See the full list of roadworks taking place this week.
Long term closures (non flooding):
Cliff Path, Lake – closed to vehicles due to safety reasons
Cliff Path, Lake – closed to pedestrians from Winchester house car park to Skew Bridge path / Lake Cliff Gardens due to safety reasons
Cliff Path, Shanklin – closed to pedestrians between Delphi Road and St Boniface Cliff Road due to safety reasons
Hill Place Lane – closed to vehicles due to safety reasons
Knighton Lane & Knighton Shute, Newchurch – closed due to a poor surface (these roads will remain closed until the area dries out as the proposed surface treatment cannot be applied while the roads are wet)
Rew Lane, Ventnor – closed due to a poor surface
Undercliff Drive, Niton – between Mirables (in the west) and Seven Sisters Road (in the east) – closed for safety reasons
Roadworks starting today or tomorrow
A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
18 March — 20 March
Delays likely Traffic control (Stop/Go boards)
Works location: Os 4 Cottages , Whippingham Road
Works description: Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway
Responsibility for works: BT
A3054 Lushington Hill, Newport, Isle Of Wight
18 March — 20 March
Delays likely Traffic control (two-way signals)
Works location: Lushington Hill From Gravel Pit Road Heading West Along Lushington Hill And Finish At Jcn With Park Rd
Works description: 2 Way Rolling Traffic Lights Requested By Openreach For Heavy Cable Recovery .Engineer Michael Daltrey To Liaise With Mark Williams Of Island Roads And To Provide Him With Daily Progress Reports
Responsibility for works: BT
A3055 Lake Hill, Lake, Isle Of Wight
17 March — 28 March
Delays likely Traffic control (two-way signals)
Works location: Lake: From Lake Green Road, East To Battery Gardens (Ml 440403, 410044, 440424, 410045):
Works description: Install No 16 Lanterns (No 10 Columns) 4 Warning Signs, 1 Bus Stop Sign, 1 Direction Sign, 1 Lit Sign, 1 Floodlight And 1 Amber Flashing Sign Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 Sandown Road, Shanklin, Isle Of Wight
17 March — 19 March
Delays likely Traffic control (give & take)
Works location: In C/W O/S 35
Works description: Installing/Collecting/Downloading Data From Flow Monitor Within Manhole
Responsibility for works: Southern Water
A3056 Newport Road, Lake, Isle Of Wight
17 March — 31 March
Delays likely Road closure
Works location: Lake: From 250m West Of Lamorbey Road A Further 220m West (Ml410085): Newport Road-Lake
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Mersley Downs Road, Arreton, Isle Of Wight
17 March — 18 March
Delays likely Road closure
Works location: Arreton: J/O Newport Shute – J/O Lime Kiln Shute:
Works description: Supply And Install Stick On Road Studs (89) Tm Road Closure And Recommend Evening Works Arreto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Market Street, Ventnor, Isle Of Wight
17 March — 19 March
Delays likely Road closure
Works location: Ventnor: From High Street To Albert Street (Ml541264): Market Street-Ventnor
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3054 High Street, Wootton, Isle Of Wight
18 March — 20 March
Delays possible Traffic control (two-way signals)
Works location: High Street Begining At Jcn With Mill Square Heading West Along High Street And Finish At Jcn With Gravel Pit Rd
Works description: 2 Way Rolling Traffic Lights Requested By Openreach For Heavy Cable Recovery .Engineer Michael Daltrey To Liaise With Mark Williams Of Islands Roads And To Provide Him With Daily Progress Reports
Responsibility for works: BT
A3054 Kite Hill, Wootton, Isle Of Wight
18 March — 20 March
Delays possible Traffic control (two-way signals)
Works location: Kite Hill From Jcn At Fishbourne Lane West Across Wootton Bridge Finishing At Jcn With Mill Square
Works description: 2 Way Rolling Traffic Lights Requested By Openreach For Heavy Cable Recovery With No Excavation.Engineer Michael Daltrey To Liaise With Mark Williams Of Islands Roads And To Provide Him With Daily Progress Reports
Responsibility for works: BT
A3055 Broadway, Sandown, Isle Of Wight
18 March — 31 March
Delays possible Traffic control (two-way signals)
Works location: Sandown: From Junction Of Talbot Road, North To Avenue Road, (Ml 410045, 410046, 410047, 410048, 410049, 410050):
Works description: Install No 43 Lanterns ( No 7 X 8m Columns) 11 Bus Stops, 1 No Ball Games, 3 Route/Direction Signs, 7 Warning Signs, 3 Lit Warning Signs, 1 Public Notice, 2 Lit Speed Activation Signs And 2 Flashing Amber Lights Sandow
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 Sandown Road, Lake, Isle Of Wight
18 March — 20 March
Delays possible
Works location: 35 Sandown Rd
Works description: Perm Reinstatement Of F/Way
Responsibility for works: Southern Water
B3325 Park Road, Cowes, Isle Of Wight
17 March — 19 March
Delays possible Traffic control (two-way signals)
Works location: Cowes: From Victoria Road To Princes Street (Ml110049): Park Road-Cowes
Works description: Surfacing Preparatory Works, Replacing And Relaying Kerbs. Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council