Roadworks traffic light (Cowleaze)

Isle of Wight roadworks and road closures 24th May

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Newport Road, Cowes, Isle Of Wight
24 May — 26 May
Delays likely Traffic control (two-way signals)
Works location: 218 Newport Road , Cowes, Isle Of Wight.
Works description: Remedial Reinstatement Of Sunken Patch In Trench Line, Defect No 1668
Responsibility for works: Southern Water
Current status: Advanced planning


A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
24 May — 24 July
Delays likely Road closure
Works location: Shalfleet: From Hamstead Drive 340m East (Ml610034): Main Road-Shalfleet
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) Shalfleet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Beechcroft Drive, Wootton, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Wootton: Ml 340425 Whole Road: Beechcroft Drive-Wootton
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Broadway Crescent, Binstead, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Binstead: Ml 340566 From Winston Avenue To St Vincents Road: Broadway Crescent-Binstead
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Buckbury Heights, Newport, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Newport: Ml 260212 Whole Road: Buckbury Heights-Newport
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Billingham Shute, Shorwell, Isle Of Wight
25 May — 08 June
Delays likely Road closure
Works location: Shorwell: Ml 630223 From West Billingham Farm To A Point 512 Meters North Thereof To Berry Shute Cottage: Billingham Shu
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-L-M:R/H3 Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) (Kerbed=Inlay/Unkerbed=Overlay) Shorwell
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Castle Road, Ventnor, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Ventnor: 530125a Between The Junctions Of Gills Cliff Road And Zig Zag Road: Castle Road-Ventnor
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Mill Lane, Shorwell, Isle Of Wight
24 May — 03 June
Delays likely Road closure
Works location: Shorwell: From Pump House Lane To Wolverton Lane (Ml 640511): Mill Lane-Shorwell
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Castle Court, Ventnor, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Ventnor: Ml 540310 From O/S No. 30 To The Western End Of The Road: Castle Court-Ventnor
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Central Way, Sandown, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Sandown: Ml 440327 Whole Road Excluding Private Drive And Parking Areas Between No’S 25 & 29: Central Way-Sandown
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Chatfield Lodge, Newport, Isle Of Wight
24 May — 24 July
Delays likely Road closure
Works location: Newport: Ml 240304 From No’S. 1 To 4, And No’S. 17 To 23: Chatfield Lodge-Newport
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Ringwood Road, Binstead, Isle Of Wight
25 May — 25 July
Delays likely Road closure
Works location: Binstead: Ml 340481 From Binstead Road To Stonelands Orchard: Ringwood Road-Binstead
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


B3323 High Street, Newport, Isle Of Wight
24 May — 07 June
Delays possible Some carriageway incursion
Works location: 1 High St Newport Isle Of Wight Iw
Works description: Change Faulty 150mm Boundary Meter & Rebuild Chamber In Footway.
Responsibility for works: Southern Water
Current status: Advanced planning


Landguard Manor Road, Shanklin, Isle Of Wight
25 May — 25 May
Delays possible Traffic control (Stop/Go boards)
Works location: Shanklin: From Green Lane To Witbank Gardens (Ml420270): Landguard Manor Road-Shanklin
Works description: Road Core Excavations Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Latimer Road, St Helens, Isle Of Wight
25 May — 27 May
Delays possible Traffic control (Stop/Go boards)
Works location: St Helens: Ml 330309 Between The Junctions Of Embankment Road And Bembridge Angling Club: Latimer Road-St Helens
Works description: # 46 Minor Drainage Scheme St Helens
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Swains Road, Bembridge, Isle Of Wight
25 May — 25 May
Delays possible Traffic control (two-way signals)
Works location: Junction Of Foreland Rd And Swains Rd Po35 5ud
Works description: Access Required To Underground Bt Structure To Repair Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant Between 09.30am-15.30pm
Responsibility for works: BT
Current status: Advanced planning


A3055 High Street, Niton, Isle Of Wight
25 May — 08 June
Delays unlikely Traffic control (give & take)
Works location: From O/S Novel Cottage To O/S Grey Stones
Works description: Excavation Of Cable And Trench In Footway For New Electrical Connection To New Property At Rear Of Post Office.
Responsibility for works: Southern Electric
Current status: Advanced planning


B3326 The Strand, Ryde, Isle Of Wight
24 May — 02 June
Delays unlikely Some carriageway incursion
Works location: Os 18a
Works description: Lay New Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning


Donnington Drive, Shanklin, Isle Of Wight
25 May — 02 June
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Junction With Landguard Manor Road To Mini Roundabout, 176m, Ml 440246: Donnington Drive-Shanklin
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit 50% Partrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Field Place, Newport, Isle Of Wight
25 May — 27 May
Delays unlikely No carriageway incursion
Works location: S/O 1 10 Mall Court On, Field Place
Works description: Install 17m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning


