml 340425 Whole Road: Beechcroft Drive-Wootton
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Broadway Crescent, Binstead, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Binstead: Ml 340566 From Winston Avenue To St Vincents Road: Broadway Crescent-Binstead
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Buckbury Heights, Newport, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Newport: Ml 260212 Whole Road: Buckbury Heights-Newport
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Billingham Shute, Shorwell, Isle Of Wight
25 May — 08 June
Delays likely Road closure
Works location: Shorwell: Ml 630223 From West Billingham Farm To A Point 512 Meters North Thereof To Berry Shute Cottage: Billingham Shu
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-L-M:R/H3 Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) (Kerbed=Inlay/Unkerbed=Overlay) Shorwell
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Castle Road, Ventnor, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Ventnor: 530125a Between The Junctions Of Gills Cliff Road And Zig Zag Road: Castle Road-Ventnor
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Mill Lane, Shorwell, Isle Of Wight
24 May — 03 June
Delays likely Road closure
Works location: Shorwell: From Pump House Lane To Wolverton Lane (Ml 640511): Mill Lane-Shorwell
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Castle Court, Ventnor, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Ventnor: Ml 540310 From O/S No. 30 To The Western End Of The Road: Castle Court-Ventnor
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Central Way, Sandown, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Sandown: Ml 440327 Whole Road Excluding Private Drive And Parking Areas Between No’S 25 & 29: Central Way-Sandown
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Chatfield Lodge, Newport, Isle Of Wight
24 May — 24 July
Delays likely Road closure
Works location: Newport: Ml 240304 From No’S. 1 To 4, And No’S. 17 To 23: Chatfield Lodge-Newport
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Ringwood Road, Binstead, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Binstead: Ml 340481 From Binstead Road To Stonelands Orchard: Ringwood Road-Binstead
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 High Street, Newport, Isle Of Wight
24 May — 07 June
Delays possible Some carriageway incursion
Works location: 1 High St Newport Isle Of Wight Iw
Works description: Change Faulty 150mm Boundary Meter & Rebuild Chamber In Footway.
Responsibility for works: Southern Water
Current status: Advanced planning
Landguard Manor Road, Shanklin, Isle Of Wight
25 May — 25 May
Delays possible Traffic control (Stop/Go boards)
Works location: Shanklin: From Green Lane To Witbank Gardens (Ml420270): Landguard Manor Road-Shanklin
Works description: Road Core Excavations Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Latimer Road, St Helens, Isle Of Wight
25 May — 27 May
Delays possible Traffic control (Stop/Go boards)
Works location: St Helens: Ml 330309 Between The Junctions Of Embankment Road And Bembridge Angling Club: Latimer Road-St Helens
Works description: # 46 Minor Drainage Scheme St Helens
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Swains Road, Bembridge, Isle Of Wight
25 May — 25 May
Delays possible Traffic control (two-way signals)
Works location: Junction Of Foreland Rd And Swains Rd Po35 5ud
Works description: Access Required To Underground Bt Structure To Repair Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant Between 09.30am-15.30pm
Responsibility for works: BT
Current status: Advanced planning
A3055 High Street, Niton, Isle Of Wight
25 May — 08 June
Delays unlikely Traffic control (give & take)
Works location: From O/S Novel Cottage To O/S Grey Stones
Works description: Excavation Of Cable And Trench In Footway For New Electrical Connection To New Property At Rear Of Post Office.
Responsibility for works: Southern Electric
Current status: Advanced planning
B3326 The Strand, Ryde, Isle Of Wight
24 May — 02 June
Delays unlikely Some carriageway incursion
Works location: Os 18a
Works description: Lay New Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning
Donnington Drive, Shanklin, Isle Of Wight
25 May — 02 June
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Junction With Landguard Manor Road To Mini Roundabout, 176m, Ml 440246: Donnington Drive-Shanklin
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit 50% Partrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Field Place, Newport, Isle Of Wight
25 May — 27 May
Delays unlikely No carriageway incursion
Works location: S/O 1 10 Mall Court On, Field Place
Works description: Install 17m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning
Mayfield Road, Ryde, Isle Of Wight
25 May — 07 June
Delays unlikely Traffic control (give & take)
Works location: Ryde: From The Junction With Binstead Road, West, Then South To Pellhurst Road (Ml 340623 & Ml 240570):
Works description: Replacement Of N� 10 Signs (4 X No Entry, 4 X One Way & 2 X No Through Road) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pell Lane, Ryde, Isle Of Wight
25 May — 07 June
Delays unlikely Traffic control (give & take)
Works location: Ryde: At The Junction Of Mayfieldn Road & Pell Lane (Ml 340531):
Works description: Replacement Of N� 2 Signs (1 X No Left Turn & 1 X No Right Turn) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St Marys Road, Cowes, Isle Of Wight
24 May — 02 June
Delays unlikely No carriageway incursion
Works location: Os 4 Anzac Cottages
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
Summers Court, Totland, Isle Of Wight
25 May — 31 May
Delays unlikely Traffic control (give & take)
Works location: Totland: Left Hand Spur, Ml 661565, 109m: Summers Court-Totland
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Town Quay, Cowes, Isle Of Wight
24 May — 06 June
Delays unlikely Some carriageway incursion
Works location: The Crane, Town Quay
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Wellington Road, Ryde, Isle Of Wight
25 May — 27 May
Delays unlikely Some carriageway incursion
Works location: 46 Wellington Road, Ryde, Isle Of Wight.
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning