·2 min read
World experts on tunnelling have been to the Isle of Wight this week to give their views on the project including (for the first time) how long it might take to complete and how much it could cost.
The Fixed Link Tunnel campaign group, Pro-Link, has been campaigning for a feasibility study into the proposal for the Solent Tunnel – a fixed link between the Isle of Wight and Mainland – since 2014.
Run by Carl Feeny, Kevin Price and Tim Cooper, Able Connections Ltd has been set up as a body with which to communicate professionally with those in the transport industry.
Below are articles mentioning the fixed link debate, Solent Tunnel and Able Communications Ltd.