Mayfield Road, Ryde, Isle Of Wight
25 May — 07 June
Delays unlikely Traffic control (give & take)
Works location: Ryde: From The Junction With Binstead Road, West, Then South To Pellhurst Road (Ml 340623 & Ml 240570):
Works description: Replacement Of N� 10 Signs (4 X No Entry, 4 X One Way & 2 X No Through Road) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Pell Lane, Ryde, Isle Of Wight
25 May — 07 June
Delays unlikely Traffic control (give & take)
Works location: Ryde: At The Junction Of Mayfieldn Road & Pell Lane (Ml 340531):
Works description: Replacement Of N� 2 Signs (1 X No Left Turn & 1 X No Right Turn) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


St Marys Road, Cowes, Isle Of Wight
24 May — 02 June
Delays unlikely No carriageway incursion
Works location: Os 4 Anzac Cottages
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning


Summers Court, Totland, Isle Of Wight
25 May — 31 May
Delays unlikely Traffic control (give & take)
Works location: Totland: Left Hand Spur, Ml 661565, 109m: Summers Court-Totland
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Town Quay, Cowes, Isle Of Wight
24 May — 06 June
Delays unlikely Some carriageway incursion
Works location: The Crane, Town Quay
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning


Wellington Road, Ryde, Isle Of Wight
25 May — 27 May
Delays unlikely Some carriageway incursion
Works location: 46 Wellington Road, Ryde, Isle Of Wight.
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Advertisement
Subscribe
Email updates?
0 Comments
oldest
newest most voted
Inline Feedbacks
View all comments
P Wilkins
12, February 2013 10:09 am

Is this the first time that these exams that ‘were the reason for the delay’ have happened at this time of year? If not, wouldn’t you have thought that they would have factored this necessary break into the original project plans … unless those doing the planning, or those overseeing it and signed it off were, yet again, not performing their roles to what many people might… Read more »

Don Smith
Reply to  P Wilkins
18, February 2013 7:04 pm

Will this delay at the Medina cause disruption
to the IoW festival? Where will the VIPs and the performers take a shower and park their vehicles?

I am informed that the alteration and up-grading of the pool, etceteras will not be completed until the end of June 2013. Or have I been misinformed?

Billy Builder
12, February 2013 10:35 am

This sounds like a significant time overrun on a project that cannot have been scheduled to take much more than 6 weeks for phase one. I take it that [part of comment removed by moderator] will be suspended pending investigation following this 50% (guessed) increase in project delivery. On a similar note, can we have an update as the the status of the suspended officers following the… Read more »

Martin Stones
Reply to  Billy Builder
12, February 2013 11:54 am

I would think that it would be highly unlikely that [part of comment removed by moderator] would be either suspended or sacked for this or any other failing, as he is part of the inner clique or rat pack that control the Council. [part of comment removed by moderator]

Martin Stones
Reply to  Martin Stones
12, February 2013 5:49 pm

I’m a little bit surprised that this comment has been moderated, as the person named was the person from the Council making the quote within the article. It is a very sad state of affairs if we cannot give our opinion on an article.

Sally Perry
Admin
Reply to  Martin Stones
12, February 2013 8:52 pm

Your comment and the one you were replying to (by Billy Builder) were both reported to us as potentially defamatory and damaging to the named officers. We immediately suspended the comments pending review and after seeking a legal opinion re-approved the comments with the necessary moderation.

Angela Rann
Reply to  Billy Builder
12, February 2013 7:43 pm

17.Dec.2012 5:01pm Is it now fashionable to be late or is it just the council? Every press release lately from the council mentions delays. If there was other pools and gyms in Newport then perhaps they would get things finished faster! Nothing changes does it? As I mentioned in December last year, late is the new on-time. Foot-in-mouth press release though by Mr M. ‘Scale of the… Read more »

Angela Rann
Reply to  Angela Rann
14, February 2013 8:17 pm

These press releases are now becoming a daily and growth industry for IW Council. Who is actually in charge of these projects and why is every delay unforeseen, not anticipated, not as expected. It really is stretching the use of language and press statements about our ‘customers’ and ‘keeping them informed’ about ‘slight delays’ – Yawn, yawn. Either the council knows what it is doing or it… Read more »

alex davies
Reply to  Billy Builder
14, February 2013 3:12 pm

Hey Billy,

Have you noticed that the Crematorium has now been delayed by three months due no doubt to the incompetent project management of the Deputy Director of the Environment. Mind you base on your earlier posting perhaps Stuart Love should take the hit

Sciolist
Reply to  alex davies
14, February 2013 3:30 pm

So, Cowes High is just the tip of the council’s construction incompetence iceberg? (Iceberg being the appropriate object for our Titanic council.)

Didn’t The Heights over-run badly too? Now we hear the crematorium is forcing delays and disruption on to Island families. You can’t even get a cremation without these clowns messing it up.

Does anyone remember a building project delivered on time or on budget?

matt.h
12, February 2013 11:32 am

Regarding the Cowes fiasco and the suspension of the two officers, are these people still suspended, if so, why? It must be at least 3 months since these individuals were suspended on full pay, surely the Council has been able to investigate this by now. If these people are guilty of gross misconduct, gross negligence, rodgering the CEO’s daughter, or what ever offence they are charged with,… Read more »

reCaptcha Error: grecaptcha is not defined