Bath Road roadworks signage

Roadworks and road closures: 23rd January

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 High Street, Wootton, Isle Of Wight
24 January — 26 January
Delays likely Traffic control (Stop/Go boards)
Works location: High Street From Kite Hill To O/S The Telephone Exchange
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

A3054 Kite Hill, Wootton, Isle Of Wight
24 January — 26 January
Delays likely Traffic control (Stop/Go boards)
Works location: Kite Hill From Elenors Grove To High Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

A3054 Colwell Road, Freshwater, Isle Of Wight
23 January — 26 January
Delays unlikely No carriageway incursion
Works location: (Pcp6) Rear Of 11 Millways On , Colwell Road
Works description: Interim To Make Perm Notice In Fw.
Responsibility for works: BT
Current status: Advanced planning

B3401 Sun Hill, Calbourne, Isle Of Wight
24 January — 28 January
Delays unlikely Some carriageway incursion
Works location: O/S Four Winds , Sun Hill
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 12m Of 2 Poly Ducts In Footway,Install 1m Of 4 Poly Ducts In Footway,Install 3m Of 2 Poly Ducts In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Perowne Way, Sandown, Isle Of Wight
23 January — 27 January
Delays unlikely Traffic control (give & take)
Works location: Sandown: Link Footway Running In Front Of 35 Perowne Way (Ml F40678): Perowne Way-Sandown
Works description: Footway Re Construction And Surfacing (Fwl:Bit Partrecon) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sandown And Shanklin Footpath 2, Shanklin, Isle Of Wight
23 January — 05 February
Delays unlikely No carriageway incursion
Works location: From O/S Rosecliffe Lodge To Point 30mtrs To The North West
Works description: Excavation Of Jointbay In Footpath To Provide New Electrical Supplies To Chalet In Grounds Of Rosecliffe Lodge Backfill And Reinstate
Responsibility for works: Southern Electric
Current status: Advanced planning

Sunset Path, Freshwater, Isle Of Wight
23 January — 27 January
Delays unlikely Traffic control (give & take)
Works location: Freshwater: Link Footway Between Longhalves Lane & Sunset Close (Ml F60403): Sunset Path-Freshwater
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning